Project Summary: Rail Investigation - 74 Docket Items - DCA17FR002

Description: Long Island Railroad train 2817 derailed and struck a bumper

Mode: Rail

NTSB Number: DCA17FR002

Date of Accident: 01/04/2017

City: Brooklyn

State / Region: NY

Country: United States

Project Type: Investigation


Docket Information

Creation Date: 09/19/17

Last Modified: 02/06/2018 11:51 AM

Public Release Date & Time: 09/21/2017 9:00 AM


Docket Items: 74

#

Title

Pgs

Photo

Type

1 Accident Summary 2 0 Adobe PDF file
2 Operations Factual Report 16 0 Adobe PDF file
3 LIRR Operating Rule Book 42 0 Adobe PDF file
4 LIRR Timetable No.2 2 0 Adobe PDF file
5 LIRR Special Instructions 25 0 Adobe PDF file
6 LIRR Train Handling and Equipment Manual 14 0 Adobe PDF file
7 LIRR Signal Rules 22 0 Adobe PDF file
8 Conductor and Assistant Conductor 30 Day Work History 6 0 Adobe PDF file
9 2817 Train Engineer 30 Day Work History 3 0 Adobe PDF file
10 Engineer Efficiency Tests Records 6 0 Adobe PDF file
11 Conductor Efficiency Tests Records 7 0 Adobe PDF file
12 Assistant Conductor Efficiency Tests Records 8 0 Adobe PDF file
13 2817 Train Crew Exam Records 1 0 Adobe PDF file
14 Engineer Interview 69 0 Adobe PDF file
15 Conductor Smith Interview 49 0 Adobe PDF file
16 Asst. Conductor Vazoulas Interview 42 0 Adobe PDF file
17 Witness Interview 22 0 Adobe PDF file
18 Conductor Fiorino Interview 39 0 Adobe PDF file
19 Interview - Lead Transportation Manager Wetzel 52 0 Adobe PDF file
20 Interview - Conductor Jacob 53 0 Adobe PDF file
21 Interview - Asst. Conductor Mack 15 0 Adobe PDF file
22 Interview - Asst. Conductor Frank 46 0 Adobe PDF file
23 Interview - Engineer Saurez 27 0 Adobe PDF file
24 Interview - Conductor Pennel 16 0 Adobe PDF file
25 Interview - Superintendent of Engine Service Becker 56 0 Adobe PDF file
26 Signal and Train Control Group - Factual Report 7 0 Adobe PDF file
27 Signal and Train Control Attachment #1 - LIRR Power Log 4 0 Adobe PDF file
28 Signal and Train Control Attachment #2 - LIRR Train 2817 Performance Report 1 0 Adobe PDF file
29 Signal and Train Control Attachment #3 - LIRR Postaccident Route Test Records 4 0 Adobe PDF file
30 Signal and Train Control Attachment #4 - LIRR Postaccident Switch Test Records 9 0 Adobe PDF file
31 Signal and Train Control Attachment #5 - LIRR Switch Maintenance Records 12 0 Adobe PDF file
32 Signal and Train Control Attachment #6 - LIRR Track Circuit Test Records 7 0 Adobe PDF file
33 Signal and Train Control Attachment #7 - LIRR Signal Trouble Tickets 46 0 Adobe PDF file
34 Track and Engineering Factual Report 17 2 Adobe PDF file
35 Bulletin 1038-B 5 mph Speed Restriction 1 0 Adobe PDF file
36 LIRR System Map 1 0 Adobe PDF file
37 Train Route from Main Track 1 to Main Track 2 to Station Track 6 1 0 Adobe PDF file
38 Curve Diagram 1 0 Adobe PDF file
39 LIRR Atlantic Terminal Diagram 1 0 Adobe PDF file
40 Interview with Bumping Post Manufacture 29 0 Adobe PDF file
41 LIRR Bumping Block Inventory 25 0 Adobe PDF file
42 Main Track 1 Geometry Car Exception Report 2 0 Adobe PDF file
43 Main Track 2 Geometry Car Exception Report 2 0 Adobe PDF file
44 Station Track 6 Geometry Car Exception Report 1 0 Adobe PDF file
45 Station Track 6 Gradient 1 0 Adobe PDF file
46 Tribometer Readings 2 0 Adobe PDF file
47 November 19, 2015 FRA Inspection Report 1 0 Adobe PDF file
48 December 27, 2016 FRA Inspection Report 1 0 Adobe PDF file
49 January 5, 2017 FRA Inspection Report 1 0 Adobe PDF file
50 January 6, 2017 FRA Inspection Report 1 0 Adobe PDF file
51 August 19, 2016 Rail Inspection Report 6 0 Adobe PDF file
52 August 22, 2016 Rail Inspection Report 6 0 Adobe PDF file
53 Track Inspection Records 55 0 Adobe PDF file
54 Secured Hallway Drawing for Station Track #6 1 0 Adobe PDF file
55 Atlantic Terminal Reconstruction Drawings for Station Track #6 4 0 Adobe PDF file
56 APTA's SSPP Commuter Rail Manual 39 0 Adobe PDF file
57 System Safety Managers Interview 30 0 Adobe PDF file
58 Bumping Post Incidents at Passenger Terminals from 1997 to January 2017 3 0 Adobe PDF file
59 FRA Reported Bumping Post Incidents 10 0 Adobe PDF file
60 Safety Goal Implementation Program 94 0 Adobe PDF file
61 Safety Advisory 2016-03 3 0 Adobe PDF file
62 General Notice No. 2-52 1 0 Adobe PDF file
63 SSPP Elements Respective to Atlantic Terminal Hazard Identification and Mitigation 1 0 Adobe PDF file
64 State of New York Recertification of LIRR's SSPP 2 0 Adobe PDF file
65 Electric Multi-Unit (EMU) M7 Event Recorders - Specialist's Factual Report 10 0 Adobe PDF file
66 Electric Multi-Unit (EMU) M7 Event Recorders - Attachment 1 - Tabular Data (CSV) 0 0 Comma-delimited data file
67 Mechanical Factual Report 9 1 Adobe PDF file
68 Mechanical Records 235 0 Adobe PDF file
69 Medical Factual Report 26 0 Adobe PDF file
70 MTA OSA Screening and Referral Program 3 0 Adobe PDF file
71 MTA OSA Frequently Asked Questions 3 0 Adobe PDF file
72 Survival Factors Factual Report 8 4 Adobe PDF file
73 Long Island Rail Road System Safety Plan 135 0 Adobe PDF file
74 System Safety Factual Report 20 1 Adobe PDF file