# |
Title |
Pgs |
Photo |
Type |
File |
1 |
NTSB ACCIDENT REPORT |
9 |
0 |
Text/Image |
View
|
2 |
TRACK AND ENGINEERING GROUP CHAIRMAN FACTUAL REPORT |
59 |
0 |
Text/Image |
View
|
3 |
UP TRACK PROFILE MP 904--924 |
5 |
0 |
Text/Image |
View
|
4 |
BRIDGE AND STRUCTURES BRIDGE PANEL INTERVIEW |
66 |
0 |
Text/Image |
View
|
5 |
UP ENGINEERING MANAGERS PANEL INTERVIEW |
55 |
0 |
Text/Image |
View
|
6 |
BRIDGE AND STRUCTURES BRIDGE 913.91 ELEVATION VIEW |
1 |
0 |
Text/Image |
View
|
7 |
BRIDGE AND STRUCTURES FRA BRIDGE SKETCH |
2 |
0 |
Text/Image |
View
|
8 |
BRIDGE AND STRUCTURES RAIL RE-BUILD OVERLAID ON BRIDGE APPROACH AT MP 913.91 |
1 |
0 |
Text/Image |
View
|
9 |
BRIDGE AND STRUCTURES UP STANDARD DRAWING 4005E DOUBLE INSIDE GUARD RAIL FOR OPEN DECK BRIDGES |
2 |
0 |
Text/Image |
View
|
10 |
BRIDGE AND STRUCTURES SOUTHERN PACIFIC LINES--COMMON STANDARD SINGLE TRACK BALLASTED DECK TRESTLE, ADOPTED MAY 1905, REVISED JANUARY 1929 |
1 |
0 |
Text/Image |
View
|
11 |
TRACK UP ENGINEERING TRACK MAINTENANCE FIELD HANDBOOK 3 TIES AND FASTENINGS |
37 |
0 |
Text/Image |
View
|
12 |
BRIDGE AND STRUCTURES FRA BRIDGE INSPECTION REPORT NO. 39, DATED JULY 30 2020 |
2 |
0 |
Text/Image |
View
|
13 |
BRIDGE AND STRUCTURES FRA BRIDGE INSPECTION REPORT NO. 40, DATED JULY 31 2020 |
2 |
0 |
Text/Image |
View
|
14 |
UP RAIL FLAW DETECTOR CAR DATA JANUARY TO JULY 2020 MP 910 TO 915 |
1 |
0 |
Text/Image |
View
|
15 |
UP TRACK GEOMETRY CAR EC DEFECTS JANUARY TO JULY MP 910--915 |
1 |
0 |
Text/Image |
View
|
16 |
UP ENGINEERING PHOENIX SUBDIVISION WORK EVENTS MP 910--915 FROM 3-20-20 TO 7-29-20 |
1 |
0 |
Text/Image |
View
|
17 |
COPY OF UP PHOENIX SUBDIVISION ALL WELDING REPORT MP 909 TO 915 |
1 |
0 |
Text/Image |
View
|
18 |
UP SERVICE FAILURES (RAIL) AND PULLAPARTS ON PHOENIX SUBDIVISION FROM 3-20-20 TO 7-31-2020 |
1 |
0 |
Text/Image |
View
|
19 |
UP CAPITAL PROJECTS 2015--2020 |
2 |
0 |
Text/Image |
View
|
20 |
UP TRACK INSPECTION RECORDS FROM 3-29-20 TO 5-28-2020 |
51 |
0 |
Text/Image |
View
|
21 |
UP TRACK INSPECTION RECORDS FOR PHOENIX SUBDIVISION FROM 5-29-20 TO 7-28-2020 |
71 |
0 |
Text/Image |
View
|
22 |
FRA TRACK INSPECTION RECORDS REVIEW (UP RECORDS), DATED 7-31-2020 |
1 |
0 |
Text/Image |
View
|
23 |
FRA INSPECTION REPORT, NO. 19, DATED 2-27-2020 |
3 |
0 |
Text/Image |
View
|
24 |
UP SUNSET AREA TIMETABLE NO. 5, EFFECTIVE 5-19-2020--PHOENIX SUBDIVISION |
6 |
0 |
Text/Image |
View
|
25 |
FRA RAIL EQUIPMENT ACCIDENT/INCIDENT REPORT, DATED 8-24-2020 |
1 |
0 |
Text/Image |
View
|
26 |
OPERATIONS GROUP CHAIRMAN FACTUAL REPORT |
12 |
0 |
Text/Image |
View
|
27 |
OPERATIONS INTERVIEW OF ENGINEER FOR MTUPX-29 |
19 |
0 |
Text/Image |
View
|
28 |
OPERATIONS INTERVIEW OF CONDUCTOR FOR MTUPX-29 |
21 |
0 |
Text/Image |
View
|
29 |
OPERATIONS INTERVIEW OF TRAINMAN FOR MTUPX-29 |
21 |
0 |
Text/Image |
View
|
30 |
OPERATIONS ATTACHMENT 1 UNION PACIFIC RULES SYSTEM SPECIAL INSTRUCTIONS (SECTIONS 1--4), EFFECTIVE APRIL 1, 2020 |
35 |
0 |
Text/Image |
View
|
31 |
HAZARDOUS MATERIALS FACTUAL REPORT |
14 |
0 |
Text/Image |
View
|
32 |
HAZARDOUS MATERIALS ATTACHMENT 1 SAFETY DATA SHEET |
14 |
0 |
Text/Image |
View
|
33 |
HAZARDOUS MATERIALS ATTACHMENT 2 WAYBILLS |
6 |
0 |
Text/Image |
View
|
34 |
HAZARDOUS MATERIALS ATTACHMENT 3 PRETRANSPORTATION INSPECTIONS |
12 |
0 |
Text/Image |
View
|
35 |
HAZARDOUS MATERIALS ATTACHMENT 4 OUTAGE CALCULATIONS |
3 |
0 |
Text/Image |
View
|
36 |
HAZARDOUS MATERIALS ATTACHMENT 5 UP INFORMATION ON HAZMAT CONTAINMENT |
57 |
0 |
Text/Image |
View
|
37 |
HAZARDOUS MATERIALS ATTACHMENT 6 DAMAGE ASSESSMENT FORMS |
47 |
0 |
Text/Image |
View
|
38 |
MECHANICAL - FACTUAL REPORT |
8 |
0 |
Text/Image |
View
|
39 |
MECHANICAL ATTACHMENT 1 TRAIN CONSIST LIST FOR MTUPX-29 |
37 |
0 |
Text/Image |
View
|
40 |
MECHANICAL ATTACHMENT 2 AIR BRAKE TEST INSPECTION CERTIFICATE |
1 |
0 |
Text/Image |
View
|
41 |
MECHANICAL ATTACHMENT 3 FRA FORM 6180.49A FOR LOCOMOTIVE CONSIST (BLUE CARDS) 7-29-2020 |
6 |
0 |
Text/Image |
View
|
42 |
MECHANICAL ATTACHMENT 4 FRA POSTACCIDENT INSPECTION RECORD NO. 64, DATED7-30-2020 |
1 |
0 |
Text/Image |
View
|
43 |
MECHANICAL ATTACHMENT 5 FRA POSTACCIDENT INSPECTION RECORD OF NON-DERAILED EQUIPMENT, REPORT NO. 79, DATED 8-1-2020 |
1 |
0 |
Text/Image |
View
|
44 |
MECHANICAL ATTACHMENT 6 HOT BOX DETECTOR DATA FOR MTUPX-29 |
69 |
0 |
Text/Image |
View
|
45 |
MECHANICAL ATTACHMENT 7 LOCOMOTIVE MAINTENANCE HISTORY |
59 |
0 |
Text/Image |
View
|
46 |
MECHANICAL ATTACHMENT 8 REPAIR CAR HISTORY |
15 |
0 |
Text/Image |
View
|
47 |
MECHANICAL ATTACHMENT 9 UMLER DATA (CAR RECORDS) FOR MTUPX-29 |
3 |
0 |
Text/Image |
View
|
48 |
LOCOMOTIVE FORWARD-FACING VIDEO AND EVENT RECORDER - SPECIALISTA��S FACTUAL REPORT |
10 |
8 |
Text/Image |
View
|
49 |
LOCOMOTIVE FORWARD-FACING VIDEO AND EVENT RECORDER - ATTACHMENT 1 (TABULAR DATA) |
0 |
0 |
Other |
View
|
50 |
SURVIVAL FACTORS - GROUP CHAIRMANA��S FACTUAL REPORT OF THE INVESTIGATION |
170 |
0 |
Text/Image |
View
|
51 |
SURVIVAL FACTORS - GROUP CHAIRMANA��S SUPPLEMENTAL FACTUAL REPORT OF THE INVESTIGATION |
5 |
0 |
Text/Image |
View
|
52 |
SURVIVAL FACTORS - GROUP CHAIRMANA��S SUPPLEMENTAL # 2 FACTUAL REPORT OF THE INVESTIGATION |
21 |
0 |
Text/Image |
View
|
53 |
MATERIALS LABORATORY FACTUAL REPORT FOR RRD20LR005 |
39 |
34 |
Text/Image |
View
|
54 |
INTERVIEW OF UP ASSISTANT VICE PRESIDENT, BRIDGE MAINTENANCE AND CONSTRUCTION |
70 |
0 |
Text/Image |
View
|
55 |
BRIDGE GROUP CHAIRMAN'S FACTUAL REPORT |
30 |
0 |
Text/Image |
View
|
56 |
INTERVIEW OF UP DIRECTORS OF BRIDGE DESIGN AND ENVIRONMENT AND BRIDGE INSPECTIONS |
105 |
0 |
Text/Image |
View
|
57 |
BRIDGE GROUP ATTACHMENT UP BRIDGE 91391 2017 INSPECTION RECORD |
17 |
0 |
Text/Image |
View
|
58 |
BRIDGE GROUP ATTACHMENT UP BRIDGE 91391 RAILROAD BRIDGE DESIGNPLANS |
72 |
0 |
Text/Image |
View
|
59 |
BRIDGE GROUP ATTACHMENT UP BRIDGE 91391 2019 INSPECTION RECORD |
22 |
0 |
Text/Image |
View
|
60 |
BRIDGE GROUP ATTACHMENT UP DOCUMENT DESCRIBING BRIDGE INVENTORY |
7 |
0 |
Text/Image |
View
|
61 |
BRIDGE GROUP ATTACHMENT FRA EMAIL LISTING NUMBER OF RAILROAD BRIDGES IN US THAT CROSS OVER HIGHWAYS |
2 |
0 |
Text/Image |
View
|
62 |
DRONE PHOTO OF UP BRIDGE 91391, SHOWING FLARED INNER GUARDRAIL ON NEW BRIDGE CONSTRUCTION. |
1 |
0 |
Text/Image |
View
|
63 |
BRIDGE GROUP ATTACHMENT UP BRIDGE 913.91 2018 BRIDGE INSPECTION |
16 |
0 |
Text/Image |
View
|
64 |
BRIDGE GROUP ATTACHMENT UP BRIDGE 91.913 2020 INSPECTION |
13 |
0 |
Text/Image |
View
|
65 |
PARTY SUBMISSION FROM BROTHERHOOD OF LOCOMOTIVE ENGINEERS AND TRAINMEN--SAFETY TASK FORCE |
12 |
0 |
Text/Image |
View
|
66 |
PARTY SUBMISSION FROM ARIZONA CORPORATION COMMISSION |
7 |
0 |
Text/Image |
View
|