# |
Title |
Pgs |
Photo |
Type |
1 |
ADOPTED NTSB REPORTA |
31 |
3 |
Text/Image |
2 |
CSX POST ACCIDENT ACTION |
2 |
0 |
Text/Image |
3 |
TRACK AND ENGINEERING GROUP CHAIRMAN FACTUAL REPORT |
20 |
0 |
Text/Image |
4 |
TRANSCRIPT OF INTERVIEW--TRACK INSPECTOR |
33 |
0 |
Text/Image |
5 |
TRANSCRIPT OF INTERVIEW--ROADMASTER |
34 |
0 |
Text/Image |
6 |
TRANSCRIPT OF INTERVIEW--DIRECTOR OF TRACK |
29 |
0 |
Text/Image |
7 |
TRANSCRIPT OF INTERVIEW--ASSISTANT REGIONAL ENGINEER |
28 |
0 |
Text/Image |
8 |
TRANSCRIPT OF INTERVIEW--CHIEF ENGINEER |
31 |
0 |
Text/Image |
9 |
CSX KINGSPORT SUBDIVISION TRACK CHART FOR CMG 121-127 |
1 |
0 |
Text/Image |
10 |
CSX BIG SANDY SUBDIVISION TIMETABLE NO. 2 EFFICTIVE 4-1-2019 |
32 |
0 |
Text/Image |
11 |
VIEW OF DERAILMENT SCENE SHOWING MUD SLIDE AND EQUIPMENT ON FIRE |
1 |
1 |
Text/Image |
12 |
DRAFFIN KENTUCKY CSX PREPARED DERAILMENT SCENE |
1 |
0 |
Text/Image |
13 |
FRA F 6180.39I RAILROAD ACCIDENT/INCIDENT NOTIFICATION AND INITIAL INVESTIGATION REPORT, DATED 2-13-20 |
2 |
0 |
Text/Image |
14 |
FRA TRACK INSPECTION REPORT 073, DATED 8-7-19 |
2 |
0 |
Text/Image |
15 |
FRA TRACK INSPECTION RECORDS REPORT NO. 32, DATED 2-16-20 |
1 |
0 |
Text/Image |
16 |
STATE OF KENTUCKY ENERGY AND ENVIRONMENT CABINET DEPARTMENT OF NATURAL RESOURCES, RESPONSE LETTER, DATED 2-19-20 |
2 |
0 |
Text/Image |
17 |
STATE OF KENTUCKY--DIVISION OF ABANDONED MINES AND LANDS, SITE ELIGIBILITY DATA, DATED 2-18-20 |
20 |
0 |
Text/Image |
18 |
CSX DISPATCHER WEATHER TRAINING--MODULE 5 |
1 |
0 |
Text/Image |
19 |
SIGNAL & TRAIN CONTROL GROUP - FACTUAL REPORT OF INVESTIGATION |
5 |
0 |
Text/Image |
20 |
SIGNAL GROUP - CSX, KINGSPORT SUBDIVISION TIMETABLE |
24 |
0 |
Text/Image |
21 |
SIGNAL GROUP - CSX DISPATCHER CAD DISPLAY |
1 |
0 |
Text/Image |
22 |
SIGNAL GROUP - CSX DISPATCHER CAD LOG |
1 |
0 |
Text/Image |
23 |
SIGNAL GROUP - CSX SIGNAL TROUBLE LOGS |
8 |
0 |
Text/Image |
24 |
SIGNAL GROUP - CSX SUTTON HOT BEARING LOG |
1 |
0 |
Text/Image |
25 |
SIGNAL GROUP - CSX CP ROAD CREEK 4 YEAR LOCKING AND TIMING TEST RECORDS |
2 |
0 |
Text/Image |
26 |
SIGNAL GROUP - CSX CP ROAD CREEK QUARTERLY GROUND TEST RECORD |
1 |
0 |
Text/Image |
27 |
SIGNAL GROUP - CSX CP ROAD CREEK 4 YEAR RELAY TEST RECORD |
2 |
0 |
Text/Image |
28 |
SIGNAL GROUP - CSX CP SE MARROWBONE 4 YEAR LOCKING AND TIMING TESTS |
2 |
0 |
Text/Image |
29 |
SIGNAL GROUP - CSX CP SE MARROWBONE QUARTERLY GROUND TEST RECORDS |
2 |
0 |
Text/Image |
30 |
SIGNAL GROUP - CSX CP SE MARROWBONE 2 YEAR LOCKING TEST RECORDS |
2 |
0 |
Text/Image |
31 |
SIGNAL GROUP - CSX CP SE MARROWBONE MONTHLY SWITCH TEST RECORD |
1 |
0 |
Text/Image |
32 |
SIGNAL GROUP - CSX CP SE MARROWBONE 4-YEAR RELAY TEST RECORD |
3 |
0 |
Text/Image |
33 |
SIGNAL GROUP - CSX POND CREEK GRADE CROSSING, ANNUAL TEST AND INSPECTION RECORD |
3 |
0 |
Text/Image |
34 |
SIGNAL GROUP - CSX POND CREEK GRADE CROSSING, 4-YEAR RELAY TEST RECORD |
2 |
0 |
Text/Image |
35 |
SIGNAL GROUP - NTSB SIGNAL PHOTOS |
4 |
0 |
Photo |
36 |
HAZARDOUS MATERIALS GROUP FACTUAL REPORT (WITH 41 IMBEDED IMAGES) |
48 |
0 |
Text/Image |
37 |
HAZARDOUS MATERIALS ATTACHMENT 1 - ORIGINAL CANADIAN NATIONAL RAILWAY WEIGH BILL, FEBRUARY 10, 2020 |
4 |
0 |
Text/Image |
38 |
HAZARDOUS MATERIALS ATTACHMENT 2 - RPMG TANK CAR INSPECTION CHECKLISTS, FEBRUARY 7, 2020 |
12 |
0 |
Text/Image |
39 |
HAZARDOUS MATERIALS ATTACHMENT 3 - RPMG ELECTRONIC BILL OF LADING 24040987, FEBRUARY 9, 2020 |
3 |
0 |
Text/Image |
40 |
HAZARDOUS MATERIALS ATTACHMENT 4 - RPMG SAFETY DATA SHEET, DENATURED ETHANOL, MARCH 2012 |
16 |
0 |
Text/Image |
41 |
HAZARDOUS MATERIALS ATTACHMENT 5 - CERTIFICATE OF ANALYSIS DENATURED FUEL ETHANOL, FEBRUARY 7, 2020 |
1 |
0 |
Text/Image |
42 |
HAZARDOUS MATERIALS ATTACHMENT 6 - CSXT DERAILED EQUIPMENT FLAMMABLE LIQUIDS LOSS AND RECOVERY AMOUNTS |
1 |
0 |
Text/Image |
43 |
HAZARDOUS MATERIALS ATTACHMENT 7 - CSXT TIMELINE OF EMERGENCY RESPONSE ACTIONS |
2 |
0 |
Text/Image |
44 |
HAZARDOUS MATERIALS ATTACHMENT 8 - PIKE COUNTY EMERGENCY MANAGEMENT AGENCY CAD REPORT, FEBRUARY 13, 2020 |
3 |
0 |
Text/Image |
45 |
HAZARDOUS MATERIALS ATTACHMENT 9 - PIKE COUNTY EMERGENCY MANAGEMENT AGENCY DEPUTY DIRECTOR INTERVIEW TRANSCRIPT |
21 |
0 |
Text/Image |
46 |
HAZARDOUS MATERIALS ATTACHMENT 10 - WATER SUPPLY PROTECTION PLAN |
4 |
0 |
Text/Image |
47 |
HAZARDOUS MATERIALS ATTACHMENT 11 - SURFACE WATER SAMPLING AND ANALYSIS PLAN |
15 |
0 |
Text/Image |
48 |
HAZARDOUS MATERIALS ATTACHMENT 12 - EPA COMMUNITY AIR MONITORING DATA SUMMARY |
2 |
0 |
Text/Image |
49 |
HAZARDOUS MATERIALS ATTACHMENT 13 - STANDING ORDER REPORT TRAIN K42911 |
2 |
0 |
Text/Image |
50 |
HAZARDOUS MATERIALS ATTACHMENT 14 - CSXT TRAIN CONSIST K42911 |
147 |
0 |
Text/Image |
51 |
HAZARDOUS MATERIALS ATTACHMENT 15 - AUTOMATIC EQUIPMENT IDENTIFIER REPORT, VERIFICATION OF TRAIN LIST DETAIL, FEBRUARY 14, 2020 |
4 |
0 |
Text/Image |
52 |
HAZARDOUS MATERIALS ATTACHMENT 16 - AAR FORMS 4-2, APPLICATION FOR APPROVAL AND CERTIFICATE OF CONSTRUCTION |
8 |
0 |
Text/Image |
53 |
HAZARDOUS MATERIALS ATTACHMENT 17 - EXHIBIT R-1 REPORT OF TANK REPAIRS, ALTERATION, OR CONVERSION, TILX 191300, OCTOBER 21, 2019 |
3 |
0 |
Text/Image |
54 |
HAZARDOUS MATERIALS ATTACHMENT 19 - DERAILED TANK CAR MAINTENANCE AND REPAIR RECORDS EXCERPTS |
17 |
0 |
Text/Image |
55 |
HAZARDOUS MATERIALS ATTACHMENT 20 - DERAILED TANK CAR QUALIFICATION RECORDS |
19 |
0 |
Text/Image |
56 |
OPERATIONS GROUP FACTUAL REPORT |
11 |
1 |
Text/Image |
57 |
CSX EMPLOYEE OPERATING MANUAL |
23 |
0 |
Text/Image |
58 |
UNITED STATES HAZARDOUS MATERAILS HANDLING FOR RAIL |
50 |
0 |
Text/Image |
59 |
BIG SANDY SUBDIVISION TIMETABLE NO.2 |
32 |
0 |
Text/Image |
60 |
KINGSPORT SUBDIVISION TIMETABLE NO.2 |
24 |
0 |
Text/Image |
61 |
CSX DISPATCHER BULLETIN NO.24151 |
6 |
0 |
Text/Image |
62 |
WAYBILL INFORMATION |
4 |
0 |
Text/Image |
63 |
K42911 WORK ORDER |
14 |
0 |
Text/Image |
64 |
K42911 TRIP OPTIMIZER SUMMARY |
2 |
0 |
Text/Image |
65 |
PIKE COUNTY CAD REPORT |
3 |
0 |
Text/Image |
66 |
CSX TRAIN DISPATCHER RADIO TRANSCRIPT |
7 |
0 |
Text/Image |
67 |
CSX ENGINEER INTERVIEW TRANSCRIPT |
43 |
0 |
Text/Image |
68 |
CSX TRAINMASTER INTERVIEW TRANSCRIPT |
21 |
0 |
Text/Image |
69 |
CSX ENGINEER STATEMENT |
1 |
0 |
Text/Image |
70 |
ENGINEER TRAINING TRANSCRIPT |
6 |
0 |
Text/Image |
71 |
CONDUCTOR TRAINING TRANSCRIPT |
6 |
0 |
Text/Image |
72 |
ENGINEER WORK HISTORY |
3 |
0 |
Text/Image |
73 |
CONDUCTOR WORK HISTORY |
4 |
0 |
Text/Image |
74 |
ENGINEER PHYSICAL CHARACTERISTIC TEST |
15 |
0 |
Text/Image |
75 |
CONDUCTOR PHYSICAL CHARACTERISTIC TEST |
9 |
0 |
Text/Image |
76 |
WEATHER FACTUAL REPORT |
34 |
0 |
Text/Image |
77 |
WEATHER ATTACHMENT 1 |
1 |
0 |
Other |
78 |
WEATHER ATTACHMENT 2 |
2 |
0 |
Text/Image |
79 |
WEATHER ATTACHMENT 3 |
1 |
0 |
Other |
80 |
WEATHER ATTACHMENT 4 |
7 |
0 |
Text/Image |
81 |
WEATHER ATTACHMENT 5 |
7 |
0 |
Text/Image |
82 |
WEATHER ATTACHMENT 6 |
3 |
0 |
Text/Image |
83 |
WEATHER ATTACHMENT 7 |
6 |
0 |
Text/Image |
84 |
WEATHER ATTACHMENT 8 |
1 |
0 |
Text/Image |
85 |
WEATHER ATTACHMENT 9 |
2 |
0 |
Text/Image |
86 |
WEATHER ATTACHMENT 10 |
1 |
0 |
Text/Image |