Title |
Pgs |
Photo |
Type |
1 |
NTSB - ADOPTED BOARD REPORT HAR-19/02 |
152 |
0 |
Text/Image |
2 |
DOCKET ITEM PLACEHOLDER PETITION FOR RECONSIDERATION SUBMITTED THROUGH COUNSEL BY DR. SHAMA |
1 |
0 |
Text/Image |
3 |
PARTY MEMBERS CERTIFICATE OF SERVICE FOR DR. SHAMAA��S SUBMISSION OF PETITION FOR RECONSIDERATION |
5 |
0 |
Text/Image |
4 |
FIGG BRIDGE ENGINEERS, INC. RESPONSE TO DR. SHAMAA��S SUBMISSION OF PETITION FOR RECONSIDERATION |
42 |
0 |
Text/Image |
5 |
NTSB BOARD RESPONSE TO DR. SHAMAA��S SUBMISSION OF PETITION FOR RECONSIDERATION |
4 |
0 |
Text/Image |
6 |
PEDESTRIAN BRIDGE COLLAPSE SUMMARY |
1 |
0 |
Text/Image |
7 |
PRELIMINARY REPORT |
4 |
0 |
Text/Image |
8 |
INVESTIGATIVE UPDATE #1 |
6 |
0 |
Text/Image |
9 |
INVESTIGATIVE UPDATE #2 |
2 |
0 |
Text/Image |
10 |
SURVIVAL FACTORS AND VEHICLE GROUP CHAIRMAN'S FACTUAL REPORT |
10 |
0 |
Text/Image |
11 |
SF AND VEHICLE ATTACHMENT MDPD REPORT |
5 |
0 |
Text/Image |
12 |
SURVIVAL AND VEHICLE ATTACHMENT MDPD INCIDENT REPORT |
45 |
0 |
Text/Image |
13 |
SF AND VEHICLE ATTACHMENT FHP INCIDENT REPORT |
14 |
0 |
Text/Image |
14 |
SF AND VEHICLE ATTACHMENT - FIU COMMUNICATIONS EVENT RECORD |
13 |
0 |
Text/Image |
15 |
SF AND VEHICLE ATTACHMENT FIU PD REPORT |
11 |
0 |
Text/Image |
16 |
SF AND VEHICLE ATTACHMENT FIU EOC ACTION PLAN AND STATEMENTS |
17 |
0 |
Text/Image |
17 |
SF AND VEHICLE ATTACHMENT SWEETWATER INCIDENT RECALL REPORT |
12 |
0 |
Text/Image |
18 |
SF AND VEHICLE ATTACHMENT DORAL INCIDENT RECALL REPORT |
11 |
0 |
Text/Image |
19 |
SF AND VEHICLE ATTACHMENT MDFR INFORMATION |
5 |
0 |
Text/Image |
20 |
SF AND VEHICLE ATTACHMENT NTSB INTERVIEWS |
21 |
0 |
Text/Image |
21 |
CORRADINO GROUP WITNESS INTERVIEW TRANSCRIPT |
47 |
0 |
Text/Image |
22 |
VSL TRANSCRIPTS |
63 |
0 |
Text/Image |
23 |
LOUIS BERGER INTERVIEW TRANSCRIPT |
33 |
0 |
Text/Image |
24 |
GEORGE'S CRANE SERVICE INTERVIEW TRANSCRIPT |
34 |
0 |
Text/Image |
25 |
FIGG INTERVIEW TRANSCRIPT |
295 |
0 |
Text/Image |
26 |
FDOT INTERVIEW TRANSCRIPT |
27 |
0 |
Text/Image |
27 |
BPA TRANSCRIPTS |
127 |
0 |
Text/Image |
28 |
MCM INTERVIEW TRANSCRIPTION |
100 |
0 |
Text/Image |
29 |
STRUCTURAL GROUP OF SOUTH FLORIDA INTERVIEW TRANSCRIPT |
40 |
0 |
Text/Image |
30 |
BRIDGE FACTORS GROUP CHAIRMAN'S FACTUAL REPORT |
206 |
0 |
Text/Image |
31 |
BRIDGE FACTORS ATTACHMENT 1 - T.Y. LIN INTERNATIONAL SCOPE OF WORK FOR 2013 GRANT SUBMISSION |
14 |
0 |
Text/Image |
32 |
BRIDGE FACTORS ATTACHMENT 2 - EMAIL FROM MR. KENNETH JESSELL OF FIU TO MR. DAN WALSH OF NTSB DATED JUNE 8, 2018 |
2 |
0 |
Text/Image |
33 |
BRIDGE FACTORS ATTACHMENT 3 - TIGER ORIGINAL GRANT AGREEMENT DATED JUNE 5, 2014 |
26 |
0 |
Text/Image |
34 |
BRIDGE FACTORS ATTACHMENT 4 - TIGER GRANT ADDENDUM NO. 1 DATED JANUARY 12, 2016 |
21 |
0 |
Text/Image |
35 |
BRIDGE FACTORS ATTACHMENT 5 - TIGER GRANT AMENDMENT NO. 2 DATED DECEMBER 11, 2017 |
16 |
0 |
Text/Image |
36 |
BRIDGE FACTORS ATTACHMENT 6 - FDOT LOCAL AGENCY PROGRAM (LAP) MANUAL CHAPTER 3 DATED SEPTEMBER 18, 2013 |
9 |
0 |
Text/Image |
37 |
BRIDGE FACTORS ATTACHMENT 7 - EMAIL FROM MS. XIOMARA NUNEZ OF FDOT TO MR. DAN WALSH OF NTSB DATED AUGUST 17, 2018 |
3 |
0 |
Text/Image |
38 |
BRIDGE FACTORS ATTACHMENT 8 - FDOT LOCAL AGENCY PROGRAM (LAP) AGREEMENT DATED JUNE 23, 2014 |
22 |
0 |
Text/Image |
39 |
BRIDGE FACTORS ATTACHMENT 9 - FDOT LOCAL AGENCY PROGRAM (LAP) SUPPLEMENTAL AGREEMENT NO. 1 DATED JUNE 2, 2017 |
7 |
0 |
Text/Image |
40 |
BRIDGE FACTORS ATTACHMENT 10 - FDOT LOCAL AGENCY PROGRAM (LAP) AMENDMENT EXTENSION REQUEST DATED JANUARY 2, 2018 |
2 |
0 |
Text/Image |
41 |
BRIDGE FACTORS ATTACHMENT 11 - FIU DESIGN BUILD MAXIMUM PRICE REQUEST FOR PROPOSALS |
56 |
0 |
Text/Image |
42 |
BRIDGE FACTORS ATTACHMENT 12 - FIU PEDESTRIAN BRIDGE DESIGN CRITERIA DATED JUNE 2014 |
81 |
0 |
Text/Image |
43 |
BRIDGE FACTORS ATTACHMENT 13 - LETTER TO MR. JORGE J. RIVERA, DISTRICT VI TRANSPORTATION ENGINEER, FHWA, FROM MR. AIAH YASSIN, DISTRICT LOCAL PROGRAM ADMINISTRATOR, FDOT, DATED NOVEMBER 10, 2015 |
19 |
0 |
Text/Image |
44 |
BRIDGE FACTORS ATTACHMENT 14 - LETTER TO MR. JORGE J. RIVERA, DISTRICT VI TRANSPORTATION ENGINEER, FHWA, FROM MR. AIAH YASSIN, DISTRICT LOCAL PROGRAM ADMINISTRATOR, FDOT, DATED AUGUST 23, 2016 |
20 |
0 |
Text/Image |
45 |
BRIDGE FACTORS ATTACHMENT 15 - FIU DESIGN-BUILD CONTRACT, ENTERED INTO BY THE FLORIDA INTERNATIONAL UNIVERSITY BOARD OF TRUSTEES AND MUNILLA CONSTRUCTION MANAGEMENT (MCM) DATED JANUARY 14, 2016 |
15 |
0 |
Text/Image |
46 |
BRIDGE FACTORS ATTACHMENT 16 - FIU GENERAL SPECIFICATIONS FOR DESIGN-BUILD CONTRACT BETWEEN FIU AND MCM, REVISED JUNE 9, 2014 |
177 |
0 |
Text/Image |
47 |
BRIDGE FACTORS ATTACHMENT 17 - FIU STANDARD PROFESSIONAL SERVICES AGREEMENT, ENTERED INTO BY THE FLORIDA INTERNATIONAL UNIVERSITY BOARD OF TRUSTEES AND BOLTON PEREZ & ASSOCIATES (BPA) DATED SEPTEMBER 23, 2016 |
59 |
0 |
Text/Image |
48 |
BRIDGE FACTORS ATTACHMENT 18 - STANDARD FORM OF AGREEMENT BETWEEN DESIGN-BUILDER AND DESIGN CONSULTANT, ENTERED INTO BY MCM AND FIGG BRIDGE ENGINEERS, INC. DATED APRIL 28, 2016 |
35 |
0 |
Text/Image |
49 |
BRIDGE FACTORS ATTACHMENT 19 - AGREEMENT ENTERED INTO BY FIGG BRIDGE ENGINEERS, INC. AND LOUIS BERGER DATED SEPTEMBER 16, 2016 |
44 |
0 |
Text/Image |
50 |
BRIDGE FACTORS ATTACHMENT 20 - FDOT AVERAGE ANNUAL DAILY TRAFFIC (AADT) AND LANE WIDTHS ON SW 8TH STREET |
7 |
0 |
Text/Image |
51 |
BRIDGE FACTORS ATTACHMENT 21 - BPA CRACKS REPORT NO. 1 - EMAIL FROM MR. JOSE MORALES OF BPA TO MR. RODRIGO ISAZA OF MCM DATED FEBRUARY 13, 2018 |
9 |
0 |
Text/Image |
52 |
BRIDGE FACTORS ATTACHMENT 22 - BPA CRACKS REPORT NO. 2 - EMAIL FROM MR. JOSE MORALES OF BPA TO MR. RODRIGO ISAZA OF MCM DATED FEBRUARY 28, 2018 |
10 |
0 |
Text/Image |
53 |
BRIDGE FACTORS ATTACHMENT 23 - TEXTS FROM MR. KEVIN HANSON OF STRUCTURAL TECHNOLOGIES ON HIS MOBILE DEVICE DATED MARCH 10, 2018 |
8 |
0 |
Text/Image |
54 |
BRIDGE FACTORS ATTACHMENT 24 - EMAIL FROM MR. RODRIGO ISAZA OF MCM TO MR. DWIGHT DEMPSEY OF FIGG DATED MARCH 12, 2018 |
20 |
0 |
Text/Image |
55 |
BRIDGE FACTORS ATTACHMENT 25 - EMAIL FROM MR. DWIGHT DEMPSEY OF FIGG TO MR. RODRIGO ISAZA OF MCM DATED MARCH 13, 2018 AT 9 45 A.M. |
3 |
0 |
Text/Image |
56 |
BRIDGE FACTORS ATTACHMENT 26 - BPA CRACKS REPORT NO. 3 - EMAIL FROM MR. JOSE MORALES OF BPA TO MR. RODRIGO ISAZA OF MCM DATED MARCH 13, 2018 |
21 |
0 |
Text/Image |
57 |
BRIDGE FACTORS ATTACHMENT 27 - EMAIL FROM MR. DWIGHT DEMPSEY OF FIGG TO MR. RODRIGO ISAZA OF MCM DATED MARCH 13, 2018 AT 5 18 22 P.M. |
6 |
0 |
Text/Image |
58 |
BRIDGE FACTORS ATTACHMENT 28 - EMAIL FROM MR. SAM NUNEZ OF STRUCTURAL TECHNOLOGIES TO MR. RODRIGO ISAZA OF MCM DATED MARCH 14, 2018 |
9 |
0 |
Text/Image |
59 |
BRIDGE FACTORS ATTACHMENT 29 - EMAIL FROM MR. RODRIGO ISAZA OF MCM TO MR. DWIGHT DEMPSEY OF FIGG DATED MARCH 14, 2018 |
15 |
0 |
Text/Image |
60 |
BRIDGE FACTORS ATTACHMENT 30 - BPA 3/15/18 MEETING MINUTES |
4 |
0 |
Text/Image |
61 |
BRIDGE FACTORS ATTACHMENT 31 - FIGG 3/15/18 MEETING MINUTES |
5 |
0 |
Text/Image |
62 |
BRIDGE FACTORS ATTACHMENT 32 - FIGG 3/15/18 POWER POINT PRESENTATION |
49 |
0 |
Text/Image |
63 |
BRIDGE FACTORS ATTACHMENT 33 - EMAIL FROM MR. ALAN PHIPPS OF FIGG TO MR. DAN WALSH OF NTSB DATED JULY 12, 2018 |
2 |
0 |
Text/Image |
64 |
BRIDGE FACTORS ATTACHMENT 34 - EMAIL FROM MR. ALFREDO REYNA OF FDOT TO MR. ALBERTO DELGADO OF FIU DATED OCTOBER 12, 2016 |
2 |
0 |
Text/Image |
65 |
BRIDGE FACTORS ATTACHMENT 35 - MINUTES OF MEETING PREPARED BY BOLTON PEREZ & ASSOCIATES (BPA) WITH SIGN-IN SHEET ATTACHED DATED OCTOBER 31, 2016 |
3 |
0 |
Text/Image |
66 |
BRIDGE FACTORS ATTACHMENT 36 - EMAIL FROM MR. JOAQUIN (JAKE) PEREZ OF BPA TO MR. DAN WALSH OF NTSB DATED AUGUST 7, 2018 |
3 |
0 |
Text/Image |
67 |
BRIDGE FACTORS ATTACHMENT 37 - EMAIL FROM MR. ALAN PHIPPS OF FIGG TO MR. DAN WALSH OF NTSB DATED AUGUST 27, 2018 |
2 |
0 |
Text/Image |
68 |
FACTORS ATTACHMENT 38 - FIU PEDESTRIAN BRIDGE SUPERSTRUCTURE PLANS INCLUDING CONSTRUCTION SEQUENCE PLANS |
55 |
0 |
Text/Image |
69 |
BRIDGE FACTORS ATTACHMENT 39 - FIU PEDESTRIAN BRIDGE GENERAL PLAN AND ELEVATION AND FOUNDATION LAYOUT |
5 |
0 |
Text/Image |
70 |
BRIDGE FACTORS ATTACHMENT 40 - PERCENT FIU BRIDGE COMPLETION AT THE TIME OF THE COLLAPSE |
2 |
0 |
Text/Image |
71 |
BRIDGE FACTORS ATTACHMENT 41 - EMAIL FROM MR. JOHN ENGBERG OF BARNHART CRANE AND RIGGING TO MR. DAN WALSH OF NTSB DATED AUGUST 20, 2018 |
3 |
0 |
Text/Image |
72 |
BRIDGE FACTORS ATTACHMENT 42 - COMPARISON OF FDOT PROJECTS VERSUS LAP PROJECTS FOR THE LAST 5 YEARS |
5 |
0 |
Text/Image |
73 |
BRIDGE FACTORS ATTACHMENT 43 - FDOT LOCAL AGENCY PROGRAM (LAP) MANUAL, CHAPTERS 19 AND 20, DATED MARCH 28, 2008 |
11 |
0 |
Text/Image |
74 |
BRIDGE FACTORS ATTACHMENT 44 - FDOT PLANS PREPARATION MANUAL (PPM), VOLUME 1, CHAPTER 26 - BRIDGE PROJECT DEVELOPMENT, JANUARY 1, 2014 |
67 |
0 |
Text/Image |
75 |
BRIDGE FACTORS ATTACHMENT 45 - FDOT STRUCTURES DESIGN OFFICE (SDO) ELECTRONIC REVIEW AND EMAIL COMMENTS ON SUBMITTAL PHASES FOR THE SIGNATURE PEDESTRIAN BRIDGE |
141 |
0 |
Text/Image |
76 |
BRIDGE FACTORS ATTACHMENT 46 - EMAIL FROM MR. TOM ANDRES OF FDOT TO MR. DAN WALSH OF NTSB DATED MAY 3, 2018 |
9 |
0 |
Text/Image |
77 |
BRIDGE FACTORS ATTACHMENT 47 - EMAIL FROM MR. TOM ANDRES OF FDOT TO MR. DAN WALSH OF NTSB DATED APRIL 26, 2018 |
2 |
0 |
Text/Image |
78 |
BRIDGE FACTORS ATTACHMENT 48 - 100% CERTIFICATION LETTERS SIGNED AND SEALED BY LOUIS BERGER |
4 |
0 |
Text/Image |
79 |
BRIDGE FACTORS ATTACHMENT 49 - FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, DIVISION II - CONSTRUCTION DETAILS, STRUCTURES, DATED JANUARY 2015 |
4 |
0 |
Text/Image |
80 |
BRIDGE FACTORS ATTACHMENT 50 - EXCERPTS FROM RULE 14-75 OF THE FLORIDA ADMINISTRATIVE CODE |
5 |
0 |
Text/Image |
81 |
BRIDGE FACTORS ATTACHMENT 51 - EMAILS FROM MR. TOM ANDRES OF FDOT TO MR. DAN WALSH OF NTSB DATED APRIL 20, 2018 AND MAY 22, 2018 |
2 |
0 |
Text/Image |
82 |
BRIDGE FACTORS ATTACHMENT 52 - EMAIL FROM MS. ROBIN MALACREA OF LOUIS BERGER TO MS. CARLIAYN KELL OF FDOT DATED DECEMBER 28, 2016 |
2 |
0 |
Text/Image |
83 |
BRIDGE FACTORS ATTACHMENT 53 - LETTER FROM MS. CARLIAYN KELL OF FDOT TO MR. ERNESTO POLO OF LOUIS BERGER DATED JANUARY 17, 2017 |
13 |
0 |
Text/Image |
84 |
BRIDGE FACTORS ATTACHMENT 54 - AASHTO LOAD AND RESISTANCE FACTOR DESIGN (LRFD) BRIDGE DESIGN SPECIFICATIONS, 7TH EDITION, 2014, WITH 2015 INTERIMS, GUIDANCE ON REDUNDANCY |
7 |
0 |
Text/Image |
85 |
BRIDGE FACTORS ATTACHMENT 55 - FDOT STRUCTURES DESIGN GUIDELINES (SDG), STRUCTURES MANUAL VOLUME 1, DATED JANUARY 2015 |
5 |
0 |
Text/Image |
86 |
BRIDGE FACTORS ATTACHMENT 56 - FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, DIVISION II - CONSTRUCTION DETAILS, SECTION 102 MAINTENANCE OF TRAFFIC, DATED JANUARY 2015 |
3 |
0 |
Text/Image |
87 |
BRIDGE FACTORS ATTACHMENT 57 - FDOT CONSTRUCTION PROJECT ADMINISTRATION MANUAL, SECTION 9.1 MAINTENANCE OF TRAFFIC, 9.1.8 RECOMMENDED ACTION TO SHUT DOWN A PROJECT DUE TO MOT DEFICIENCIES, DATED APRIL 11, 2014 |
6 |
0 |
Text/Image |
88 |
BRIDGE FACTORS ATTACHMENT 58 - FLORIDA ADMINISTRATIVE CODE 61G15-18.011 |
3 |
0 |
Text/Image |
89 |
BRIDGE FACTORS ATTACHMENT 59 - FDOT TWO-LANE BLANKET ROAD CLOSURE |
4 |
0 |
Text/Image |
90 |
BRIDGE FACTORS ATTACHMENT 60 - FDOT GENERAL USE PERMIT |
97 |
0 |
Text/Image |
91 |
BRIDGE FACTORS ATTACHMENT 61 - MCM AND FIGG BRIDGE ENGINEERS, INC. AGREEMENT, CHANGE ORDER REQUEST NO. 1, DATED FEBRUARY 6, 2017 |
5 |
0 |
Text/Image |
92 |
BRIDGE FACTORS ATTACHMENT 62 - MCM AND FIGG BRIDGE ENGINEERS, INC. AGREEMENT, CHANGE ORDER REQUEST NO. 8, DATED OCTOBER 18, 2017 |
14 |
0 |
Text/Image |
93 |
BRIDGE FACTORS ATTACHMENT 63 - FIGG BRIDGE ENGINEERS, INC. ATTACHMENT DATA AND TIMELINE |
656 |
0 |
Text/Image |
94 |
BRIDGE FACTORS ATTACHMENT 64 - BOLTON PEREZ & ASSOCIATES (BPA) ATTACHMENT COLD JOINT DATA |
18 |
0 |
Text/Image |
95 |
BRIDGE FACTORS ATTACHMENT 65 - FDOT'S FOLLOW-UP TO NTSB QUESTIONS |
13 |
0 |
Text/Image |
96 |
BRIDGE FACTORS ATTACHMENT 66 - MCMA��S ATTACHMENT SUBCONTRACT AGREEMENT DATA |
23 |
0 |
Text/Image |
97 |
BRIDGE FACTORS ATTACHMENT 67 - FDOT CONSTRUCTION PROJECT ADMINISTRATION MANUAL, SECTION 4.1 ADMINISTRATION OF CONSULTANT CEI CONTRACTS, DATED NOVEMBER 2, 2012 |
8 |
0 |
Text/Image |
98 |
BRIDGE FACTORS ATTACHMENT 68 - FIU PEDESTRIAN BRIDGE PYLON DIAPHRAGM DIMENSIONS AND REINFORCEMENT PLANS |
37 |
0 |
Text/Image |
99 |
BRIDGE FACTORS ATTACHMENT 69 - AASHTO LOAD AND RESISTANCE FACTOR DESIGN (LRFD) BRIDGE DESIGN SPECIFICATIONS, 7TH EDITION, 2014, WITH 2015 INTERIMS, GUIDANCE ON INTENTIONALLY ROUGHENED SURFACE |
3 |
0 |
Text/Image |
100 |
BRIDGE FACTORS ATTACHMENT 70 - FIU SUPERSTRUCTURE - LONGITUDINAL & TRANSVERSE RFC DESIGN CALCULATIONS |
1457 |
0 |
Text/Image |
101 |
BRIDGE FACTORS ATTACHMENT 71 - FIU SUPERSTRUCTURE - MISCELLANEOUS DETAILS RFC DESIGN CALCULATIONS |
399 |
0 |
Text/Image |
102 |
BRIDGE FACTORS ATTACHMENT 72 - FDOT LETTER TO LOUIS BERGER DATED MARCH 18, 2013 INDICATING STATUS IS INSUFFICIENT FOR 4.3.1 COMPLEX BRIDGE DESIGN - CONCRETE |
17 |
0 |
Text/Image |
103 |
BRIDGE FACTORS ATTACHMENT 73 - FHWA ASSESSMENT OF BRIDGE DESIGN AND PERFORMANCE |
91 |
0 |
Text/Image |
104 |
BRIDGE FACTORS ATTACHMENT 74 - FHWA TURNER-FAIRBANK HIGHWAY RESEARCH CENTER FACTUAL REPORT FOR CONCRETE INTERFACE UNDER MEMBERS 11 AND 12 |
16 |
0 |
Text/Image |
105 |
BRIDGE FACTORS PHOTOGRAPHS 1 THROUGH 111 |
84 |
111 |
Text/Image |
106 |
BRIDGE FACTORS PHOTOGRAPHS - FIGG BRIDGE ENGINEERS, INC. SUBMITTAL OF PHOTOGRAPHIC EVIDENCE |
133 |
0 |
Text/Image |
107 |
BRIDGE FACTORS PHOTOGRAPHS - MCMA��S SUBMITTAL OF PHOTOGRAPHIC EVIDENCE |
9 |
4 |
Text/Image |
108 |
FIGG FACTOR OF SAFETY PRESENTATION AND CALCULATIONS |
403 |
0 |
Text/Image |
109 |
FHWA ASSESSMENT OF FIGG FACTOR OF SAFETY PRESENTATION AND CALCULATION |
3 |
0 |
Text/Image |
110 |
PERSONAL ELECTRONIC DEVICE - SPECIALIST'S FACTUAL REPORT |
2 |
0 |
Text/Image |
111 |
SECURITY VIDEO FACTUAL REPORT |
19 |
0 |
Text/Image |
112 |
ERRATA - SECURITY VIDEO FACTUAL REPORT |
2 |
0 |
Text/Image |
113 |
MATERIALS LABORATORY STUDY REPORT - TIO2 NANOPARTICLES IN CONCRETE |
4 |
0 |
Text/Image |
114 |
MATERIALS LABORATORY FACTUAL REPORT - FHWA TFHRC POST-TENSIONING SYSTEM PERFORMANCE TESTING |
28 |
0 |
Text/Image |
115 |
MATERIALS LABORATORY STUDY REPORT - MEMBER 11-12 SURFACE ROUGHNESS |
16 |
0 |
Text/Image |
116 |
MATERIALS LABORATORY FACTUAL REPORT - FHWA TFHRC STEEL AND CONCRETE MATERIALS TESTING |
67 |
0 |
Text/Image |
117 |
COMBINED SIGNED PARTY FORMS |
7 |
0 |
Text/Image |
118 |
NTSB REVOCATION OF OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) PARTY MEMBER STATUS |
2 |
0 |
Text/Image |
119 |
MIAMI FL TECHNICAL REVIEW COVER LETTER AND EMAIL CORRESPONDENCE |
9 |
0 |
Text/Image |
120 |
FLORIDA DEPARTMENT OF TRANSPORTATION PARTY SUBMISSION; FINDINGS, CONCLUSIONS, AND RECOMMENDATIONS |
4 |
0 |
Text/Image |
121 |
MCM PARTY SUBMISSION; FINDINGS, CONCLUSIONS, RECOMMENDATIONS, AND ATTACHMENTS |
125 |
0 |
Text/Image |
122 |
FIGG BRIDGE ENGINEERS, INC. PARTY SUBMISSION; FINDINGS, CONCLUSIONS, RECOMMENDATIONS, AND ATTACHMENTS |
344 |
0 |
Text/Image |
123 |
PARTY LETTER DATED 10-05-19 REQUESTING DELAY IN OPENING PUBLIC DOCKET AND CHAIRMAN SUMWALT'S RESPONSE LETTER DATED 10-07-19 |
3 |
0 |
Text/Image |
124 |
FIGG'S PRESENTATION OF PARTY SUBMISSION TO THE NATIONAL TRANSPORTATION SAFETY BOARD |
107 |
0 |
Text/Image |
125 |
MODJESKI AND MASTERS EVALUATION OF DOCKET ITEMS FROM LOUIS BERGER |
13 |
0 |
Text/Image |
126 |
LETTER TO CHAIRMAN SUMWALT FROM MR. LEE MOAK REGARDING FHWA ASSESSMENT |
3 |
0 |
Text/Image |