# |
Title |
Pgs |
Photo |
Type |
1 |
Accident Summary |
2 |
0 |
Adobe PDF file |
2 |
Preliminary Report |
4 |
1 |
Adobe PDF file |
3 |
Adopted NTSB Brief |
9 |
1 |
Adobe PDF file |
4 |
Track and Engineering Factual Report |
14 |
6 |
Adobe PDF file |
5 |
Track- NJT Physical Characteristics (Excerpt) Hoboken Terminal |
1 |
0 |
Adobe PDF file |
6 |
Track- NJT System Timetable No.8 (Excerpts) Train Speeds |
2 |
0 |
Adobe PDF file |
7 |
Track- NJT Track Inspections Records - Dated 09/28/16 |
2 |
0 |
Adobe PDF file |
8 |
Track- NJT Rail Inspections Records- Dated 05/14/16 |
3 |
0 |
Adobe PDF file |
9 |
Track- FRA Inspection Report No. 168 - Dated 12/02/14 |
8 |
0 |
Adobe PDF file |
10 |
Track- FRA Inspection Report No.2 - Dated 01/07/15 |
3 |
0 |
Adobe PDF file |
11 |
Track- FRA Inspection Report No.117 - Dated 09/30/16 |
4 |
0 |
Adobe PDF file |
12 |
Track- FRA Inspection Report No.118 - Dated 10/03/16 |
1 |
0 |
Adobe PDF file |
13 |
Track- FRA Inspection Report No.119 - Dated 10/05/16 |
1 |
0 |
Adobe PDF file |
14 |
Track- FRA Inspection Report No.120 - Dated 10/05/16 |
1 |
0 |
Adobe PDF file |
15 |
Track- Hoboken Terminal Train Shed Bumping Post Drawing |
1 |
0 |
Adobe PDF file |
16 |
Interview with Bumping Post Manufacture |
29 |
0 |
Adobe PDF file |
17 |
Example of Fixed Bumping Post that Mitigates Impact Forces |
2 |
0 |
Adobe PDF file |
18 |
Uplift Force Calculations |
2 |
0 |
Adobe PDF file |
19 |
"G" Force Calculations |
1 |
0 |
Adobe PDF file |
20 |
Bumping Post Capacity Chart |
1 |
0 |
Adobe PDF file |
21 |
Interview with System Safety Managers |
48 |
0 |
Adobe PDF file |
22 |
System Safety Interview Attachments |
7 |
0 |
Adobe PDF file |
23 |
FRA Safety Advisory 2016-03 |
5 |
0 |
Adobe PDF file |
24 |
Previous NJT Bumping Post Accidents |
4 |
0 |
Adobe PDF file |
25 |
NJT System Safety Program Plan |
82 |
0 |
Adobe PDF file |
26 |
3D Laser Scanning Factual Report |
14 |
23 |
Adobe PDF file |
27 |
3D Laser Scanning Factual Report - Video 1 |
1 |
0 |
Adobe PDF file |
28 |
3D Laser Scanning Factual Report - Video 2 |
1 |
0 |
Adobe PDF file |
29 |
Mechanical Factual Report |
15 |
0 |
Adobe PDF file |
30 |
Attachment 1 - Mechanical Factual Report Locomotive 4214 Class I Air Brake Test Report |
3 |
0 |
Adobe PDF file |
31 |
Attachment 2 - Mechanical Factual Locomotive 4214 Daily Cab Signal Test Report |
2 |
0 |
Adobe PDF file |
32 |
Attachment 3 - Mechanical Factual Cab Car 6036 Class I Air Brake Test Report |
2 |
0 |
Adobe PDF file |
33 |
Attachment 4 - Mechanical Factual Cab Car 6036 Pre-Trip Cab Signal Test Report |
2 |
0 |
Adobe PDF file |
34 |
Attachment 5 - Mechanical Factual Cab Car 6036 Alerter Test Report |
6 |
0 |
Adobe PDF file |
35 |
Attachment 6 - Mechanical Factual Report Cab Car 6036 Master Controller Test Report |
6 |
0 |
Adobe PDF file |
36 |
Attachment 7 - Mechanical Factual Report Cab Car 6036 Translator Test Report |
4 |
0 |
Adobe PDF file |
37 |
Attachment 8 - Mechanical Factual FRA form F6180-49A Locomotive Inspection 4214 |
5 |
0 |
Adobe PDF file |
38 |
Attachment 9 - Mechanical Factual FRA form F6180-49A Locomotive 6036 |
3 |
0 |
Adobe PDF file |
39 |
Attachment 10 - Mechanical Factual EPIC II WI1050-WGS Rev B – System Test Plan |
31 |
0 |
Adobe PDF file |
40 |
Attachment 11 - Mechanical Factual EPIC II WI1050-WGS Rev B – System Test |
10 |
0 |
Adobe PDF file |
41 |
Attachment 12 - Mechanical Factual EPIC II TP1067 Rev H – LIU Test Plan |
9 |
0 |
Adobe PDF file |
42 |
Attachment 13 - Mechanical Factual EPIC II TP1067 Rev H – LIU Test Results |
2 |
0 |
Adobe PDF file |
43 |
Attachment 14 - Mechanical Factual EPIC II Brake Control Unit Event Log Cab Car 6036 |
2 |
0 |
Adobe PDF file |
44 |
Attachment 15 - Mechanical Factual Cab Car 6036 Event Recorder Data Cab Signal Pre-Departure Test |
2 |
0 |
Adobe PDF file |
45 |
Attachment 16 - Mechanical Factual Cab Car 6036 Event Recorder Data – Running Brake Test |
3 |
0 |
Adobe PDF file |
46 |
Cab Car Event Recorder Group Chairman's Factual Report |
16 |
0 |
Adobe PDF file |
47 |
Cab Car Event Recorder - Attachment 1 |
0 |
0 |
Comma-delimited data file |
48 |
Cab Car Event Recorder - Attachment 2 (September 28, 2016 Cab Signal Departure test) |
0 |
0 |
Comma-delimited data file |
49 |
Cab Car Event Recorder - Attachment 3 (September 29, 2016 Class I Brake Test) |
0 |
0 |
Comma-delimited data file |
50 |
NORAC Operating Rules |
154 |
0 |
Adobe PDF file |
51 |
NJT System Timetable No. 8 - Pascack Valley Line |
10 |
0 |
Adobe PDF file |
52 |
NJT Timetable No. 8 - Morristown Line |
21 |
0 |
Adobe PDF file |
53 |
NJT Signal Indications |
2 |
0 |
Adobe PDF file |
54 |
NJT Supplemental Bulletin Order 8-928 |
2 |
0 |
Adobe PDF file |
55 |
NJT Train 1614 Schedule - From Hoboken Division Employee Schedule |
1 |
0 |
Adobe PDF file |
56 |
NJT Rail Operations Summary Bulletin Order No. 8-S924 Eff. 9-24-2016 |
13 |
0 |
Adobe PDF file |
57 |
NJT Rail Operations Restriction Bulletin 9-28-2016 |
2 |
0 |
Adobe PDF file |
58 |
Signal and Train Control Factual Report of Investigation |
9 |
1 |
Adobe PDF file |
59 |
Operations Group Chairman Factual Report |
16 |
0 |
Adobe PDF file |
60 |
Interview of Conductor on Train 1614 |
55 |
0 |
Adobe PDF file |
61 |
1st Interview of Engineer on Train 1614 |
73 |
0 |
Adobe PDF file |
62 |
1st Interview Engineer on Train 1614 Errata Sheet |
1 |
0 |
Adobe PDF file |
63 |
Witness to Hoboken Accident |
18 |
0 |
Adobe PDF file |
64 |
Interview of Brakeman on Train 1614 |
42 |
0 |
Adobe PDF file |
65 |
Interview of NJT Engineer |
44 |
0 |
Adobe PDF file |
66 |
Interview of NJT Police Officer at Hoboken Accident Scene |
21 |
0 |
Adobe PDF file |
67 |
Interview of NJT Train Dispatchers Controlling Movement of Train 1614 |
20 |
0 |
Adobe PDF file |
68 |
Interview of NJT Train Dispatchers Controlling Movement of Train 1614 (2nd) |
19 |
0 |
Adobe PDF file |
69 |
Interview NJT Rider/Concerned Citizen |
25 |
0 |
Adobe PDF file |
70 |
Interview NJT Road Foreman |
13 |
0 |
Adobe PDF file |
71 |
2nd Interview - Engineer on Train 1614 |
32 |
0 |
Adobe PDF file |
72 |
2nd Interview - Engineer on Train 1614 Errata Sheet |
1 |
0 |
Adobe PDF file |
73 |
Interview of NJT Employee/Witness to Accident |
36 |
0 |
Adobe PDF file |
74 |
Locomotive Event Recorder - Group Chairman's Factual Report |
3 |
1 |
Adobe PDF file |
75 |
Locomotive Event Recorder - Attachment 1 |
4 |
0 |
Adobe PDF file |
76 |
Survival Factors Factual Report |
9 |
8 |
Adobe PDF file |
77 |
Personal Electronic Device Factual Report |
3 |
2 |
Adobe PDF file |
78 |
Medical Factual Report |
69 |
0 |
Adobe PDF file |
79 |
Human Performance Group Factual Report |
10 |
0 |
Adobe PDF file |
80 |
Onboard Image Recorder Group Chairman's Factual Report |
16 |
2 |
Adobe PDF file |
81 |
System Safety Factual Report |
36 |
2 |
Adobe PDF file |
82 |
Hoboken Terminal Bumper Block Inspection Track 5 Rehabilitation Recommendation |
30 |
0 |
Adobe PDF file |
83 |
NJT Party Submission |
9 |
0 |
Adobe PDF file |
84 |
Response to Questions About SSPP Dates and Audits |
4 |
0 |
Adobe PDF file |