Title |
Pgs |
Photo |
Type |
1 |
BOARD MEETING PRESENTATION-OPENING STATEMENT |
19 |
0 |
Text (PDF) |
2 |
BOARD MEETING PRESENTATION-WATER TREATMENT PLANT EXCAVATION |
21 |
0 |
Text (PDF) |
3 |
BOARD MEETING PRESENTATION-IN-LINE INSPECTIONS |
11 |
0 |
Text (PDF) |
4 |
BOARD MEETING PRESENTATION-BAYVIEW PRODUCTS TERMINAL AND RELIEF VALVE TESTING |
27 |
0 |
Text (PDF) |
5 |
BOARD MEETING PRESENTATION-SCADA SYSTEM |
11 |
0 |
Text (PDF) |
6 |
BOARD MEETING PRESENTATION-CONTROL CENTER |
12 |
0 |
Text (PDF) |
7 |
OLYMPIC PIPE LINE COMPANY SUBMITTAL |
10 |
0 |
Text (PDF) |
8 |
IMCO GENERAL CONSTRUCTION SUBMITTAL |
7 |
0 |
Text (PDF) |
9 |
OFFICE OF PIPELINE SAFETY SUBMITTAL |
2 |
0 |
Text (PDF) |
10 |
ATTACHMENT TO OFFICE OF PIPELINE SAFETY SUBMITTAL-SUPPLEMENTAL REPORT BY NOEL DUCKWORTH |
8 |
0 |
Text (PDF) |
11 |
WASHINGTON DEPARTMENT OF ECOLOGY SUBMITTAL |
1 |
0 |
Text (PDF) |
12 |
MATERIALS LABORATORY FACTUAL REPORT 00-157 |
52 |
0 |
Text/Image (PDF or TIFF) |
13 |
MATERIALS LABORATORY FACTUAL REPORT NO 00-157-APPENDIX A-ANALYSIS OF A PIPE AND GREASE-LIKE SAMPLE |
11 |
0 |
Text/Image (PDF or TIFF) |
14 |
METALLURGY FACTUAL REPORT 01-022 |
3 |
0 |
Text (PDF) |
15 |
METALLURGY FACTUAL REPORT NO 01-022-ATTACHMENT-ANALYSIS OF SAMPLES REMOVED FROM A DAMAGED PIPELINE NISTIR 6737 AP |
66 |
0 |
Text (PDF) |
16 |
SURVIVAL FACTORS GROUP CHAIRMAN'S FACTUAL REPORT |
8 |
0 |
Text (PDF) |
17 |
ATTACHMENT 1 TO THE SURVIVAL FACTORS GROUP CHAIRMAN'S FACTUAL REPORT_CITY OF BELLINGHAM NEWS RELEASE ON 6-16-99 |
6 |
0 |
Text/Image (PDF or TIFF) |
18 |
ATTACHMENT 2 TO THE SURVIVAL FACTORS GROUP CHAIRMAN'S FACTUAL REPORT_CITY OF BELLINGHAM POLICE DEPT COMPLAINT REPORT |
8 |
0 |
Text/Image (PDF or TIFF) |
19 |
HUMAN PERFORMANCE SPECIALIST REPORT |
6 |
0 |
Text (PDF) |
20 |
INTERNAL INSPECTION FACTUAL REPORT |
5 |
0 |
Text/Image (PDF or TIFF) |
21 |
APPENDIX 1 TO INTERNAL INSPECTION FACTUAL REPORT TUBOSCOPE REPORT-NOVEMBER 18 1991 |
71 |
0 |
Text/Image (PDF or TIFF) |
22 |
APPENDIX 2 TO INTERNAL INSPECTION FACTUAL REPORT-LINALOG PLUS BULLETIN |
2 |
0 |
Text/Image (PDF or TIFF) |
23 |
APPENDIX 3 TO INTERNAL INSPECTION FACTUAL REPORT-OPS CONSULTANT REPORT |
53 |
0 |
Text/Image (PDF or TIFF) |
24 |
APPENDIX 4 TO INTERNAL INSPECTION FACTUAL REPORT-TUBOSCOPE REPORT-MARCH 18 1996 WITH FLAW LIST FEATURES AND DEFECT |
18 |
0 |
Text/Image (PDF or TIFF) |
25 |
APPENDIX 5 TO INTERNAL INSPECTION FACTUAL REPORT-TUBOSCOPE FLAW LIST DATED 5-23-96 |
9 |
0 |
Text/Image (PDF or TIFF) |
26 |
APPENDIX 6 TO INTERNAL INSPECTION FACTUAL REPORT-WASHINGTON DEPARTMENT OF ECOLOGY'S ADMINISTRATIVE ORDER DE 96CJP-N269 |
5 |
0 |
Text/Image (PDF or TIFF) |
27 |
APPENDIX 7 TO INTERNAL INSPECTION FACTUAL REPORT-OLYMPIC REPONSES TO WDOE ORDER |
34 |
0 |
Text/Image (PDF or TIFF) |
28 |
APPENDIX 8 TO INTERNAL INSPECTION FACTUAL REPORT-OLYMPIC CORROSION DEFECT FORMULA CALCULATIONS |
2 |
0 |
Text/Image (PDF or TIFF) |
29 |
APPENDIX 9 TO INTERNAL INSPECTION FACTUAL REPORT-CALIPER TOOL INSPECTION REPORT |
25 |
0 |
Text/Image (PDF or TIFF) |
30 |
APPENDIX 10 TO INTERNAL INSPECTION FACTUAL REPORT-OLYMPIC DIG SHEET DATED 7-97 |
2 |
0 |
Text/Image (PDF or TIFF) |
31 |
APPENDIX 11 TO INTERNAL INSPECTION FACTUAL REPORT-TESTIMONY OF JIM CARGO 10-05-00 |
99 |
0 |
Text/Image (PDF or TIFF) |
32 |
APPENDIX 12 TO INTERNAL INSPECTION FACTUAL REPORT-DENTS AND GOUGES EVALUATION ARTICLE PROVIDED BY OLYMPIC |
7 |
0 |
Text/Image (PDF or TIFF) |
33 |
APPENDIX 13 TO INTERNAL INSPECTION FACTUAL REPORT-OLYMPIC DIAGRAMS OF CHANGES |
8 |
0 |
Text/Image (PDF or TIFF) |
34 |
APPENDIX 14 TO INTERNAL INSPECTION FACTUAL REPORT-OLYMPIC FIELD EXCAVATION INSPECTION SUMMARY |
3 |
0 |
Text/Image (PDF or TIFF) |
35 |
CORRESPONDENCE_JANUARY 11 2001 LETTER FROM BP PIPELINES RELEASING CLAIMS OF CONFIDENTIALITY ON DOCUMENTS INCLUDED IN T |
1 |
0 |
Text/Image (PDF or TIFF) |
36 |
INTERNAL INSPECTION FACTUAL REPORT ADDENDA 1 |
3 |
0 |
Text (PDF) |
37 |
APPENDIX A TO THE INTERNAL INSPECTION FACTUAL REPORT ADDENDA 1 ADDITIONAL OLYMPIC PIPELINE COMPANY PROCEDURES |
17 |
0 |
Text/Image (PDF or TIFF) |
38 |
APPENDIX B TO THE INTERNAL INSPECTION FACTUAL REPORT ADDENDA 1 RICHARD KLASEN INTERVIEW TRANSCRIPT |
205 |
0 |
Text (PDF) |
39 |
IN-LINE INSPECTION FACTUAL ADD-2 |
1 |
0 |
Text (PDF) |
40 |
TESTING OF PRESSURE RELIEF VALVE-RV1919- |
76 |
0 |
Text/Image (PDF or TIFF) |
41 |
APPENDIX A HANDOUTS FROM SEPTEMBER 18 2000 |
5 |
0 |
Text/Image (PDF or TIFF) |
42 |
APPENDIX B READIOGRAPHER CERTIFICATION |
5 |
0 |
Text/Image (PDF or TIFF) |
43 |
APPENDIX C CALIBRATION PRACTICES CALIBRATION CERTIFICATES HYDRAULIC OIL SPECIFICATIONS AND TEST SET-UP INFORMATION |
29 |
0 |
Text/Image (PDF or TIFF) |
44 |
APPENDIX D SEPTEMBER 19 2000 TEST RESULTS ACCIDENT PILOT VALVE |
1 |
0 |
Text/Image (PDF or TIFF) |
45 |
RUN-1_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
46 |
RUN-1_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
47 |
RUN-1_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
48 |
RUN-1_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
49 |
RUN-1_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
50 |
RUN-1_PLOT A2 |
1 |
0 |
Standalone Photo (JPG) |
51 |
RUN-1_PLOT B2 |
1 |
0 |
Standalone Photo (JPG) |
52 |
RUN-1_PLOT C2 |
1 |
0 |
Standalone Photo (JPG) |
53 |
RUN-1_PLOT D2 |
1 |
0 |
Standalone Photo (JPG) |
54 |
RUN-1_PLOT E2 |
1 |
0 |
Standalone Photo (JPG) |
55 |
RUN-2_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
56 |
RUN-2_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
57 |
RUN-2_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
58 |
RUN-2_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
59 |
RUN-2_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
60 |
RUN-3_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
61 |
RUN-3_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
62 |
RUN-3_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
63 |
RUN-3_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
64 |
RUN-3_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
65 |
RUN-4_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
66 |
RUN-4_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
67 |
RUN-4_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
68 |
RUN-4_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
69 |
RUN-4_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
70 |
RUN-5_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
71 |
RUN-5_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
72 |
RUN-5_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
73 |
RUN-5_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
74 |
RUN-5_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
75 |
RUN-6_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
76 |
RUN-6_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
77 |
RUN-6_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
78 |
RUN-6_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
79 |
RUN-6_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
80 |
APPENDIX E SEPTEMBER 20 2000 TEST RESULTS ACCIDENT PILOT VALVE |
1 |
0 |
Text/Image (PDF or TIFF) |
81 |
RUN-1_PLOT A-82 |
1 |
0 |
Standalone Photo (JPG) |
82 |
RUN-1_PLOT B-83 |
1 |
0 |
Standalone Photo (JPG) |
83 |
RUN-1_PLOT C-84 |
1 |
0 |
Standalone Photo (JPG) |
84 |
RUN-1_PLOT D-85 |
1 |
0 |
Standalone Photo (JPG) |
85 |
RUN-1_PLOT E-86 |
1 |
0 |
Standalone Photo (JPG) |
86 |
RUN-2_PLOT A-87 |
1 |
0 |
Standalone Photo (JPG) |
87 |
RUN-2_PLOT B-88 |
1 |
0 |
Standalone Photo (JPG) |
88 |
RUN-2_PLOT C-89 |
1 |
0 |
Standalone Photo (JPG) |
89 |
RUN-2_PLOT D-90 |
1 |
0 |
Standalone Photo (JPG) |
90 |
RUN-2_PLOT E-91 |
1 |
0 |
Standalone Photo (JPG) |
91 |
RUN-3_PLOT A-92 |
1 |
0 |
Standalone Photo (JPG) |
92 |
RUN-3_PLOT B-93 |
1 |
0 |
Standalone Photo (JPG) |
93 |
RUN-3_PLOT C-94 |
1 |
0 |
Standalone Photo (JPG) |
94 |
RUN-3_PLOT D-95 |
1 |
0 |
Standalone Photo (JPG) |
95 |
RUN-3_PLOT E-96 |
1 |
0 |
Standalone Photo (JPG) |
96 |
APPENDIX F AE RESULTS |
20 |
0 |
Text/Image (PDF or TIFF) |
97 |
APPENDIX G SEPTEMBER 20 2000 TEST RESULTS HP EXEMPLAR PILOT VALVE |
1 |
0 |
Text/Image (PDF or TIFF) |
98 |
RUNS-1 AND 2_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
99 |
RUNS-1_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
100 |
RUNS-1_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
101 |
RUNS-1_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
102 |
RUNS-1_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
103 |
RUNS-1_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
104 |
RUNS-2_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
105 |
RUNS-2_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
106 |
RUNS-2_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
107 |
RUNS-2_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
108 |
RUNS-2_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
109 |
RUNS-3 THRU 9_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
110 |
RUNS-3 THRU 9_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
111 |
RUNS-3 THRU 9_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
112 |
RUNS-3 THRU 9_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
113 |
RUNS-3 THRU 9_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
114 |
APPENDIX H SEPTEMBER 21 2000 TEST RESULTS HP EXEMPLAR PILOT VALVE |
1 |
0 |
Text/Image (PDF or TIFF) |
115 |
RUNS-1 THRU 11_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
116 |
RUNS-1 THRU 11_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
117 |
RUNS-1 THRU 11_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
118 |
RUNS-1 THRU 11_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
119 |
RUNS-1 THRU 11_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
120 |
RUNS-1 THRU 3_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
121 |
RUNS-1 THRU 3_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
122 |
RUNS-1 THRU 3_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
123 |
RUNS-1 THRU 3_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
124 |
RUNS-1 THRU 3_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
125 |
RUNS-4 THRU 7_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
126 |
RUNS-4 THRU 7_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
127 |
RUNS-4 THRU 7_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
128 |
RUNS-4 THRU 7_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
129 |
RUNS-4 THRU 7_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
130 |
RUNS-8 THRU 11_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
131 |
RUNS-8 THRU 11_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
132 |
RUNS-8 THRU 11_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
133 |
RUNS-8 THRU 11_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
134 |
RUNS-8 THRU 11_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
135 |
APPENDIX I SEPTEMBER 21 2000 TEST RESULTS LP EXEMPLAR PILOT VALVE |
1 |
0 |
Text/Image (PDF or TIFF) |
136 |
RUNS-1 THRU 6_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
137 |
RUNS-1 THRU 2_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
138 |
RUNS-1 THRU 2_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
139 |
RUNS-1 THRU 2_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
140 |
RUNS-1 THRU 2_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
141 |
RUNS-1 THRU 2_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
142 |
RUNS-3 THRU 4_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
143 |
RUNS-3 THRU 4_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
144 |
RUNS-3 THRU 4_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
145 |
RUNS-3 THRU 4_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
146 |
RUNS-5_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
147 |
RUNS-5_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
148 |
RUNS-5_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
149 |
RUNS-5_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
150 |
RUNS-5_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
151 |
RUNS-6_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
152 |
RUNS-6_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
153 |
RUNS-6_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
154 |
RUNS-6_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
155 |
RUNS-6_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
156 |
RUNS-7 THRU 14_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
157 |
RUNS-7 THRU 14_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
158 |
RUNS-7 THRU 14_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
159 |
RUNS-7 THRU 14_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
160 |
RUNS-7 THRU 14_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
161 |
RUNS-10 THRU 14_PLOT A |
1 |
0 |
Standalone Photo (JPG) |
162 |
RUNS-10 THRU 14_PLOT B |
1 |
0 |
Standalone Photo (JPG) |
163 |
RUNS-10 THRU 14_PLOT C |
1 |
0 |
Standalone Photo (JPG) |
164 |
RUNS-10 THRU 14_PLOT D |
1 |
0 |
Standalone Photo (JPG) |
165 |
RUNS-10 THRU 14_PLOT E |
1 |
0 |
Standalone Photo (JPG) |
166 |
FIGURE 21 |
1 |
0 |
Standalone Photo (JPG) |
167 |
FIGURE 210 |
1 |
0 |
Standalone Photo (JPG) |
168 |
FIGURE 211 |
1 |
0 |
Standalone Photo (JPG) |
169 |
FIGURE 212 |
1 |
0 |
Standalone Photo (JPG) |
170 |
FIGURE 213 |
1 |
0 |
Standalone Photo (JPG) |
171 |
FIGURE 214 |
1 |
0 |
Standalone Photo (JPG) |
172 |
FIGURE 215 |
1 |
0 |
Standalone Photo (JPG) |
173 |
FIGURE 216 |
1 |
0 |
Standalone Photo (JPG) |
174 |
FIGURE 217 |
1 |
0 |
Standalone Photo (JPG) |
175 |
FIGURE 218 |
1 |
0 |
Standalone Photo (JPG) |
176 |
FIGURE 219 |
1 |
0 |
Standalone Photo (JPG) |
177 |
FIGURE 22 |
1 |
0 |
Standalone Photo (JPG) |
178 |
FIGURE 220 |
1 |
0 |
Standalone Photo (JPG) |
179 |
FIGURE 23 |
1 |
0 |
Standalone Photo (JPG) |
180 |
FIGURE 24 |
1 |
0 |
Standalone Photo (JPG) |
181 |
FIGURE 25 |
1 |
0 |
Standalone Photo (JPG) |
182 |
FIGURE 26 |
1 |
0 |
Standalone Photo (JPG) |
183 |
FIGURE 27 |
1 |
0 |
Standalone Photo (JPG) |
184 |
FIGURE 28 |
1 |
0 |
Standalone Photo (JPG) |
185 |
FIGURE 29 |
1 |
0 |
Standalone Photo (JPG) |
186 |
FIGURE 31 |
1 |
0 |
Standalone Photo (JPG) |
187 |
FIGURE 32 |
1 |
0 |
Standalone Photo (JPG) |
188 |
FIGURE 41 |
1 |
0 |
Standalone Photo (JPG) |
189 |
FIGURE 410 |
1 |
0 |
Standalone Photo (JPG) |
190 |
FIGURE 42 |
1 |
0 |
Standalone Photo (JPG) |
191 |
FIGURE 43 |
1 |
0 |
Standalone Photo (JPG) |
192 |
FIGURE 47 |
1 |
0 |
Standalone Photo (JPG) |
193 |
FIGURE 48 |
1 |
0 |
Standalone Photo (JPG) |
194 |
FIGURE 49 |
1 |
0 |
Standalone Photo (JPG) |
195 |
FIGURE 51 |
1 |
0 |
Standalone Photo (JPG) |
196 |
FIGURE 53 |
1 |
0 |
Standalone Photo (JPG) |
197 |
FIGURE 54 |
1 |
0 |
Standalone Photo (JPG) |
198 |
FIGURE 55 |
1 |
0 |
Standalone Photo (JPG) |
199 |
FIGURE 56 |
1 |
0 |
Standalone Photo (JPG) |
200 |
FIGURE 57 |
1 |
0 |
Standalone Photo (JPG) |
201 |
FIGURE 58 |
1 |
0 |
Standalone Photo (JPG) |
202 |
FIGURE 61 |
1 |
0 |
Standalone Photo (JPG) |
203 |
FIGURE 610 |
1 |
0 |
Standalone Photo (JPG) |
204 |
FIGURE 611 |
1 |
0 |
Standalone Photo (JPG) |
205 |
FIGURE 612 |
1 |
0 |
Standalone Photo (JPG) |
206 |
FIGURE 613 |
1 |
0 |
Standalone Photo (JPG) |
207 |
FIGURE 614 |
1 |
0 |
Standalone Photo (JPG) |
208 |
FIGURE 615 |
1 |
0 |
Standalone Photo (JPG) |
209 |
FIGURE 616 |
1 |
0 |
Standalone Photo (JPG) |
210 |
FIGURE 62 |
1 |
0 |
Standalone Photo (JPG) |
211 |
FIGURE 63 |
1 |
0 |
Standalone Photo (JPG) |
212 |
FIGURE 64 |
1 |
0 |
Standalone Photo (JPG) |
213 |
FIGURE 65 |
1 |
0 |
Standalone Photo (JPG) |
214 |
FIGURE 66 |
1 |
0 |
Standalone Photo (JPG) |
215 |
FIGURE 67 |
1 |
0 |
Standalone Photo (JPG) |
216 |
FIGURE 68 |
1 |
0 |
Standalone Photo (JPG) |
217 |
FIGURE 69 |
1 |
0 |
Standalone Photo (JPG) |
218 |
SCADA COMPUTER SYSTEM STUDY |
29 |
0 |
Text (PDF) |
219 |
APPENDIX 1 TO SCADA COMPUTER STUDY SELECTED TREND GRAPHS |
6 |
0 |
Text (PDF) |
220 |
APPENDIX 2 TO SCADA COMPUTER STUDY VAX VMS SYSYEM LOGS |
60 |
0 |
Text (PDF) |
221 |
APPENDIX 3 SCADA COMPUTER STUDY OLYMPIC BACKUP TAPES LISTINGS |
187 |
0 |
Text (PDF) |
222 |
APPENDIX 4 SCADA COMPUTER STUDY OLYMPIC COMPUTER SYSTEM UPGRADE FINAL STATUS REPORT DATED AUG 6 1999 |
20 |
0 |
Text (PDF) |
223 |
APPENDIX 5 SCADA COMPUTER STUDY OLYMPIC PIPELINE CONTROL METHODOLOGY-SCADA ASSESSMENT DATED JULY 2 1999 |
7 |
0 |
Text (PDF) |
224 |
APPENDIX 6 SCADA COMPUTER STUDY OLYMPIC COMPUTER SYSTEM PRELIMINARY STATUS REPORT DATED JULY 1 1999 |
5 |
0 |
Text (PDF) |
225 |
APPENDIX 7 SCADA COMPUTER STUDY OLY1 COMPUTER CONSOLE PRINTOUT |
16 |
0 |
Text (PDF) |
226 |
APPENDIX 8 SCADA COMPUTER STUDY OLY2 COMPUTER CONSOLE PRINTOUTS |
36 |
0 |
Text (PDF) |
227 |
APPENDIX 9 ERRATA TO SCADA COMPUTER SYSTEM STUDY |
2 |
0 |
Text (PDF) |
228 |
ENVIRONMENTAL RESPONSE FACTUAL REPORT |
9 |
0 |
Text/Image (PDF or TIFF) |
229 |
ATTACHMENT-1 TO ENVIRONMENTAL RESPONSE FACTUAL REPORT_FEDERAL ON-SCENE COORDINATOR'S REPORT FOR THE WHATCOM CREEK-OL |
268 |
0 |
Text/Image (PDF or TIFF) |
230 |
ATTACHMENT-2 TO ENVIRONMENTAL RESPONSE FACTUAL REPORT_ASSESSMENT OF WHATCOM CREEK INCIDENT EMERGENCY RESPONSE ACTIVITI |
99 |
0 |
Text/Image (PDF or TIFF) |
231 |
ATTACHMENT-3 TO ENVIRONMENTAL RESPONSE FACTUAL REPORT_WDOE ECOLOGY SPILL DRILL EVALUATION CHECKLIST_OPL SPILL MANAGEM |
6 |
0 |
Text/Image (PDF or TIFF) |
232 |
ATTACHMENT -4 TO ENVIRONMENTAL RESPONSE FACTUAL REPORT_OPL SEPTEMBER 9 1998 OIL SPILL DRILL EVALUATION REPORT BY ENVI |
56 |
0 |
Text/Image (PDF or TIFF) |
233 |
ATTACHMENT-5 TO ENVIRONMENTAL RESPONSE FACTUAL REPORT_ OPL MAY 7 1997 OIL SPILL RESPONSE EXERCISE REPORT BY MEYERS A |
43 |
0 |
Text/Image (PDF or TIFF) |
234 |
ATTACHMENT-6 TO ENVIRONMENTAL RESPONSE FACTUAL REPORT_ JULY 19 1999 LETTER FROM JE TAYLOR RESEARCH AND SPECIAL PRO |
31 |
0 |
Text/Image (PDF or TIFF) |
235 |
ATTACHMENT-7 TO ENVIRONMENTAL RESPONSE FACTUAL REPORT_ PRESENTATION_A FOCUS ON RESPONSE MANAGEMENT_GASOLINE PIPELI |
15 |
0 |
Text/Image (PDF or TIFF) |
236 |
ATTACHMENT-8 TO ENVIRONMENTAL RESPONSE FACTUAL REPORT_ FEBRUARY 12 2001 LETTER FROM L PILKEY-JARVIS WDOE RE_LESSON |
11 |
0 |
Text/Image (PDF or TIFF) |
237 |
ATTACHMENT-9 TO ENVIRONMENTAL RESPONSE FACTUAL REPORT_STATE OF WASHINGTON DEPARTMENT OF ECOLOGY ADMINISTRATIVE ORDER N |
4 |
0 |
Text/Image (PDF or TIFF) |
238 |
RELIEF VALVE GROUP FACTUAL REPORT |
6 |
0 |
Text (PDF) |
239 |
APPENDIX A TO RELIEF VALVE GROUP FACTUAL REPORT_OLYPMIC PIPELINE SYSTEM MAP AND PIPING INSTRUMENTATION DIAGRAM FOR THE |
3 |
0 |
Text/Image (PDF or TIFF) |
240 |
APPENDIX B TO RELIEF VALVE GROUP FACTUAL REPORT_JACOBS ENGINEERING GROUP CONTINGENCY ANALYSIS DATED JULY 18 1997 |
5 |
0 |
Text/Image (PDF or TIFF) |
241 |
APPENDIX C TO RELIEF VALVE GROUP FACTUAL REPORT_MANUFACTURER'S TECHNICAL BULLETIN AND DESIGN SPECIFICATIONS FOR MODEL 7 |
22 |
0 |
Text/Image (PDF or TIFF) |
242 |
APPENDIX D TO RELIEF VALVE GROUP FACTUAL REPORT_INSTRUMENT SPECIFICATION SHEET FOR RV 1919 DATED 12-17-97 MARKED-0001 |
2 |
0 |
Text/Image (PDF or TIFF) |
243 |
APPENDIX E TO RELIEF VALVE GROUP FACTUAL REPORT_OLYMPIC PIPE LINE PURCHASE ORDER DATED JANUARY 6 1998 INSTRUMENT SPEC |
9 |
0 |
Text/Image (PDF or TIFF) |
244 |
APPENDIX F TO THE RELIEF VALVE GROUP FACTUAL REPORT_FISHER ROSEMOUNT INVOICES AND ACKNOWLEDGEMENTS FOR OLYMPIC PURCHASE |
20 |
0 |
Text (PDF) |
245 |
APPENDIX G TO RELIEF VALVE GROUP FACTUAL REPORT_ATTORNEY LETTER DATED JUNE 4 2001 RE_HANDWRITTEN NOTATIONS ON RV1919 |
6 |
0 |
Text/Image (PDF or TIFF) |
246 |
APPENDIX H TO THE RELIEF VALVE GROUP FACTUAL REPORT_FISHER ROSEMOUNT INVOICES AND ACKNOWLEDGEMENTS FOR OLYMPIC PURCHASE |
9 |
0 |
Text (PDF) |
247 |
RELIEF VALVE GROUP FACTUAL REPORT ADDENDA 1 |
2 |
0 |
Text (PDF) |
248 |
WATER TREATMENT PLANT FACTUAL REPORT |
9 |
0 |
Text (PDF) |
249 |
APPENDIX A TO THE WATER TREATMENT PLANT FACTUAL REPORT SITE PLAN |
1 |
0 |
Text/Image (PDF or TIFF) |
250 |
APPENDIX B TO THE WATER TREATMENT PLANT FACTUAL REPORT DAKIN-YEW TREATMENT PLANT MODIFICATION RECORDS PART A |
40 |
0 |
Text/Image (PDF or TIFF) |
251 |
APPENDIX B TO THE WATER TREATMENT PLANT FACTUAL REPORT DAKIN-YEW TREATMENT PLANT MODIFICATION RECORDS-PART B |
4 |
0 |
Text/Image (PDF or TIFF) |
252 |
APPENDIX C TO THE WATER TREATMENT PLANT FACTUAL REPORT DAKIN-YEW WATER TREATMENT PLANT MODIFICATION PHOTOGRAPHS |
16 |
0 |
Text/Image (PDF or TIFF) |
253 |
APPENDIX D TO THE WATER TREATMENT PLANT FACTUAL REPORT OLYMPIC PIPELINE COMPANY RECORDS OF THE DAKIN-YEW PROJECT |
66 |
0 |
Text/Image (PDF or TIFF) |
254 |
APPENDIX E TO THE WATER TREATMENT PLANT FACTUAL REPORT PHONE LINE REPAIR RECORDS |
15 |
0 |
Text/Image (PDF or TIFF) |
255 |
APPENDIX F TO THE WATER TREATMENT PLANT FACTUAL REPORT KEVIN WITTMER OLYMPIC-INTERVIEW TRANSCRIPT |
79 |
0 |
Text/Image (PDF or TIFF) |
256 |
APPENDIX G TO THE WATER TREATMENT PLANT FACTUAL REPORT KEN ROBERTS OLYMPIC-INTERVIEW TRANSCRIPT |
133 |
0 |
Text/Image (PDF or TIFF) |
257 |
APPENDIX H TO THE WATER TREATMENT PLANT FACTUAL REPORT GEORGE NORDBY BARRETT-INTERVIEW AND DEPOSITION TRANSCRIPTS |
53 |
0 |
Text/Image (PDF or TIFF) |
258 |
APPENDIX I TO THE WATER TREATMENT PLANT FACTUAL REPORT JOHN HATCH BARRETT-INTERVIEW AND DEPOSITION TRANSCRIPTS |
49 |
0 |
Text/Image (PDF or TIFF) |
259 |
APPENDIX J TO THE WATER TREATMENT PLANT FACTUAL REPORT TOM FRANKLIN BARRETT-INTERVIEW AND DEPOSITION TRANSCRIPTS |
296 |
0 |
Text/Image (PDF or TIFF) |
260 |
APPENDIX K TO THE WATER TREATMENT PLANT FACTUAL REPORT FRANK IMHOF IMCO-INTERVIEW TRANSCRIPT |
33 |
0 |
Text/Image (PDF or TIFF) |
261 |
APPENDIX L TO THE WATER TREATMENT PLANT FACTUAL REPORT GREG BURRESS IMCO-INTERVIEW TRANSCRIPT |
86 |
0 |
Text/Image (PDF or TIFF) |
262 |
APPENDIX M TO THE WATER TREATMENT PLANT FACTUAL REPORT CALVIN VANDERPOL IMCO-INTERVIEW NOTES |
2 |
0 |
Text (PDF) |
263 |
APPENDIX N TO THE WATER TREATMENT PLANT FACTUAL REPORT BRITTON LUKES IMCO-DEPOSITION TRANSCRIPT |
87 |
0 |
Text (PDF) |
264 |
APPENDIX O TO THE WATER TREATMENT PLANT FACTUAL REPORT_JOHN MUDER JR IMCO-DEPOSITION TRANSCRIPT |
145 |
0 |
Text (PDF) |
265 |
APPENDIX P TO THE WATER TREATMENT PLANT FACTUAL REPORT_PAUL KRAKENBERG IMCO-DEPOSITION TRANSCRIPT |
78 |
0 |
Text (PDF) |
266 |
APPENDIX Q TO THE WATER TREATMENT PLANT FACTUAL REPORT MARK GRAHAM TRIAD-INTERVIEW AND DEPOSITION TRANSCRIPTS |
80 |
0 |
Text (PDF) |
267 |
APPENDIX R TO THE WATER TREATMENT PLANT FACTUAL REPORT BILL EVANS BELLINGHAM-INTERVIEW TRANSCRIPT |
35 |
0 |
Text/Image (PDF or TIFF) |
268 |
APPENDIX S TO THE WATER TREATMENT PLANT FACTUAL REPORT PHOTO 1 POST-ACCIDENT CRATER WITH WATERLINE VALVE RISERS |
1 |
0 |
Standalone Photo (JPG) |
269 |
APPENDIX S TO THE WATER TREATMENT PLANT FACTUAL REPORT PHOTO 2 BEGINNING EXCAVATION TO RECOVER RUPTURED PIPE |
1 |
0 |
Standalone Photo (JPG) |
270 |
APPENDIX S TO THE WATER TREATMENT PLANT FACTUAL REPORT PHOTO 3 IRREGULAR SHAPED CONCRETE CHUNK FOUND ABOVE RUPTURE |
1 |
0 |
Standalone Photo (JPG) |
271 |
APPENDIX S TO THE WATER TREATMENT PLANT FACTUAL REPORT PHOTO 4 EXPOSING RUPTURE IN RELATION TO WATERLINE TEE AND PVC U |
1 |
0 |
Standalone Photo (JPG) |
272 |
APPENDIX S TO THE WATER TREATMENT PLANT FACTUAL REPORT PHOTO 5 VIEW OF IRREGULAR SHAPED CONCRETE CHUNK |
1 |
0 |
Standalone Photo (JPG) |
273 |
APPENDIX S TO THE WATER TREATMENT PLANT FACTUAL REPORT PHOTO 6 REMOVING RUPTURED PIPE SEGMENT |
1 |
0 |
Standalone Photo (JPG) |
274 |
APPENDIX S TO THE WATER TREATMENT PLANT FACTUAL REPORT PHOTO 7 INTERNAL VIEW OF DAMAGE TO RUPTURED PIPE SEGMENT |
1 |
0 |
Standalone Photo (JPG) |
275 |
APPENDIX S TO THE WATER TREATMENT PLANT FACTUAL REPORT PHOTO 8 REMOVING WATERLINE TEE AND THRUST BLOCK |
1 |
0 |
Standalone Photo (JPG) |
276 |
APPENDIX S TO THE WATER TREATMENT PLANT FACTUAL REPORT PHOTO 9 VIEW OF THRUST BLOCK |
1 |
0 |
Standalone Photo (JPG) |
277 |
APPENDIX S TO THE WATER TREATMENT PLANT FACTUAL REPORT PHOTO 10 EXCAVATING TO REMOVE SECOND PIPE SEGMENT CONTAINING AN |
1 |
0 |
Standalone Photo (JPG) |
278 |
APPENDIX S TO THE WATER TREATMENT PLANT FACTUAL REPORT PHOTO 11 SECOND PIPE SEGMENT WITH VIEW OF CDF FILL THAT SURROUN |
1 |
0 |
Standalone Photo (JPG) |
279 |
APPENDIX S TO THE WATER TREATMENT PLANT FACTUAL REPORT PHOTO 12 REMOVING SECOND PIPE SEGMENT |
1 |
0 |
Standalone Photo (JPG) |
280 |
APPENDIX S TO THE WATER TREATMENT PLANT FACTUAL REPORT PHOTO 13 VIEW OF EXTERNAL DAMAGE TO SECOND PIPE SEGMENT |
1 |
0 |
Standalone Photo (JPG) |
281 |
APPENDIX S TO THE WATER TREATMENT PLANT FACTUAL REPORT PHOTO 14 INTERNAL VIEW OF DAMAGE TO SECOND PIPE SEGMENT |
1 |
0 |
Standalone Photo (JPG) |
282 |
APPENDIX T TO THE WATER TREATMENT PLANT FACTUAL REPORT POST-ACCIDENT SITE SURVEYS PART A |
2 |
0 |
Text/Image (PDF or TIFF) |
283 |
APPENDIX T TO THE WATER TREATMENT PLANT FACTUAL REPORT POST-ACCIDENT SITE SURVEYS PART B |
1 |
0 |
Text/Image (PDF or TIFF) |
284 |
APPENDIX T TO THE WATER TREATMENT PLANT FACTUAL REPORT POST-ACCIDENT SITE SURVEYS PART C PLAN VIEW CAD |
0 |
0 |
[Custom] |
285 |
APPENDIX T TO THE WATER TREATMENT PLANT FACTUAL REPORT POST-ACCIDENT SITE SURVEYS PART C SHEET 2 CAD |
0 |
0 |
[Custom] |
286 |
APPENDIX T TO THE WATER TREATMENT PLANT FACTUAL REPORT POST-ACCIDENT SITE SURVEYS PART C SHEET 3 CAD |
0 |
0 |
[Custom] |
287 |
WATER TREATMENT PLANT FACTUAL REPORT ADDENDA 1 |
2 |
0 |
Text (PDF) |
288 |
APPENDIX A TO THE WATER TREATMENT PLANT FACTUAL REPORT ADDENDA 1 FEBRUARY 1993 POTHOLE LOCATIONS |
3 |
0 |
Text (PDF) |
289 |
APPENDIX B TO THE WATER TREATMENT PLANT FACTUAL REPORT ADDENDA 1 JUNE 1993 POTHOLE LOCATIONS |
4 |
0 |
Text (PDF) |
290 |
APPENDIX C TO THE WATER TREATMENT PLANT FACTUAL REPORT ADDENDA 1 OLYMPIC INSPECTOR'S RECORDS FOR FEBRUARY 1993 POTHOLI |
4 |
0 |
Text (PDF) |
291 |
APPENDIX D TO THE WATER TREATMENT PLANT FACTUAL REPORT ADDENDA 1 OLYMPIC INSPECTOR'S RECORDS FOR JUNE 1993 POTHOLING |
4 |
0 |
Text (PDF) |
292 |
PIPELINE OPERATIONS FACTUAL REPORT |
20 |
0 |
Text (PDF) |
293 |
APPENDIX A TO THE PIPELINE OPERATIONS FACTUAL REPORT OLYMPIC PIPE LINE COMPANY SYSTEM MAP |
1 |
0 |
Text/Image (PDF or TIFF) |
294 |
APPENDIX B TO THE PIPELINE OPERATIONS FACTUAL REPORT PIPELINE INSTALLATION AND TESTING RECORDS |
21 |
0 |
Text/Image (PDF or TIFF) |
295 |
APPENDIX C TO THE PIPELINE OPERATIONS FACTUAL REPORT STONER SURGE ANALYSIS REPORT |
143 |
0 |
Text (PDF) |
296 |
APPENDIX D TO THE PIPELINE OPERATIONS FACTUAL REPORT MARMAC VALVE EFFECTIVENESS REPORT-16--BELLINGHAM AND VICINITY |
65 |
0 |
Text (PDF) |
297 |
APPENDIX E TO THE PIPELINE OPERATIONS FACTUAL REPORT MARMAC VALVE EFFECTIVENESS REPORT-16--FERNDALE TO ALLEN |
42 |
0 |
Text (PDF) |
298 |
APPENDIX F TO THE PIPELINE OPERATIONS FACTUAL REPORT MARMAC REPORT-BAYVIEW TERMINAL DESIGN REVIEW |
23 |
0 |
Text/Image (PDF or TIFF) |
299 |
APPENDIX G TO THE PIPELINE OPERATIONS FACTUAL REPORT BAYVIEW PIPELINE SHUT DOWN DATA |
12 |
0 |
Text/Image (PDF or TIFF) |
300 |
APPENDIX H TO THE PIPELINE OPERATIONS FACTUAL REPORT RON BURT OLYMPIC-INTERVIEW AND DEPOSITION TRANSCRIPTS |
267 |
0 |
Text/Image (PDF or TIFF) |
301 |
APPENDIX I TO THE PIPELINE OPERATIONS FACTUAL REPORT LLOYD TIEKEN OLYMPIC-INTERVIEW AND DEPOSITION TRANSCRIPTS |
259 |
0 |
Text/Image (PDF or TIFF) |
302 |
APPENDIX J TO THE PIPELINE OPERATIONS FACTUAL REPORTTODD SMITH OLYMPIC-INTERVIEW TRANSCRIPT |
200 |
0 |
Text/Image (PDF or TIFF) |
303 |
APPENDIX K TO THE PIPELINE OPERATIONS FACTUAL REPORT DAN YOUNT OLYMPIC-INTERVIEW TRANSCRIPT |
64 |
0 |
Text/Image (PDF or TIFF) |
304 |
APPENDIX L TO THE PIPELINE OPERATIONS FACTUAL REPORT SANDY CONLAN OLYMPIC-INTERVIEW TRANSCRIPT |
86 |
0 |
Text/Image (PDF or TIFF) |
305 |
APPENDIX M TO THE PIPELINE OPERATIONS FACTUAL REPORT AL WHITE OLYMPIC-INTERVIEW TRANSCRIPT |
94 |
0 |
Text/Image (PDF or TIFF) |
306 |
APPENDIX N TO THE PIPELINE OPERATIONS FACTUAL REPORT KEN HUFF OLYMPIC-INTERVIEW TRANSCRIPT |
52 |
0 |
Text/Image (PDF or TIFF) |
307 |
APPENDIX O TO THE PIPELINE OPERATIONS FACTUAL REPORT DAVID JUSTICE OLYMPIC-INTERVIEW TRANSCRIPT |
77 |
0 |
Text/Image (PDF or TIFF) |
308 |
APPENDIX P TO THE PIPELINE OPERATIONS FACTUAL REPORT RON GREENIDGE OLYMPIC-INTERVIEW TRANSCRIPT |
99 |
0 |
Text/Image (PDF or TIFF) |
309 |
APPENDIX Q TO THE PIPELINE OPERATIONS FACTUAL REPORT DOUG BEU OLYMPIC-INTERVIEW AND DEPOSITION TRANSCRIPTS PART A |
96 |
0 |
Text (PDF) |
310 |
APPENDIX Q TO THE PIPELINE OPERATIONS FACTUAL REPORT DOUG BEU OLYMPIC-INTERVIEW AND DEPOSITION TRANSCRIPTS PART B |
173 |
0 |
Text (PDF) |
311 |
APPENDIX R TO THE PIPELINE OPERATIONS FACTUAL REPORT ARCO INTERVIEW NOTES AND DOCUMENTATION |
13 |
0 |
Text (PDF) |
312 |
APPENDIX S TO THE PIPELINE OPERATIONS FACTUAL REPORT THUNDERCO CONTROL VALVE INFORMATION AND INTERVIEW NOTES |
27 |
0 |
Text (PDF) |
313 |
APPENDIX T TO THE PIPELINE OPERATIONS FACTUAL REPORT PHOTO 1 RV-1919 |
1 |
0 |
Standalone Photo (JPG) |
314 |
APPENDIX T TO THE PIPELINE OPERATIONS FACTUAL REPORT PHOTO 2 TWIN RELIEF VALVES AND CONNECTION TO INCOMING PIPELINES |
1 |
0 |
Standalone Photo (JPG) |
315 |
APPENDIX T TO THE PIPELINE OPERATIONS FACTUAL REPORT PHOTO 3 INLET RECEIVER AT BAYVIEW |
1 |
0 |
Standalone Photo (JPG) |
316 |
APPENDIX T TO THE PIPELINE OPERATIONS FACTUAL REPORT PHOTO 4 INLET CONTROL VALVES |
1 |
0 |
Standalone Photo (JPG) |
317 |
APPENDIX U TO THE PIPELINE OPERATIONS FACTUAL REPORT RV-1919 DOCUMENTATION AND INTERVIEW NOTES |
38 |
0 |
Text (PDF) |
318 |
APPENDIX V TO THE PIPELINE OPERATIONS FACTUAL REPORT OLYMPIC PROCEDURES |
121 |
0 |
Text (PDF) |
319 |
APPENDIX W TO THE PIPELINE OPERATIONS FACTUAL REPORT OFFICE OF PIPELINE SAFETY DOCUMENTS |
72 |
0 |
Text (PDF) |
320 |
OLYMPIC RELEASE LETTER |
1 |
0 |
Text (PDF) |
321 |
CONFIDENTIAL DOCS RELEASE 021302 |
1 |
0 |
Text (PDF) |
322 |
ALFRED WHITE COMPULSIOM ORDER |
1 |
0 |
Text (PDF) |
323 |
BAYVIEW OPERATIONS |
1 |
0 |
Text (PDF) |
324 |
MAXIMUM PRESSURE |
2 |
0 |
Text (PDF) |