# |
Title |
Pgs |
Photo |
Type |
1 |
Preliminary Operations Timeline |
4 |
0 |
Adobe PDF file |
2 |
Operations Early Response Timeline |
2 |
0 |
Adobe PDF file |
3 |
Supporting Information |
3 |
0 |
Adobe PDF file |
4 |
Metallurgical Group--Picture 1 View of the section of pipe in trench containing the rupture |
1 |
0 |
Adobe PDF file |
5 |
Metallurgical Group--Picture 2 Close-up view of the section of pipe in trench containing rupture. Rupture length is approx 6 ft 5 inches and is 4 1/2 inches at the widest location. |
1 |
0 |
Adobe PDF file |
6 |
Metallurgical Group--Picture 3 Section of pipe containing rupture as removed from the trench. Rupture length is approx 6 ft 5 inches and is 4 1/2 inches wide at the widest location. |
1 |
0 |
Adobe PDF file |
7 |
Metallurgical Group--Picture 4 Ruptured pipeline piece installed in crate in Marshall, Michigan. |
1 |
0 |
Adobe PDF file |
8 |
Metallurgical Group--Picture 5 Pipeline pieces in shipping crates on delivery truck in Marshall, Michigan. |
1 |
0 |
Adobe PDF file |
9 |
Metallurgical Group--Picture 6 Crates with pipeline pieces on delivery truck upon arrival at NTSB, Ashburn, Virginia facility. |
1 |
0 |
Adobe PDF file |
10 |
Metallurgical Group--Picture 7 Crates with pipeline pieces unloaded at the NTSB Ashburn, Viriginia facility. |
1 |
0 |
Adobe PDF file |
11 |
Metallurgical Group--Picture 8 Opened crates with pipeline pieces at the NTSB Ashburn, Virginia facility. |
1 |
0 |
Adobe PDF file |
12 |
Metallurgical Group--Picture 9 Pipeline pieces in steel evidence storage container at the NTSB Ashburn, Virginia facility. |
1 |
0 |
Adobe PDF file |
13 |
Metallurgical Group--Picture 10 Uncrated pipeline pieces at the NTSB Ashburn, Virginia facility. |
1 |
0 |
Adobe PDF file |
14 |
Metallurgical Group--Picture 11 Uncrated pipeline pieces at the NTSB Ashburn, Virginia facility. |
1 |
0 |
Adobe PDF file |
15 |
Metallurgical Group--Picture 12 Metallurgical group evaluation of the ruptured pipeline piece at the NTSB Ashburn, Virginia facility. |
1 |
0 |
Adobe PDF file |
16 |
Metallurgical Group--Picture 13 Metallurgical group evaluation of the ruptured pipeline piece at the NTSB Ashburn, Virginia facility. |
1 |
0 |
Adobe PDF file |
17 |
Metallurgical Group-Picture 14 Cleaning the Fracture Faces of the Ruptured Section of pipe (piece B) at the NTSB Ashburn, Virginia Facility. |
1 |
0 |
Adobe PDF file |
18 |
Metallurgical Group- Picture 15 Masked fracture faces and adjacent surfaces during grit blasting at the NTSB Ashburn, Virginia facility. |
1 |
0 |
Adobe PDF file |
19 |
Metallurgical Group- Picture 16 Metallurgical team members inspect the finish from early grit blasting of the ruptured pipe (piece b) at the NTSB Ashburn, Virginia facility. |
1 |
0 |
Adobe PDF file |
20 |
Metallurgical Group- Picture 17 Magnetic Particle Inspection (MPI) testing is performed by a qualified technician on (piece b) after grit blasting of the external surfaces at the NTSB Ashburn, Virginia facility. |
1 |
0 |
Adobe PDF file |
21 |
Metallurgical Group--Picture 18 Sample sections are cut from the ruptured pipe piece at the NTSB Ashburn, Virginia Facility |
1 |
0 |
Adobe PDF file |
22 |
Metallurgical Group-Picture 19 Ruptured pipe piece showing areas where samples have been cut at the NTSB Ashburn, Virginia Facility |
1 |
0 |
Adobe PDF file |
23 |
Metallurgical Group-Picture 20 Sample containing the rupture removed from the ruptured pipe piece at the NTSB Ashburn, Virginia Facility. |
1 |
0 |
Adobe PDF file |
24 |
NTSB Meteorological Factual Report |
7 |
0 |
Adobe PDF file |
25 |
Emergency and Environmental Response Group Chairman's Factual Report |
65 |
9 |
Adobe PDF file |
26 |
Emergency and Environmental Response Attachment 1 - Enbridge Response Plan for Downstream Impacted Areas |
50 |
0 |
Adobe PDF file |
27 |
Emergency and Environmental Response Attachment 2 - Enbridge Pipeline System Description Facility Response Plan Excerpt |
4 |
0 |
Adobe PDF file |
28 |
Emergency and Environmental Response Attachment 3 - Material Safety Data Sheet Heavy Crude Oil Diluent Mix |
8 |
0 |
Adobe PDF file |
29 |
Emergency and Environmental Response Attachment 4 - National Response Center Report 948903 |
4 |
0 |
Adobe PDF file |
30 |
Emergency and Environmental Response Attachment 5 - Enbridge Emergency Response Timeline |
10 |
0 |
Adobe PDF file |
31 |
Human Performance - Factual Report of Group Chairman |
28 |
0 |
Adobe PDF file |
32 |
Transportation Safety Board of Canada Crude Oil Pipeline Rupture Enbridge Pipeline Inc Line 3 Near Glenavan Saskatchewan 15 April 2007 (P07H0014) |
1 |
0 |
Adobe PDF file |
33 |
EPA-Line 6B-May 17, 2012 Submission to the NTSB |
5 |
0 |
Adobe PDF file |
34 |
Emergency and Environmental Response Attachment 6 - EPA Response Timeline |
15 |
0 |
Adobe PDF file |
35 |
Emergency and Environmental Response Attachment 7 - Enbridge Incident Briefing Forms July 26 to August 1, 2010 |
36 |
0 |
Adobe PDF file |
36 |
Emergency and Environmental Response Attachment 8 - Enbridge Resource Deployment Lists July 27 to July 31, 2010 |
36 |
0 |
Adobe PDF file |
37 |
Materials Lab - Study 12-046 |
6 |
0 |
Adobe PDF file |
38 |
Materials Lab - Factual Report 11-055 |
116 |
0 |
Adobe PDF file |
39 |
Emergency and Environmental Response Attachment 9 - EPA Pollution Reports 1 Through 5 |
32 |
0 |
Adobe PDF file |
40 |
Emergency and Environmental Response Attachment 10 - EPA Situation Report 124 |
13 |
0 |
Adobe PDF file |
41 |
Emergency and Environmental Response Attachment 11 - Enbridge Source Area Response Plan |
208 |
0 |
Adobe PDF file |
42 |
Emergency and Environmental Response Attachment 12 - Enbridge Oil Spill Recovery and Containment Plan |
17 |
0 |
Adobe PDF file |
43 |
Emergency and Environmental Response Attachment 13 - Region 5 ACP/RCP Federal On-scene Coordinator Responsibilites |
4 |
0 |
Adobe PDF file |
44 |
Emergency and Environmental Response Attachment 14 - EPA Responses to NTSB Questions, October 29, 2010 |
9 |
0 |
Adobe PDF file |
45 |
Emergency and Environmental Response Attachment 15 - Interview of USCG District Response Advisory Team Supervisor |
57 |
0 |
Adobe PDF file |
46 |
Emergency and Environmental Response Attachment 16 - Michigan Department of Community Health Situation Report |
15 |
0 |
Adobe PDF file |
47 |
Emergency and Environmental Response Attachment 17 - Michigan Department of Natural Resources and Environment Situation Report |
33 |
0 |
Adobe PDF file |
48 |
Emergency and Environmental Response Attachment 18 - Michigan Department of Natural Resources and Environment Notice to Enbridge, September 13, 2010 |
3 |
0 |
Adobe PDF file |
49 |
Emergency and Environmental Response Attachment 19 - Michigan Department of Natural Resources and Environment Administrative Order, November 1, 2010 |
19 |
0 |
Adobe PDF file |
50 |
Emergency and Environmental Response Attachment 20 - Interview of Michigan Department of Natural Resources and Environment Conservation Officer |
24 |
0 |
Adobe PDF file |
51 |
Emergency and Environmental Response Attachment 21 - Interview of Michigan Department of Natural Resources and Environment District Supervisor |
35 |
0 |
Adobe PDF file |
52 |
Emergency and Environmental Response Attachment 22 - Calhoun County Health Department August 18, 2010 Update |
6 |
0 |
Adobe PDF file |
53 |
Emergency and Environmental Response Attachment 23 - Kalamazoo County Health Department August 10, 2010 Update |
2 |
0 |
Adobe PDF file |
54 |
Emergency and Environmental Response Attachment 24 - Interview of Enbridge Chicago Region General Manager |
19 |
0 |
Adobe PDF file |
55 |
Emergency and Environmental Response Attachment 25 - Interview of Chicago Region Engineering Supervisor |
23 |
0 |
Adobe PDF file |
56 |
Emergency and Environmental Response Attachment 26 - Interview of Enbridge Manager of Pipeline Services |
74 |
0 |
Adobe PDF file |
57 |
Emergency and Environmental Response Attachment 27 - Interviews of Enbridge Bay City PLM Supervisor |
103 |
0 |
Adobe PDF file |
58 |
Emergency and Environmental Response Attachment 28 - Interviews of Enbridge Marshall PLM Supervisor |
74 |
0 |
Adobe PDF file |
59 |
Emergency and Environmental Response Attachment 29 - Interviews of Enbridge Marshall PLM Crossing Coordinator |
53 |
0 |
Adobe PDF file |
60 |
Emergency and Environmental Response Attachment 30 - Enbridge Supplemental Pipeline 6B Release Volume Calculation |
2 |
0 |
Adobe PDF file |
61 |
Emergency and Environmental Response Attachment 31 - Enbridge Response Resource List |
3 |
0 |
Adobe PDF file |
62 |
Emergency and Environmental Response Attachment 32 - Contractors Onsite July 26 through July 28, 2010 |
3 |
0 |
Adobe PDF file |
63 |
Emergency and Environmental Response Attachment 33 - Enbridge Incident Briefing Notes July 26 Through July 28, 2010 |
30 |
0 |
Adobe PDF file |
64 |
Emergency and Environmental Response Attachment 34 - EPA Start Contractor Air Monitoring Results |
2 |
0 |
Adobe PDF file |
65 |
Emergency and Environmental Response Attachment 35 - Enbridge Air Monitoring Records July 27 to July 29, 2010 |
7 |
0 |
Adobe PDF file |
66 |
Emergency and Environmental Response Attachment 36 - Calhoun County Health Department Water Advisory, July 29, 2010 |
2 |
0 |
Adobe PDF file |
67 |
Emergency and Environmental Response Attachment 37 - Calhoun County Health Department Water Ban, August 1, 2010 |
2 |
0 |
Adobe PDF file |
68 |
Emergency and Environmental Response Attachment 38 - EPA Work Plan Modification Directive, October 6, 2011 |
7 |
0 |
Adobe PDF file |
69 |
Emergency and Environmental Response Attachment 39 - Recommended Evacuation Zone Map |
2 |
0 |
Adobe PDF file |
70 |
Emergency and Environmental Response Attachment 40 - U.S. Fish and Wildlife Service Wildlife Rescue Activities |
4 |
0 |
Adobe PDF file |
71 |
Emergency and Environmental Response Attachment 41 - NOAA Natural Resources Damage Assessment Description |
2 |
0 |
Adobe PDF file |
72 |
Emergency and Environmental Response Attachment 42 - Enbridge Environmental Remediation Costs |
2 |
0 |
Adobe PDF file |
73 |
Emergency and Environmental Response Attachment 43 - Region 5 Oil and Hazardous Substances Integrated Contingency Plan |
292 |
0 |
Adobe PDF file |
74 |
Emergency and Environmental Response Attachment 44 - Excerpts of Enbridge Chicago Region Emergency Response Plan |
95 |
0 |
Adobe PDF file |
75 |
Emergency and Environmental Response Attachment 45 - Interview of PHMSA Environmental Planning Officer |
54 |
0 |
Adobe PDF file |
76 |
Emergency and Environmental Response Attachment 46 - PHMSA Review of Enbridge Facility Response Plan |
16 |
0 |
Adobe PDF file |
77 |
Emergency and Environmental Response Attachment 47 - PHMSA Approval of Enbridge Facility Response Plan |
4 |
0 |
Adobe PDF file |
78 |
Emergency and Environmental Response Attachment 48 - Draft Volpe Center Report on Office of Pipeline Safety Business Process Review |
13 |
0 |
Adobe PDF file |
79 |
Emergency and Environmental Response Attachment 49 - PHMSA Advisory on Updating Faclity Response Plans |
7 |
0 |
Adobe PDF file |
80 |
Emergency and Environmental Response Attachment 50 - Enbridge Response to PHMSA Advistory Bulletin, July 21, 2010 |
4 |
0 |
Adobe PDF file |
81 |
Emergency and Environmental Response Attachment 51 - PHMSA Participation in PREP Exercises |
3 |
0 |
Adobe PDF file |
82 |
Emergency and Environmental Response Attachment 52 - Excerpts of Enbridge Emergency Response Book 7, Response Methods for Rivers |
4 |
0 |
Adobe PDF file |
83 |
Emergency and Environmental Response Attachment 53 - USGS River Stage Data for Kalamazoo River at Marshall, Michigan |
2 |
0 |
Adobe PDF file |
84 |
Emergency and Environmental Response Attachment 54 - Kalamazoo River Flow Velocity Measurements |
2 |
0 |
Adobe PDF file |
85 |
Emergency and Environmental Response Attachment 55 - NOAA Oil Spill Trajectory Analysis |
3 |
0 |
Adobe PDF file |
86 |
Emergency and Environmental Response Attachment 56 - Computer Aided Dispatch Reports |
6 |
0 |
Adobe PDF file |
87 |
Emergency and Environmental Response Attachment 57 - Transcript of 911 Calls |
12 |
0 |
Adobe PDF file |
88 |
Emergency and Environmental Response Attachment 58 - Transcript of Radio Communications |
36 |
0 |
Adobe PDF file |
89 |
Emergency and Environmental Response Attachment 59 - Interview of Marshall Township Fire Department Captain |
81 |
0 |
Adobe PDF file |
90 |
Emergency and Environmental Response Attachment 60 - Interview of Marshall Fire Department Lieutenant |
55 |
0 |
Adobe PDF file |
91 |
Emergency and Environmental Response Attachment 61 - Interview of Calhoun County Consolidated Dispatch Authority Director |
33 |
0 |
Adobe PDF file |
92 |
Emergency and Environmental Response Attachment 62 - Michigan Gas Utilities Field Investigation Report |
2 |
0 |
Adobe PDF file |
93 |
Emergency and Environmental Response Attachment 63 - Interview of Michigan Gas Utilities Employee |
28 |
0 |
Adobe PDF file |
94 |
Emergency and Environmental Response Attachment 64 - Title 49 Code of Federal Regulations 195.440 |
2 |
0 |
Adobe PDF file |
95 |
Emergency and Environmental Response Attachment 65 - Enbridge Public Awareness Program Plan |
33 |
0 |
Adobe PDF file |
96 |
Emergency and Environmental Response Attachment 66 - Enbridge Public Awareness Program Field Guidance Document |
13 |
0 |
Adobe PDF file |
97 |
Emergency and Environmental Response Attachment 67 - Enbridge Public Awareness Brochure Mailings |
2 |
0 |
Adobe PDF file |
98 |
Emergency and Environmental Response Attachment 68 - Public Awareness Mailing Brochure for Affected Public Example |
11 |
0 |
Adobe PDF file |
99 |
Emergency and Environmental Response Attachment 69 - Public Awareness Mailing Brochure for Emergency and Local Public Officals |
7 |
0 |
Adobe PDF file |
100 |
Emergency and Environmental Response Attachment 70 - Safety Awareness Training Program Sessions Held in 2010 |
3 |
0 |
Adobe PDF file |
101 |
Emergency and Environmental Response Attachment 71 - Safety Awareness Training Program Organizations Invited |
5 |
0 |
Adobe PDF file |
102 |
Emergency and Environmental Response Attachment 72 - Excerpts from the 2010 Michigan Pipeline Emergency Response Planning Information Manual |
3 |
0 |
Adobe PDF file |
103 |
Emergency and Environmental Response Attachment 73 - Cover Letter for the 2010 Michigan Pipeline Emergency Response Planning Information Manual Mailing |
2 |
0 |
Adobe PDF file |
104 |
Emergency and Environmental Response Attachment 74 - Enbridge Public Awareness Program Form 11.1 and Review |
5 |
0 |
Adobe PDF file |
105 |
Emergency and Environmental Response Attachment 75 - Enbridge 2010 Public Awareness Mailing List for Local Officials |
2 |
0 |
Adobe PDF file |
106 |
Emergency and Environmental Response Attachment 76 - Enbridge Accident Report to PHMSA, February 22, 2011 Update |
15 |
0 |
Adobe PDF file |
107 |
Emergency and Environmental Response Attachment 77 - ATSDR Benzene Facts |
3 |
0 |
Adobe PDF file |
108 |
Emergency and Environmental Response Attachment 78 - Enbridge Line 6B Incident Conceptual Site Model, July 8, 2011 |
52 |
0 |
Adobe PDF file |
109 |
Emergency and Environmental Response Attachment 79 - Michigan Department of Community Health Report on the Accute Health Effects of hte Enbridge Oil Spill, November 2010 |
25 |
0 |
Adobe PDF file |
110 |
Emergency and Environmental Response Attachment 80 - Calhoun County Health Department Update, December 22, 2011 |
6 |
0 |
Adobe PDF file |
111 |
Emergency and Environmental Response Attachment 81 - Telephone Records for Enbridge Supervisor, Regional Engineering |
3 |
0 |
Adobe PDF file |
112 |
State of MI Aerial View of Talmadge Creek at 16 Mile Drive, July 27, 2010 |
1 |
0 |
Adobe PDF file |
113 |
State of MI Aerial View of Talmadge Creek Near Pipeline Rupture Site, July 28, 2010 |
1 |
0 |
Adobe PDF file |
114 |
State of MI Aerial View of Oil Boom Deployment Kalamazoo River at I-94, July 28, 2010 |
1 |
0 |
Adobe PDF file |
115 |
State of MI Aerial View of Oil Boom Deployment Kalamazoo River at I-94, July 28, 2010 |
1 |
0 |
Adobe PDF file |
116 |
State of MI Aerial View of Oil Boom Deployment in Kalamazoo River Between I-94 and Wattles Road, July 28, 2010 |
1 |
0 |
Adobe PDF file |
117 |
State of MI Aerial View of Confluence of Talmadge Creek and Kalamazoo River, July 30, 2010 |
1 |
0 |
Adobe PDF file |
118 |
Underflow Dams Constructed on Talmadge Creek, July 30, 2010, State of MI Photo |
1 |
0 |
Adobe PDF file |
119 |
Oil Skimming in Talmadge Creek July 30, 2010, State of MI Photo |
1 |
0 |
Adobe PDF file |
120 |
Installation of Oil Boom Upstream of Division Drive Culvert, August 3, 2010, State of MI Photo |
1 |
0 |
Adobe PDF file |
121 |
Boom Deployment at Talmadge Creek and 15 1/2 Mile Drive, July 28, 2010, Enbridge Photo |
1 |
0 |
Adobe PDF file |
122 |
Crews Vacuum Oil from Talmadge Creek at 15 1/2 Mile Drive, July 28, 2010, Enbridge Photo |
1 |
0 |
Adobe PDF file |
123 |
Oil Drum Skimmer Deployed in Talmadge Creek, July 28, 2010, Enbridge Photo |
1 |
0 |
Adobe PDF file |
124 |
Air Monitoring Crews on Talmadge Creek, July 28, 2010, Enbridge Photo |
1 |
0 |
Adobe PDF file |
125 |
Aerial View of Kalamazoo River Upstream of Ceresco Dam, August 1, 2010, EPA Photo |
1 |
0 |
Adobe PDF file |
126 |
Division Drive Culvert, October 26, 2010, NTSB Photo |
1 |
0 |
Adobe PDF file |
127 |
N. Main Street Bridge over the Kalamazoo River at Ceresco, Michigan, October 26, 2010, NTSB Photo |
1 |
0 |
Adobe PDF file |
128 |
Marshall PLM Boom Trailer Contents, October 26, 2010, NTSB Photo |
1 |
0 |
Adobe PDF file |
129 |
Marshall PLM Oil Spill Response Trailer, October 26, 2010, NTSB Photo |
1 |
0 |
Adobe PDF file |
130 |
Enbridge_NTSB Party Submission_2 |
39 |
0 |
Adobe PDF file |
131 |
Enbridge Party Submission-05-22-2012-Attachment Detection and Characterization of Coincident Cracking and Corrosion Utilizing Ultrasonic Shear Wave Inline Inspection Technology |
39 |
0 |
Adobe PDF file |
132 |
Emergency and Environmental Response - Addendum to Group Chairman's Factual Report |
6 |
0 |
Adobe PDF file |
133 |
Emergency and Environmental Response Addendum Attachment 1 - EPA Situation Report Number 144, May 9, 2012 |
15 |
0 |
Adobe PDF file |
134 |
Emergency and Environmental Response Addendum Attachment 2 - Enbridge Explanation Crude Oil Release vs. Recovery Figures |
2 |
0 |
Adobe PDF file |
135 |
Emergency and Environmental Response Addendum Attachment 3 - Enbridge Public Awareness Program Postaccident Actions |
4 |
0 |
Adobe PDF file |
136 |
Emergency and Environmental Response Addendum Attachment 4 - EPA Comments to Group Factual Report, May 17, 2012 |
2 |
0 |
Adobe PDF file |
137 |
Enbridge Energy Line 6B Marshall Michigan Pipeline Accident Control Room and SCADA Operation Group Chairman Factual Report |
51 |
0 |
Adobe PDF file |
138 |
CONTROL ROOM AND SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) GROUP CHAIRMAN FACTUAL REPORT ERRATA #1 |
2 |
0 |
Adobe PDF file |
139 |
Control Room and Supervisory Control and Data Acquisition (SCADA) Operation Group Chairman Factual Report - Errata #2 |
1 |
0 |
Adobe PDF file |
140 |
Control Room and SCADA Operation Attachment 1 Figure 1 - Control Center Layout on 2010 |
1 |
0 |
JPEG image |
141 |
Control Room and SCADA Operation Attachment 1 Figure 1 - Control Center Layout on 2010 (Revised 05-18-2012) |
1 |
0 |
Adobe PDF file |
142 |
Control Room and SCADA Operation Attachment 5 - Enbridge SCADA Data Log Report. |
26 |
0 |
Adobe PDF file |
143 |
IR208_Control Center - How many leaks have been discovered through the leak detection system. |
1 |
0 |
Adobe PDF file |
144 |
Attachment 10 - Enbridge Control Center Recorded Simulated Demo (Transcripts) - Source - NTSB |
255 |
0 |
Adobe PDF file |
145 |
Control Room and SCADA Operation Attachment 11-Suspected Column Separation |
1 |
0 |
Adobe PDF file |
146 |
Control Room and SCADA Operation Attachment 12 - SCADA Control Center Emergency Porocedure-Abnormal Operating Condition Requirements |
2 |
0 |
Adobe PDF file |
147 |
Control Room and SCADA Operation Attachment 13 - Summary of MBS and Column Separation Alarms at Marshall. |
1 |
0 |
Adobe PDF file |
148 |
Control Room and SCADA Operation Attachment 14-Approved Suspected Column Separation Procedure |
1 |
0 |
Adobe PDF file |
149 |
Control Room and SCADA Operation Attachment 15 - Unapproved Suspected Column Separation Procedures. |
2 |
0 |
Adobe PDF file |
150 |
Control Room and SCADA Operation Attachment 17 - Emergency Notification Procedures. |
2 |
0 |
Adobe PDF file |
151 |
Control Room and SCADA Operation Attachment 18 MBS Leak Alarm - Temporary |
1 |
0 |
Adobe PDF file |
152 |
Control Room and SCADA Operation Attachment 19 - MBS Leak Alarm - Valid Alarm |
1 |
0 |
Adobe PDF file |
153 |
Control Room and SCADA Operation Attachment 30 - Suspect Leak - Pipeline - From SCADA Data |
1 |
0 |
Adobe PDF file |
154 |
Control Room and SCADA Operation Attachment 20 - Elevation Changes |
3 |
0 |
Adobe PDF file |
155 |
Control Room and SCADA Operation Attachment 24 - MBS Alarms and Column Separation. |
2 |
0 |
Adobe PDF file |
156 |
Control Room and SCADA Operation Attachment 25 - Suspected Leak - Pipeline - From Commodity Movement Tracking (CMT). |
1 |
0 |
Adobe PDF file |
157 |
Control Room and SCADA Operation Attachment 26 - Marshall Column Separation Rate. |
1 |
0 |
Adobe PDF file |
158 |
Control Room and SCADA Operation Attachment 29 - Marshall Station PLC Pump Shutdown |
1 |
0 |
Adobe PDF file |
159 |
Control Room and SCADA Operation Attachment 1 Figure: 1d - Control Center Layout on 2010 |
1 |
0 |
Adobe PDF file |
160 |
Control Room and SCADA Operation - Figure 2 Simulated Training Console; Operation SCADA Screens Displaying Simulated Line 6A & 6B on Feb. 1, 2012 |
1 |
0 |
Adobe PDF file |
161 |
Control Room and SCADA Operation - Figure 3a - Main Menu Panel on Feb. 1, 2012 2012, Source:Enbridge (NTSB IR 351) |
1 |
0 |
Adobe PDF file |
162 |
Control Room and SCADA Operation - Figure 3b - Line Control Panel on February 1, 2012 Source: Enbridge (NTSB:IR 351) |
1 |
0 |
Adobe PDF file |
163 |
Control Room and SCADA Operation - Figure 4 - Simulated Marshall Station with Pump Unit-3 Running on Feb. 1, 2012 Sources; Enbridge Energy (NTSB:IR 351) |
1 |
0 |
Adobe PDF file |
164 |
Control Room and SCADA Operation - Figure 5: Simulated Line 6B Stockbridge Tank Farm (Terminal Station) Display on Feb. 1, 2012 |
1 |
0 |
Adobe PDF file |
165 |
Control Room and SCADA Operation - Figure 6: Line 6B Shutdown MBS Display on Feb. 1, 2012 Source: Enbridge Energy (NTSB: 351). |
1 |
0 |
Adobe PDF file |
166 |
Control Room and SCADA Operation - Figure 7: Simulated Line 6B Pipeline Display Leak on Feb. 1, 2012 Source: Enbridge Energy (NTSB: IR 351). |
1 |
0 |
Adobe PDF file |
167 |
Control Room and SCADA Operation - Figure 8: Simulated Unacknowledged Alarm Panel on Feb. 1, 2012 Source: Enbridge Energy (NTSB IR: 351). |
1 |
0 |
Adobe PDF file |
168 |
Control Room and SCADA Operation - Figure 9: Simulated Line 6B Valve Display From Griffith to West Sarnia Feb. 1, 2012 Source: Enbridge Energy (NTSB: IR-351). |
1 |
0 |
Adobe PDF file |
169 |
Control Room and SCADA Operation - Figure 10: Simulated Historical SCADA Data Display For Console on February 1, 2012 Source: Energy Energy (NTSB:IR 351). |
1 |
0 |
Adobe PDF file |
170 |
Control Room and SCADA Operation - Figure 11: Shows Griffith to marshall 5-Minutes Alarm Imbalance Source: Enbridge NTSB-PHMSA IR -1 |
1 |
0 |
Adobe PDF file |
171 |
Control Room and SCADA Operation - Figure 12; Shows Griffith to Marshall 20 Minutes Alarm Imbalance Source: Enbridge NTSB-PHMSA IR 1 |
1 |
0 |
Adobe PDF file |
172 |
Control Room and SCADA Operation - Figure13: Shows Griffith to Marshall 2-Hour Alarm Imbalance Source:Enbridge -NTSB-PHMSA IR 1 |
1 |
0 |
Adobe PDF file |
173 |
Control Room and SCADA Operation - Figure 14 - MBS Line 6 Flow Display Simulated - NTSB-PHMSA 358 Source: Enbridge No. 170255 |
1 |
0 |
Adobe PDF file |
174 |
Control Room and SCADA Operation - Figure 15 - Line 6B Offline Simulated Leak - NTSB-PHMSA, Source; Enbridge No. 162536 |
1 |
0 |
Adobe PDF file |
175 |
Control Room and SCADA Operation - Figure 16: Line 6B Offline Simulated Column Separation - NTSB-PHMSA IR 358, Source: Enbridge No. 152231 |
1 |
0 |
Adobe PDF file |
176 |
Control Room and SCADA Operation - Figure 17: Line 6B Display Simulated Leak - NTSB-PHMSA IR 358, Source: Enbridge No. 162530. |
1 |
0 |
Adobe PDF file |
177 |
Control Room and SCADA Operation - Figure 18: MBS Line 6B Density, Pressure and Liquid Fraction Simulated - NTSB - PHMSA IR 358, Source: Enbridge No. 165839. |
1 |
0 |
Adobe PDF file |
178 |
Control Room and SCADA Operation - Figure 19: MBS Diagnostic Flow Summary - NTSB-PHMSA IR 358, Source: Enbridge No. 172945 |
1 |
0 |
Adobe PDF file |
179 |
Control Room and SCADA Operation - Figure 20: Line 6B MBS Temperature, Pressure, and Density Trends - NTSB-PHMSA No. 173935. |
1 |
0 |
Adobe PDF file |
180 |
Control Room and SCADA Operation - Figure 21: Rio - SCADA Trends Simulated - NTSB -PHMSA IR 358, Source: Enbridge No. 123119. |
1 |
0 |
Adobe PDF file |
181 |
Control Room and SCADA Operation - Figure 22: MBS Marshall Pressures - NTSB-PHMSA IR 358, Source: Enbridge No. 170950 |
1 |
0 |
Adobe PDF file |
182 |
Control Room and SCADA Operation - Figure 1b: Enbridge Energy Pipeline System Map from Edmonton, Canada to Montreal, Canada, Source: Enbridge Energy. |
1 |
0 |
Adobe PDF file |
183 |
Control Room and SCADA Operation - Figure 1c: Enbridge Energy Line 6B System Map from Griffith to Sarnia, Source: Enbridge Energy. |
1 |
0 |
Adobe PDF file |
184 |
Control Room and SCADA Operations - Figure 1a: Enbridge Energy Line 6B Active Pump Stations on July 25 & 26, 2010, Source: Enbridge Energy. |
1 |
0 |
Adobe PDF file |
185 |
Control Room and SCADA Operations - Attachment: 21 MBS System - 1, NTSB/PHMSA IR 1 |
1 |
0 |
Adobe PDF file |
186 |
Control Room and SCADA Operations - Attachment: 33 FACMAN Generation on July 25 & 26, 2010 |
1 |
0 |
Adobe PDF file |
187 |
Control Room and SCADA Operations - Attachment: 32 Source of 10-minute rules |
90 |
0 |
Adobe PDF file |
188 |
Control Room and SCADA Operations - Attachment: 34 Line 6B Volume Balance Sections. |
3 |
0 |
Adobe PDF file |
189 |
Control Room and SCADA Operations - Attachment 35: MBS Leak Alarm - Analysis by MBS Support |
1 |
0 |
Adobe PDF file |
190 |
Control Room and SCADA Operations - Attachment 36: MBS Support Response Flow Chart |
17 |
0 |
Adobe PDF file |
191 |
Control Room and SCADA Operations - Attachment:37 List of Abnormal Operating Conditions. |
3 |
0 |
Adobe PDF file |
192 |
Control Room and SCADA Operations - Attachment 38: FACMAN created on July 25 & 26, 2010 |
1 |
0 |
Adobe PDF file |
193 |
Control Room and SCADA Operations - Attachment 39: Valve 632.89 Communication Fail without FACMAN |
3 |
0 |
Adobe PDF file |
194 |
Control Room and SCADA Operations - Figure 2a: Typical Similar Operators Console on July 25 & 26, 2010 at the control center, Source: Enbridge |
1 |
0 |
Adobe PDF file |
195 |
Control Room and SCADA Operations - Attachment 40: Enbridge Post Accident Actions |
15 |
0 |
Adobe PDF file |
196 |
Line 6B Console SCADA Alarms and Pipeline Operator Comments_07-25-10 |
48 |
0 |
Adobe PDF file |
197 |
Line 6B Console SCADA Alarms and Pipeline Operator Comments_07-26-10 |
14 |
0 |
Adobe PDF file |
198 |
Pipeline SCADA Study - Mainline Volumes |
4 |
0 |
Adobe PDF file |
199 |
Pipeline SCADA Study_Mainline Volumes_Attachment A |
482 |
0 |
Adobe PDF file |
200 |
Pipeline SCADA Study_Mainline Volumes_Attachment B |
483 |
0 |
Adobe PDF file |
201 |
Pipeline SCADA Study_Mainline Volumes_Attachment C |
500 |
0 |
Adobe PDF file |
202 |
Pipeline SCADA Study_Mainline Volumes_Attachment D |
2 |
0 |
Adobe PDF file |
203 |
Pipeline SCADA Study_Mainline Volumes_Attachment E |
2 |
0 |
Adobe PDF file |
204 |
Pipeline SCADA Study_Mainline Volumes_Attachment F |
2 |
0 |
Adobe PDF file |
205 |
Integrity Management Group Chairman's Factual Report |
29 |
0 |
Adobe PDF file |
206 |
IMP Attachment I - Table I: Fitness for service calculations performed by Enbridge at NTSB's request using Corrosion, crack and tool tolerance data |
1 |
0 |
Adobe PDF file |
207 |
IMP Attachment - Table II: 2004 to 2009 Metal Loss with cracking_PII e mail_5_14_2012 |
1 |
0 |
Adobe PDF file |
208 |
IMP: Attachment – II - Table III: ENBRIDGE LINE 6B IN-LINE INSPECTION INFORMATION |
1 |
0 |
Adobe PDF file |
209 |
IMP Attachment III - Table IV: ENBRIDGE LINE 6B USWM 1999 IN-LINE INSPECTION INFORMATION |
2 |
0 |
Adobe PDF file |
210 |
IMP Attachment III -TableV: Consolidated ILI listing Provided by PII |
1 |
0 |
Adobe PDF file |
211 |
IMP Attachment - IV Diagram of Feature Locations (Figures 4-7) |
4 |
0 |
Adobe PDF file |
212 |
IMP IR 401-365 PI ILI history and schedule report |
3 |
0 |
Adobe PDF file |
213 |
Line 6B Pipeline Information History Group Factual Report |
14 |
0 |
Adobe PDF file |
214 |
IMP IR 195 Response_NTSB-PHMSA - Polyken Wrap Coating |
2 |
0 |
Adobe PDF file |
215 |
IMP IR 68 Enbridge Line 6B ILI Inspection Information |
3 |
0 |
Adobe PDF file |
216 |
IMP IR 23.1 ILI Run Corrolated anomaly data |
7 |
0 |
Adobe PDF file |
217 |
IMP IR 31.1 Pipeline Description |
2 |
0 |
Adobe PDF file |
218 |
IMP 367 Pipeline History with Polyethelene |
5 |
0 |
Adobe PDF file |
219 |
IMP IR 373 Line 6B Shutdown History |
40 |
0 |
Adobe PDF file |
220 |
IMP IR 49 Pressure Restriction History |
94 |
0 |
Adobe PDF file |
221 |
IMP IR 24-5 Cathodic Protection Records |
21 |
0 |
Adobe PDF file |
222 |
IMP IR 33 Line 6B Service History for last 2 years |
244 |
0 |
Adobe PDF file |
223 |
IMP IR 1.13 Line 6B ongoing work requests |
264 |
0 |
Adobe PDF file |
224 |
IMP IR 20 Close interval survey Line 6B 30 Inche |
163 |
0 |
Adobe PDF file |
225 |
IMP IR 24.8 Line 6B leak history over 5 years |
1 |
0 |
Adobe PDF file |
226 |
IMP IR 43 Pipeline field survey |
2 |
0 |
Adobe PDF file |
227 |
IMP IR 9.1 Welding procedure specification |
2 |
0 |
Adobe PDF file |
228 |
IMP IR 81 Moody inspection reports |
52 |
0 |
Adobe PDF file |
229 |
IMP IR 82 Line 6B construction pressure test records |
12 |
0 |
Adobe PDF file |
230 |
IMP IR 80 Bill of lading and transportation of Italsider pipe |
13 |
0 |
Adobe PDF file |
231 |
IMP IR 107 Sectionalizing valves used at shutdown |
1 |
0 |
Adobe PDF file |
232 |
IMP IR 368 Depth of Cover |
2 |
0 |
Adobe PDF file |
233 |
IMP IR 106 Line 6B Elev Profile GW 217550 to 217900.pdf |
1 |
0 |
Adobe PDF file |
234 |
IMP IR 24-9 Leak History.pdf |
66 |
0 |
Adobe PDF file |
235 |
IMP PII Documents |
49 |
0 |
Adobe PDF file |
236 |
IMP - PII POD-POI ILI tools capabilities 04-13-2012 |
17 |
0 |
Adobe PDF file |
237 |
IMP - PII - POD example for USCD tool specification |
2 |
0 |
Adobe PDF file |
238 |
IMP IR 24-21 NTSB Geo Technical Reports |
14 |
0 |
Adobe PDF file |
239 |
IMP Attachment V - Reference-1, IR 376:PDF_2004 HCA Management Plan_Published July 2005 pages 11-18, 20-24, 160-65, 169, 172-81, 188-208, 218-20, 239-41 |
57 |
0 |
Adobe PDF file |
240 |
IMP Attachment V, Reference 2 - IR 72 Operations Risk Management Manual,150-Evolution Overview, 2008 version. Pages 3-11;17-20;25-29;39;43-48. |
21 |
0 |
Adobe PDF file |
241 |
IMP Attachment V, Reference 3 - IR 401 The working relationship and roles between pipeline integrity and the risk model. |
3 |
0 |
Adobe PDF file |
242 |
IMP Attachment V, Reference 4 - IR 403: Overall responsibilities of risk management and pipeline integrity management groups. |
3 |
0 |
Adobe PDF file |
243 |
IMP Attachment V - IR 376: Reference-5, Crack Managment Plan version 1.1 Approved on May 11, 2006 Pages 3-10 |
8 |
0 |
Adobe PDF file |
244 |
IMP Attachment V- Reference-6, IR 376: Pipeline integrity excavation program (version2) - Approved on March 18, 2005. Pages 3-7, 10, 20-22 |
9 |
0 |
Adobe PDF file |
245 |
IMP Attachment V, Reference 8 - IR 24.6: Corrosion inhibitors. Page 1-2; 14-15 |
25 |
0 |
Adobe PDF file |
246 |
IMP Attachment V, Reference 9 - IR 195: Procedures to apply Polyken coating. |
3 |
0 |
Adobe PDF file |
247 |
IMP Attachment V, Reference 10 - IR 275: CC05B1Cathodic protection. Page 5-9; |
5 |
0 |
Adobe PDF file |
248 |
IMP Attachment V, Reference 10 - IR 275: CC05B1Cathodic protection. Page 5-9; |
2 |
0 |
Adobe PDF file |
249 |
IMP Attachment V, Reference 11 - IR 275: CC8F00 Coatings. Pages 4-11 |
8 |
0 |
Adobe PDF file |
250 |
IMP Attachment V, Reference 12 - IR 24.5: Pipe to soil readings. Pages 1-8; 13-20 |
17 |
0 |
Adobe PDF file |
251 |
IMP Attachment V, Reference - 13 IR 376: Corrosion Growth Rate Analysis Guideline Document, Undated, Pages: All. |
14 |
0 |
Adobe PDF file |
252 |
IMP Attachment V, Reference 14 - IR 71: Corrosion Growth Rate Plan (version 2.1). Pages: All. |
8 |
0 |
Adobe PDF file |
253 |
IMP Attachment V, Reference 15, IR 67: SCC Management Plan. (version 1.0.) Pages: All |
9 |
0 |
Adobe PDF file |
254 |
IMP Attachment V, Reference 18 - IR 275: CCG Glossary (2008). Pages: All |
17 |
0 |
Adobe PDF file |
255 |
IMP Attachment V, Reference 19 - IR 296: FlawCheck Manual. Pages: 3-9 |
8 |
0 |
Adobe PDF file |
256 |
IMP Attachment V, Reference 20 - IR 279: PI-37-Fitness-for-Purpose Calculations for Crack ILI Features. Pages: 1 |
2 |
0 |
Adobe PDF file |
257 |
IMP Attachment V, Reference 22 - IR 68: In-Line Inspection History. Page 1. |
3 |
0 |
Adobe PDF file |
258 |
IMP Attachment V - Reference 23-IR 376: In-Line Inspection Program Version 1.0 Pages 5-6 |
2 |
0 |
Adobe PDF file |
259 |
IMP Attachment V - reference-21, IR 376: Automated Pressure Cycling Analysis - Appendix 2, Crack Management Program Page 1 |
1 |
0 |
Adobe PDF file |
260 |
IMP Attachment V, Reference 25 - IR 24.6 Corrosion Inhibitor Summary Document. Page 1. |
2 |
0 |
Adobe PDF file |
261 |
IMP Attachment V, Reference 26 - IR 326 NEB Inspection of Dec. 19, 2008 NEB letter to Enbridge. Pages: 1-3. |
4 |
0 |
Adobe PDF file |
262 |
IMP Attachment V, Reference 27 - IR 326 NEB Inspection- 1 Aug., 2008 NEB letter to Enbridge Pages: 1-2 |
3 |
0 |
Adobe PDF file |
263 |
IMP Attachment V, Reference 29 - IR 333 PHMSA’s May 15, 2002 letter to Enbridge Pages: 1-3. |
4 |
0 |
Adobe PDF file |
264 |
IMP Attachment V, Reference 30 - IR 333 PHMSA’s Executive Summary. Page 1. |
1 |
0 |
Adobe PDF file |
265 |
IMP Attachment V, Reference 31 - IR 333 PHMSA’s IM Summary Inspection Report Final. Pages: All |
13 |
0 |
Adobe PDF file |
266 |
IMP Attachment V, Reference 32 - IR 9 Regulatory CPF Tracking. Pages:1-6. |
7 |
0 |
Adobe PDF file |
267 |
IMP Attachment V, Reference 33 - IR 357: NTSB verbal request of 2/26/2012 regarding significant crack length. Page 1. |
2 |
0 |
Adobe PDF file |
268 |
Enbridge Edmonton Control Center Phone Transcripts Vol_1 |
99 |
0 |
Adobe PDF file |
269 |
Enbridge Edmonton Control Center Phone Transcripts Vol_2 |
377 |
0 |
Adobe PDF file |
270 |
Enbridge Edmonton Control Center Phone Transcripts Vol_3 |
397 |
0 |
Adobe PDF file |
271 |
Interview of Anderson-Maintenance Supervisor-10-27-10 |
27 |
0 |
Adobe PDF file |
272 |
Interview of Ashcroft-Shift Lead-07-30-10 |
76 |
0 |
Adobe PDF file |
273 |
Interview of Austin-Firefighter Marshall Township-07-30-10 |
23 |
0 |
Adobe PDF file |
274 |
Interview of Baumgartner-Director Control Center Operations-02-02-12 |
48 |
0 |
Adobe PDF file |
275 |
Interview of Bonney-Firefighter Marshall Township-08-01-10 |
80 |
0 |
Adobe PDF file |
276 |
Interview of Bott-Material Engineer-12-08-11 |
159 |
0 |
Adobe PDF file |
277 |
Interview of Buck-Technical Supervisor-07-29-10 |
37 |
0 |
Adobe PDF file |
278 |
Interview of Butler-Supervisor Accident Investigation PHMSA-11-17-11 |
50 |
0 |
Adobe PDF file |
279 |
Interview of Buys-Vice President Customer Service-11-16-11 |
52 |
0 |
Adobe PDF file |
280 |
Interview of Carter-Electrical Technican-07-29-10 |
53 |
0 |
Adobe PDF file |
281 |
Interview of Casavant-Control Center Operator-02-02-12 |
36 |
0 |
Adobe PDF file |
282 |
Interview of Cavers-Control Center Operator-02-02-12 |
19 |
0 |
Adobe PDF file |
283 |
Interview of Christ-Regional Health Safety Coordinator-07-30-10 |
26 |
0 |
Adobe PDF file |
284 |
Interview of Chubb-Control Center Operator-07-29-10 |
175 |
0 |
Adobe PDF file |
285 |
Interview of Chubb-Control Center Operator-12-15-10 |
169 |
0 |
Adobe PDF file |
286 |
Interview of Chubb-Control Center Operator-01-31-12-FINAL |
47 |
0 |
Adobe PDF file |
287 |
Interview of DeWitt-Cathodic Specialist-07-29-10 |
12 |
0 |
Adobe PDF file |
288 |
Interview of Derhami_Control Center Operator_11-17-11 |
105 |
0 |
Adobe PDF file |
289 |
Interview of Donald-Shift Supervisor-12-15-10 |
134 |
0 |
Adobe PDF file |
290 |
Interview of Donald-Shift Supervisor-01-31-12 |
39 |
0 |
Adobe PDF file |
291 |
Interview of Ewing-Shift Lead-07-28-10 |
105 |
0 |
Adobe PDF file |
292 |
Interview of Ewing-Shift Lead-12-15-10 |
128 |
0 |
Adobe PDF file |
293 |
Interview of Farquhar-Engineer-07-30-10 |
87 |
0 |
Adobe PDF file |
294 |
Interview of Farquhar-Engineer-12-16-10 |
180 |
0 |
Adobe PDF file |
295 |
Interview of Fish-State Conservation Officer-07-29-10 |
23 |
0 |
Adobe PDF file |
296 |
Interview of Folkema-Control Center Engineer-07-30-10 |
78 |
0 |
Adobe PDF file |
297 |
Interviw of Fridel-General Manager Chicago Region-07-30-10 |
18 |
0 |
Adobe PDF file |
298 |
Interview of Garth-Global Analysis Manager for Ultrasonics-12-09-11 |
158 |
0 |
Adobe PDF file |
299 |
Interview of Goeson-Supervisor Control Center Operations-07-30-2010 |
58 |
0 |
Adobe PDF file |
300 |
Interview of Goeson-Supervisor Control Center Operations-12-14-10 |
157 |
0 |
Adobe PDF file |
301 |
Interview of Goeson-Supervisor Control Center Operations-11-15-11 |
76 |
0 |
Adobe PDF file |
302 |
Interview of Goeson-Supervisor Control Center Operations-02-02-12-FINAL |
84 |
0 |
Adobe PDF file |
303 |
Interview of Gold-Clemmer-Control Center Operators for Enbridge and Dow Chemical Canada-02-01-12 |
45 |
0 |
Adobe PDF file |
304 |
Interview of Harris-Corrosion Control Coordinator-12-06-11 |
39 |
0 |
Adobe PDF file |
305 |
Interview of Harron-Supervisor Operational Optimizational Group-11-16-11 |
88 |
0 |
Adobe PDF file |
306 |
Interview of Horan-Control Center Operator-02-02-12 |
42 |
0 |
Adobe PDF file |
307 |
Interview of Ironside Presentation-Integrity Management Group-12-05-11 |
54 |
0 |
Adobe PDF file |
308 |
Interview of Irving-Director Sysrem Intergrity and Compliance-12-05-11 |
80 |
0 |
Adobe PDF file |
309 |
Interview of Johnston-Supervisor of Training and Compliance for Control Center Operations-12-17-10 |
120 |
0 |
Adobe PDF file |
310 |
Interview of Johnston-Supervisor of Training and Compliance for Control Center Operations-11-15-11 |
99 |
0 |
Adobe PDF file |
311 |
Interview of Kavajecz-Manager of Pipeline Compliance-11-17-11 |
54 |
0 |
Adobe PDF file |
312 |
Interview of Keane-Supervisor of Crack Compliance-12-07-11 |
285 |
0 |
Adobe PDF file |
313 |
Interview of Kitchen and Walgren-Control Systems Engineer and Senior Control Systems Technican |
39 |
0 |
Adobe PDF file |
314 |
Interview of Knudson-MBS Analyst 3-07-29-10 |
128 |
0 |
Adobe PDF file |
315 |
Interview of Knudson-MBS Analyst 3-12-16-10 |
144 |
0 |
Adobe PDF file |
316 |
Interview of Kolbuck-Regional Engineering Supervisor-07-30-10 |
22 |
0 |
Adobe PDF file |
317 |
Interview of Krissa-Team Lead Analysis Group-12-06-11 |
38 |
0 |
Adobe PDF file |
318 |
Interview of Lloyd-Team Lead for Operations Training-07-29-10 |
15 |
0 |
Adobe PDF file |
319 |
Interview of Lynch-MBS Analydt 2-07-29-10 |
63 |
0 |
Adobe PDF file |
320 |
Interview of MacDonald-Control Center Operator-07-28-10 |
105 |
0 |
Adobe PDF file |
321 |
Interview of MacDonald-Control Center Operator-12-14-10 |
129 |
0 |
Adobe PDF file |
322 |
Interview of MacDonald-Control Center Operator-02-01-12 |
32 |
0 |
Adobe PDF file |
323 |
Interview of Mattrice-Control Center Operator-02-01-12 |
22 |
0 |
Adobe PDF file |
324 |
Interview of McEachern-Director of Safety Culture-11-14-11 |
64 |
0 |
Adobe PDF file |
325 |
Interview of Miller-Control Center Operator-01-31-12 |
48 |
0 |
Adobe PDF file |
326 |
Interview of Palmer-Region Engineer-10-27-10 |
28 |
0 |
Adobe PDF file |
327 |
Interview of Parsons-Control Center Shift Lead-07-29-10 |
106 |
0 |
Adobe PDF file |
328 |
Interview of Parsons-Control Center Shift Lead-12-17-10 |
150 |
0 |
Adobe PDF file |
329 |
Interview of Parsons-Control Center Shift Lead-01-31-12-FINAL |
41 |
0 |
Adobe PDF file |
330 |
Interview of Philpenko-Manager of Leak Detention-11-16-11 |
59 |
0 |
Adobe PDF file |
331 |
Interview of Pilgrim-Start-Up Supervisor of Imperial Oil of Canada-02-01-12 |
52 |
0 |
Adobe PDF file |
332 |
Interview of Pilgrim-Start-Up Supervisor Imperial Oil of Canada-02-01-12 |
52 |
0 |
Adobe PDF file |
333 |
Interview of Poulin-Control Center Operator-07-29-10 |
79 |
0 |
Adobe PDF file |
334 |
Interview of Rahn-Pipeliner-07-29-10 |
18 |
0 |
Adobe PDF file |
335 |
Interview of Rahn-Pipeliner-10-26-10 |
32 |
0 |
Adobe PDF file |
336 |
Interview of Reber-Lieutenant of State Police of Michigan-08-01-10 |
26 |
0 |
Adobe PDF file |
337 |
Interview of Reinbolt-Control Center Supervisor-07-30-10 |
67 |
0 |
Adobe PDF file |
338 |
Interview of Reinbolt-Control Center Supervisor-12-17-10 |
87 |
0 |
Adobe PDF file |
339 |
Interview of Reschny-Supervisor of SCADA Operations-12-16-10 |
113 |
0 |
Adobe PDF file |
340 |
Interview of Scott-Control Center Operator Trainee-07-28-10 |
117 |
0 |
Adobe PDF file |
341 |
Interview of Scott-Control Center Operator Trainee-12-14-10 |
114 |
0 |
Adobe PDF file |
342 |
Interview of Scott-Control Center Operator Trainee-02-01-12-FINAL |
40 |
0 |
Adobe PDF file |
343 |
Interview of Seibel-Control Center Operator-01-31-12 |
26 |
0 |
Adobe PDF file |
344 |
Interview of Senf-Technical Aide for Global Data Analysis and Ultrasonics-01-11-12 |
242 |
0 |
Adobe PDF file |
345 |
Interview of Senf-Technical Aide for Global Data Analysis and Ultrasonics |
171 |
0 |
Adobe PDF file |
346 |
Interview of Sleaver-Pipeline Supervisor-10-27-10 |
29 |
0 |
Adobe PDF file |
347 |
Interview of Soprovich-Control Center Shift Lead-07-30-10 |
85 |
0 |
Adobe PDF file |
348 |
Interview of Sporns-Supervisor of Corrosion Program Group-12-06-11 |
216 |
0 |
Adobe PDF file |
349 |
Interview of Sporns Presentation-Supervisor of Corrosion Program Group-12-06-11 |
47 |
0 |
Adobe PDF file |
350 |
Interview of Steede-Supervisor of Enviornmental Operations-07-30-10 |
48 |
0 |
Adobe PDF file |
351 |
Interview of Travis-Marshall City Fire Department-08-01-10 |
54 |
0 |
Adobe PDF file |
352 |
Interview of Sutton-Crack Management Program-12-08-11 |
57 |
0 |
Adobe PDF file |
353 |
Interview of Treachur-Gas Line Fitter-07-30-10 |
18 |
0 |
Adobe PDF file |
354 |
Interview of Vader-Control Center Operator-02-01-12 |
26 |
0 |
Adobe PDF file |
355 |
Interview of Vanderwolf-Pipeline Operations Group-11-17-11 |
55 |
0 |
Adobe PDF file |
356 |
Interview of Vaters-Control Center Operator-02-01-12 |
29 |
0 |
Adobe PDF file |
357 |
Interview of Weir-Yanping-ORM Engineer-12-08-11 |
182 |
0 |
Adobe PDF file |
358 |
Interview of Westlund-Pipeline Integrity Specialist for GE Pii-01-12-12 |
61 |
0 |
Adobe PDF file |
359 |
Interview of Whittaker-Electrical Technician-07-29-10 |
32 |
0 |
Adobe PDF file |
360 |
Interview of Whitaker-Electrical Technician-08-04-10 |
24 |
0 |
Adobe PDF file |
361 |
Interview of Zimmel-Control Center Shift Lead-07-29-10 |
90 |
0 |
Adobe PDF file |
362 |
Interview of Zimmel-Control Center Shift Lead-12-17-10 |
117 |
0 |
Adobe PDF file |
363 |
Interview of Zimmel-Control Center Shift Lead-01-31-12-FINAL |
49 |
0 |
Adobe PDF file |
364 |
Interview of Zimmerman-Program Manager for System Integrity-07-29-10 |
47 |
0 |
Adobe PDF file |
365 |
Interview of Zimmerman-Program Manager for System Integrity-12-05-11 |
73 |
0 |
Adobe PDF file |
366 |
Interview of Zupan-Senior Vice President of Operations-11-17-11 |
65 |
0 |
Adobe PDF file |
367 |
IMP Attachment V Reference 16, IR 376: 2005 SCC Management Program Pages 2-7 |
6 |
0 |
Adobe PDF file |
368 |
IMP Attachment V Reference 17,IR 376: US NDE Scope of Work. Pages: All |
12 |
0 |
Adobe PDF file |
369 |
IMP Attachment V IR 376 - Reference 7, IMP framework (version 1, June, 21, 2002) - Pages 3-8, 12-13, 17-22, 27-28.pdf |
16 |
0 |
Adobe PDF file |
370 |
IMP Attachment V IR 333 - Reference 28, PHMSA December 21, 2004 Letter to Enbridge. Pages 1-7.pdf |
7 |
0 |
Adobe PDF file |
371 |
Marshall, MI pipeline accident final report |
164 |
0 |
Adobe PDF file |
372 |
Safety Recommendation transmittal letter P-12-001 and P-12-002 |
1 |
0 |
Adobe PDF file |
373 |
Safety Recommendation transmittal letter for P-12-003 through P-12-010 |
1 |
0 |
Adobe PDF file |
374 |
Safety Recommendation transmittal letter for P-12-011 through P-12-016 |
1 |
0 |
Adobe PDF file |
375 |
Safety Recommendation transmittal letter for P-12-017 |
1 |
0 |
Adobe PDF file |
376 |
Safety Recommendation transmittal letter for P-12-018 |
1 |
0 |
Adobe PDF file |
377 |
Safety Recommendation transmittal letter for P-12-019 |
1 |
0 |
Adobe PDF file |
378 |
Enbridge Signed Party Form |
1 |
0 |
Adobe PDF file |
379 |
Corrected final report |
1 |
0 |
Adobe PDF file |