Docket Contents

Project Summary: Rail Investigation - 70 Docket Items - RRD22LR001

Description: Derailment

Mode: Rail

NTSB Number: RRD22LR001

Date of Accident: 10/12/2021

City: Arlington

State / Region: VA

Country: United States

Project Type: Investigation


Docket Information

Creation Date: 10/28/21

Last Modified: 01/03/2024 11:36 AM

Public Release Date & Time: 02/28/2023 2:00 PM


Docket Items: 70

#

Title

Pgs

Photo

Type

1 ACCIDENT SUMMARY 1 0 Text/Image
2 SAFETY ALERT-083 - PASSENGER RAILCAR WHEELSET ALERT 4 0 Text/Image
3 TRACK-WMATA G-LINE TRACK CHART 14 0 Text/Image
4 TRACK-WMATA C-LINE TRACK CHART 24 0 Text/Image
5 TRACK-WMATA C-LINE TRACK INSPECTION RECORDS- SEPTEMBER 8 0 Text/Image
6 TRACK- WMATA C05 INTERLOCKING INSPECTION - SEPTEMBER 2 0 Text/Image
7 TRACK- WMATA C-06 INTERLOCKING INSPECTION- SEPTEMBER 4 0 Text/Image
8 TRACK-WMATA- G05 INTERLOCKING INSPECTION- SEPTEMBER 10 0 Text/Image
9 TRACK- WMATA- GEOMETRY VEHICLE SURVEY EXCEPTIONS- SEPTEMBER 35 0 Text/Image
10 WMATA TRST-1000 SUP. TRACK CONCEPTS MANUAL- VOL.3-EXCERPT 7 0 Text/Image
11 RRD22LR001- TRACK AND ENGINEERING/SIGNAL AND TRAIN CONTROL FACTUAL REPORT 26 0 Text/Image
12 ONBOARD IMAGE RECORDER & STATION VIDEO - GROUP CHAIR'S FACTUAL REPORT 17 14 Text/Image
13 VEHICLE EVENT RECORDERS SPECIALIST'S FACTUAL REPORT 14 0 Text/Image
14 VEHICLE EVENT RECORDERS SPECIALIST'S FACTUAL REPORT - ATTACHMENT 1 0 0 Other
15 VEHICLE EVENT RECORDERS SPECIALIST'S FACTUAL REPORT - ATTACHMENT 2 0 0 Other
16 VEHICLE EVENT RECORDERS SPECIALIST'S FACTUAL REPORT - ATTACHMENT 3 0 0 Other
17 HUMAN PERFORMANCE & OPERATIONS FACTUAL REPORT 12 0 Text/Image
18 HUMAN PERFORMANCE - APPENDIX A - HOW WMATA'S 7000 SERIES PROGRAM IS ORGANIZED 2 0 Text/Image
19 INTERVIEW - RTC RADIO 38 0 Text/Image
20 INTERVIEW RTC BUTTONS 49 0 Text/Image
21 INTERVIEW - DIRECTOR, ROCC 37 0 Text/Image
22 INTERVIEW - TRAIN OPERATOR 38 0 Text/Image
23 ROCC AFTER ACTION REVIEW OCT. 2021 5 0 Text/Image
24 ROCC PERFORMANCE DISCREPANCY - RTC RADIO 7 0 Text/Image
25 CERTIFICATION - TRAIN OPERATOR 2 0 Text/Image
26 TRAINING RECORDS - TRAIN OPERATOR 4 0 Text/Image
27 INCIDENT REPORT - TRAIN OPERATOR 2 0 Text/Image
28 INCIDENT REPORT - RTRA SUPERVISOR 3 0 Text/Image
29 WMATA TRAIN OPERATORS CERTIFICATION STATUS 2 0 Text/Image
30 MOC SUMMARY 20 0 Text/Image
31 MATERIALS LABORATORY FACTUAL REPORT 65 71 Text/Image
32 MATERIALS LABORATORY ADDENDUM REPORT 16 15 Text/Image
33 MECHANICAL FACTUAL REPORT 19 0 Text/Image
34 MECHANICAL APPX. A - WMATA DAILY INSPECTION PROCEDURE 27 0 Text/Image
35 MECHANICAL APPX. B - WMATA MODIFIED C TRUCK INSPECTION 60 0 Text/Image
36 MECHANICAL APPX. C - 7K DERAILMENT INSPECTION FORM 4 0 Text/Image
37 MECHANICAL APPX. D - WHEEL PROFILE MEASUREMENTS 47 0 Text/Image
38 MECHANICAL APPX. E - WMATA WAYSIDE DETECTOR INFO 51 0 Text/Image
39 MECHANICAL APPX. F - FRA MPE COMPLIANCE MANUAL CHAPTER 16 26 0 Text/Image
40 MECHANICAL APPX. G - LTK WHEEL MIGRATION REPORT 78 0 Text/Image
41 MECHANICAL APPX. H - WMATA BACK TO BACK FAILURES LEGACY/7K FLEET 4 0 Text/Image
42 MECHANICAL APPX. I - INQUIRY WMATA CONFORMED TECHNICAL SPECIFICATION DOCUMENT 8 0 Text/Image
43 MECHANICAL APPX. J - CONFORMED TECHNICAL SPECIFICATION DOCUMENT (IN PART) 7 0 Text/Image
44 CAR 7200 MAINTENANCE RECORDS 16 0 Text/Image
45 MECHANICAL - FLEET PRESS FIT ANALYSIS_FAILURE RATE DATA 2 0 Text/Image
46 HATCH LTK WMATA WHEELSET INVESTIGATION REPORT 311 0 Text/Image
47 METROS REVIEW OF MXV INVESTIGATION REPORT 187 0 Text/Image
48 KAWASAKI RAIL CAR RUNNING TEST REPORT FOR BACK-TO-BACK INVESTIGATION 33 0 Text/Image
49 WMSC RESPONSES TO NTSB QUESTIONS REGARDING OVERSIGHT 13 0 Text/Image
50 FTA-FWSO ACTIVITY STATISTICS AND TRENDS REPORT- 2019 33 0 Text/Image
51 FTA RESPONSES TO NTSB QUESTIONS REGARDING OVERSIGHT 7 0 Text/Image
52 MATERIALS LABORATORY ADDENDUM REPORT - AXLE 30 41 Text/Image
53 FEDERAL TRANSIT ADMINISTRATION- PARTY SUBMISSION RECEIVED 02/28/23. 1 0 Text/Image
54 WASHINGTON METRORAIL SAFETY COMMISSION- PARTY SUBMISSION RECEIVED 3/09/23. 10 0 Text/Image
55 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY- PARTY SUBMISSION DATED 03/10/23 13 0 Text/Image
56 KAWASAKI RAIL CAR, INC. PARTY SUBMISSION- DATED 02/27/23 15 0 Text/Image
57 WHEELSET REPLACEMENT PLAN SUMMARY EMAIL- DATED 08/02 4 0 Text/Image
58 WHEELSET REPLACEMENT PROGRAM ACCEPTANCE FROM WMSC- DATED 06/26/23 1 0 Text/Image
59 WMATA RESPONSE TO NTSB QUESTIONS- DATED 07/13/23 2 0 Text/Image
60 WMATA CONTROL CENTER TUNNEL RESPONSE- 07/14/23 1 0 Text/Image
61 HATCH LTK 7219 WHEEL MOVEMENT INVESTIGATION 30 0 Text/Image
62 WAMTA SAFETY CRITICAL ITEMS PRESENTATION 9 0 Text/Image
63 WMATA SIX-MONTH LOOK-AHEAD FOR MAINTENANCE OPERATIONS CENTER 1 0 Text/Image
64 TRANSCRIPT OF INTERVIEW - MECHANICAL OFFICERS 44 0 Text/Image
65 TRANSCRIPT OF INTERVIEW - CHIEF EXECUTIVE OFFICER 35 0 Text/Image
66 INTERVIEW- WAMTA CHIEF SAFETY OFFICER 41 0 Text/Image
67 INTERVIEW- WMATA CHIEF OPERATING OFFICER 33 0 Text/Image
68 NTSB FINAL REPORT- RIR2315 57 0 Text/Image
69 WMATA ANIMATION DESCRIPTION 3 0 Text/Image
70 WMATA ANIMATION FOR RELEASE 1 0 Other