Docket Contents

Project Summary: Rail Investigation - 57 Docket Items - DCA14FR008

Description: CSX Transportation Unit Crude Oil Train Derailment

Mode: Rail

NTSB Number: DCA14FR008

Date of Accident: 04/30/2014

City: Lynchburg

State / Region: VA

Country: United States

Project Type: Investigation


Docket Information

Creation Date: 08/17/15

Last Modified: 08/18/2015 7:00 AM

Public Release Date & Time: 08/20/2015 2:00 PM


Docket Items: 57

#

Title

Pgs

Photo

Type

1 Mechanical Factual Report 5 3 Adobe PDF file
2 Locomotive Event and On-Board Image Recorders - Specialist's Factual Report 12 8 Adobe PDF file
3 Locomotive Event and On-Board Image Recorders - Attachment 1 Tabular Data (CSV) 0 0 Comma-delimited data file
4 Transcript of Interview - Incident Commander 37 0 Adobe PDF file
5 Track and Engineering Group Factual Report 33 14 Adobe PDF file
6 Track Attachment 1 - Interview of CSX Roadmaster May 2, 2014 36 0 Adobe PDF file
7 Track Attachment 2 - Interview of CSX Equipment Operator on May 2, 2014 25 0 Adobe PDF file
8 Track Attachment 3 - Interview of CSX Engineer of Rail Services 37 0 Adobe PDF file
9 Track Attachment 4- CSX Track Chart of James River Sub. Milepost CAB-146.45 1 0 Adobe PDF file
10 Track Attachment 5- CSX Timetable Huntington East Division Milepost CAB- 146.45 1 0 Adobe PDF file
11 Track Attachment 6- CSX Curve Analysis Data, dated April 03, 2014 1 0 Adobe PDF file
12 Track Attachment 7- DOTX Curve Analysis Data, dated November 04, 2013 1 0 Adobe PDF file
13 Track Attachment 8- Sperry Rail Service Car Movement and Defect Report, dated January 21, 2014 5 0 Adobe PDF file
14 Track Attachment 9- Sperry Rail Service Car Movement and Defect Report, dated February 24, 2014 5 0 Adobe PDF file
15 Track Attachment 10- Sperry Rail Service Car Movement and Defect Report, dated March 31, 2014 5 0 Adobe PDF file
16 Track Attachment 11- Sperry Rail Service Car Movement and Defect Report, dated April 29, 2014 5 0 Adobe PDF file
17 Track Attachment 12- Rail Rebuild Information, Left and Right Rails 2 0 Adobe PDF file
18 Track Attachment 13- CSX Track Inspection Report (report prior to incident) dated April 28, 2014 2 0 Adobe PDF file
19 Track Attachment 14- FRA Track Inspection Report (walking inspection, post accident) dated May 01, 2014 2 0 Adobe PDF file
20 Track Attachment 15- CSX Trtack Inspection Reports from May 31, 2014 to April 28, 2014 122 0 Adobe PDF file
21 Track Attachment 16- CSX Track Disturbance Report for Milepost CAB-146.5, dated January 02, 2014 1 0 Adobe PDF file
22 Track Attachment 17- CSX Maintenance of Way Instruction 502-09- Rail Test Vehicle Operation, October 28, 2013 revision 7 0 Adobe PDF file
23 Track Attachment 18- CSX Maintenance of Way Instruction 501-12 Remedial Action for Rail Defects Identified by Rail Test Vehicles, March 24, 2014 revision 22 0 Adobe PDF file
24 Track Attachment 19- Draft CSX Maintenance of Way Instruction 503-07 Rail Service Failure Reporting, May 02, 2014 revision 9 0 Adobe PDF file
25 Track Attachment 20- CSX Maintenance of Way Instruction 2502 Rail Wear Limits, July 05, 2005 revision 1 0 Adobe PDF file
26 Track Attachment 21- CSX Maintenance of Way Instruction 501-13 Remedial Action for Defects Identified by Rail Test Vehicles, June 27, 2014 revision 17 0 Adobe PDF file
27 Materials Laboratory Factual Report 15-007 15 12 Adobe PDF file
28 Forensic Evidence and Research Documentation Factual Report 6 6 Adobe PDF file
29 Party Submission from BLET 8 0 Adobe PDF file
30 Party Submission from BMWED 9 0 Adobe PDF file
31 Hazardous Materials - Factual Report 40 31 Adobe PDF file
32 Hazardous Materials - ATTACHMENT 1 - CONSIST FOR TRAIN K08227 91 0 Adobe PDF file
33 Hazardous Materials - ATTACHMENT 2 - CSX AEI READOUT AT CAB146 3 0 Adobe PDF file
34 Hazardous Materials - ATTACHMENT 3 - BNSF AEI REPORT 3 0 Adobe PDF file
35 Hazardous Materials - ATTACHMENT 4 - TANK CAR CERTIFICATE OF CONSTRUCTION-TRINITYRAIL 2 0 Adobe PDF file
36 Hazardous Materials - ATTACHMENT 5 - TANK CAR CERTIFICATES OF CONSTRUCTION AND OTHER DOCUMENTS-ARI 460 0 Adobe PDF file
37 Hazardous Materials - ATTACHMENT 6 - PRE-TRANSPORT INSPECTION CHECKLISTS 29 0 Adobe PDF file
38 Hazardous Materials - ATTACHMENT 7 - UMLER REPORT FOR TANK CARS 20 0 Adobe PDF file
39 Hazardous Materials - ATTACHMENT 8 - SAMPLE ANALYSIS 15 0 Adobe PDF file
40 Hazardous Materials - ATTACHMENT 9 - SAMPLE ANALYSIS - DENSITY 1 0 Adobe PDF file
41 Hazardous Materials - ATTACHMENT 10 - WAYBILL 4 0 Adobe PDF file
42 Hazardous Materials - ATTACHMENT 11 - STRAIGHT BILL OF LADING 19 0 Adobe PDF file
43 Hazardous Materials - ATTACHMENT 12 - PETROLEUM CRUDE OIL MATERIAL SAFETY DATA SHEETS 30 0 Adobe PDF file
44 Hazardous Materials - ATTACHMENT 13 - PSCC FAX LIST 1 0 Adobe PDF file
45 Hazardous Materials - ATTACHMENT 14 - PSCC INCIDENT REPORT #6599676 2 0 Adobe PDF file
46 Hazardous Materials - ATTACHMENT 16 - ARI TANK CAR DETAIL SPECIFICATIONS 16 0 Adobe PDF file
47 Hazardous Materials - ATTACHMENT 17 - CSX GPS SURVEY OF TANK CAR LOCATIONS 1 0 Adobe PDF file
48 Hazardous Materials - ATTACHMENT 18 - DAMAGE ASSESSMENT NOTES 44 0 Adobe PDF file
49 Hazardous Materials - ATTACHMENT 19 - EVIDENCE CONTROL FORMS 3 0 Adobe PDF file
50 Hazardous Materials - ATTACHMENT 20 - CTEH AIR MONITORING REPORT - PHASE I 196 0 Adobe PDF file
51 Hazardous Materials - ATTACHMENT 21 - CTEH AIR MONITORING REPORT - PHASE II 238 0 Adobe PDF file
52 Hazardous Materials - ATTACHMENT 22 - CTEH AIR MONITORING REPORT - PHASE III-IV 78 0 Adobe PDF file
53 Hazardous Materials - ATTACHMENT 24 - EXCERPTS FROM ARCADIS ENVIRONMENTAL REPORT 58 0 Adobe PDF file
54 Materials Laboratory Factual Report 15-018 26 19 Adobe PDF file
55 Transcript of Interview - City of Lynchburg Fire Department Battalion Chief 37 0 Adobe PDF file
56 Transcript of Communications - CSX Public Safety Coordination Center (PSCC) and Lynchburg Communications at 1359 5 0 Adobe PDF file
57 Transcript of Communications - CSX Public Safety Coordination Center (PSCC) and Lynchburg Communications at 1623 5 0 Adobe PDF file