# |
Title |
Pgs |
Photo |
Type |
1 |
MARINE INVESTIGATION REPORT MIR 23/26 CRANE WIRE FAILURE ON CARGO SHIP THORCO BASILISK |
16 |
6 |
Text/Image |
2 |
THORCO BASILISK - SHIP'S PARTICULARS |
1 |
0 |
Text/Image |
3 |
THORCO BASILISK - CONTINUOUS SYNOPSIS RECORD_SMNO |
1 |
0 |
Text/Image |
4 |
INTERVIEW-STEVEDORE-SHORE LABORER |
23 |
0 |
Text/Image |
5 |
INTERVIEW - THORCO BASILISK - CHIEF MATE |
20 |
0 |
Text/Image |
6 |
INTERVIEW - STEVEDORE - GANG FOREMAN |
23 |
0 |
Text/Image |
7 |
INTERVIEW-THORCO BASILISK-MASTER |
23 |
0 |
Text/Image |
8 |
INTERVIEW - THORCO BASILISK - SECOND OFFICER |
12 |
0 |
Text/Image |
9 |
INTERVIEW - STEVEDORE - SUPERINTENDENT |
43 |
0 |
Text/Image |
10 |
INTERVIEW - STEVEDORE - WALKING FOREMAN |
17 |
0 |
Text/Image |
11 |
INTERVIEW SUMMARY - STEVEDORE - CRANE OPERATOR |
3 |
0 |
Text/Image |
12 |
INTERVIEW SUMMARY - CRANE SURVEYOR |
2 |
0 |
Text/Image |
13 |
WITNESS STATEMENT - THORCO BASILISK - SECOND OFFICER |
1 |
0 |
Text/Image |
14 |
WITNESS STATEMENT - THORCO BASILISK - CHIEF MATE |
1 |
0 |
Text/Image |
15 |
WITNESS STATEMENT - THORCO BASILISK - MASTER |
2 |
0 |
Text/Image |
16 |
THORCO BASILISK - MASTER'S REPORT (1) |
1 |
0 |
Text/Image |
17 |
THORCO BASILISK - MASTER'S REPORT (2) |
1 |
0 |
Text/Image |
18 |
THORCO BASILISK - MASTER'S DAMAGE REPORT |
15 |
0 |
Text/Image |
19 |
NORDEX - CERTIFICATE OF RIGGING TEST |
4 |
0 |
Text/Image |
20 |
THORCO BASILISK - WIRE ROPE CERTIFICATE OF TEST |
1 |
0 |
Text/Image |
21 |
THORCO BASILISK - PLANNED MAINTENANCE SYSTEM_CRANE #1 EXCERPT |
4 |
0 |
Text/Image |
22 |
THORCO BASILISK - LOADING PLAN |
1 |
0 |
Text/Image |
23 |
THORCO BASILISK - 2022 DNV-GL ANNUAL SURVEY OF LIFTING APPLIANCES |
5 |
17 |
Text/Image |
24 |
THORCO BASILISK - 2019 DNV-GL LOAD TEST CERTIFICATE_CRANE #1 |
2 |
0 |
Text/Image |
25 |
THORCO BASILISK - 2018 DNV-GL LOAD TEST CERTIFICATE |
2 |
0 |
Text/Image |
26 |
THORCO BASILISK - DNV-GL ISM SHIPBOARD AUDIT REPORT |
4 |
0 |
Text/Image |
27 |
THORCO BASILISK - DNV-GL POST CASUALTY SURVEY STATEMENT_CRANE DAMAGE |
2 |
0 |
Text/Image |
28 |
THORCO BASILISK - DNV-GL POST CASUALTY SURVEY STATEMENT_CRANE DAMAGE SURVEYS |
3 |
7 |
Text/Image |
29 |
MACGREGOR - CRANE POST CASUALTY SERVICE REPORT |
6 |
8 |
Text/Image |
30 |
MACGREGOR - HANDLING AND INSTALLATION OF STEEL WIRE ROPES MANUAL-EXCERPT |
1 |
0 |
Text/Image |
31 |
MATERIALS ANALYSIS REPORT--ESI |
25 |
17 |
Text/Image |