Project Summary: Rail Investigation - 103 Docket Items - RRD19FR001

Description: Derailment

Mode: Rail

NTSB Number: RRD19FR001

Date of Accident: 10/04/2018

City: Granite Canyon

State/Region: WY

Country: United States

Project Type: Investigation


Docket Information

Creation Date: 04/11/2019

Last Modified: 01/27/2021 1:44 PM

Public Release Date & Time: 01/27/2021 2:00 PM


Docket Table of Contents

Docket Items: 103
#
Title
Pgs
Photo
Type
File
1 GRANITE CANYON- ACCIDENT SUMMARY 1 0 Text/Image View
2 RAIL SAFETY RECOMMENDATION REPORT 1902- GRANITE CANYON- TRAIN EMERGENCY BRAKE COMMUNICATION 6 0 Text/Image View
3 FORCE AND MOTION STUDY 40 0 Text/Image View
4 LOCOMOTIVE EVENT RECORDER - SPECIALISTA��S FACTUAL REPORT 11 0 Text/Image View
5 LOCOMOTIVE EVENT RECORDER - ATTACHMENT 1 0 0 Other View
6 GRANITE CANYON OPERATIONS GROUP FACTUAL REPORT 16 0 Text/Image View
7 POST ACCIDENT UPRR OPERATIONAL GRADE AUDIT 1 0 Text/Image View
8 UPRR OPERATIONAL GRADE AUDIT FORM 1 0 Text/Image View
9 ENGINEER WORK HISTORY 5 0 Text/Image View
10 ENGINEER WORK/REST 1 0 Text/Image View
11 ENGINEER OPERATIONAL TESTING RECORDS 1 0 Text/Image View
12 CONDUCTOR WORK HISTORY 3 0 Text/Image View
13 CONDUCTOR EMPLOYEE RECORDS 8 0 Text/Image View
14 CONDUCTOR WORK/REST 1 0 Text/Image View
15 ENGINEER AND CONDUCTOR GRIP INVENTORIES 3 0 Text/Image View
16 DISPATCHING RADIO TRANSCRIPTS 4 0 Text/Image View
17 TRAIN DISPATCHER EMERGENCY RESPONSE GUIDELINES 2 0 Text/Image View
18 TRAIN DISPATCHER EMERGENCY NOTIFICATION PROCEDURES 2 0 Text/Image View
19 TRAIN DISPATCHER INTERVIEW TRANSCRIPT 28 0 Text/Image View
20 ENGINEER STANDING TRAIN INTERVIEW TRANSCRIPT 26 0 Text/Image View
21 CONDUCTOR STANDING TRAIN INTERVIEW TRANSCRIPT 22 0 Text/Image View
22 PHONE INTERVIEW ENGINEER GREEN RIVER TO RAWLINGS SUMMARY 1 0 Text/Image View
23 LOCAL ENGINEER SUPERVISOR INTERVIEW TRANSCRIPT 30 0 Text/Image View
24 SUPERVISOR OBSERVED AIR TEST INTERVIEW TRANSCRIPT 20 0 Text/Image View
25 ACCIDENT TRAIN CONSIST MGRCY 04 26 0 Text/Image View
26 TRAIN CONSIST MPCNP 03 35 0 Text/Image View
27 EXCERPTS UPRR GENERAL CODE OF OPERATING RULES 91 0 Text/Image View
28 EXCERPTS UPRR AIR BRAKE AND TRAIN HANDLING RULES 133 0 Text/Image View
29 EXCERPTS UPRR SAFETY RULES 5 0 Text/Image View
30 EXCERPTS UPRR SPECIAL INSTRUCTIONS 46 0 Text/Image View
31 UPRR TIMETALBE LARAMIE SUBDIVISION 8 0 Text/Image View
32 UPRR LARAMIE SUBDIVISION GENERAL ORDER NO. 3 11 0 Text/Image View
33 UPRR TRACK WARRANTS - MGRCY 04 9 0 Text/Image View
34 UPRR SUPERINTENDENT BULLETIN - TRAIN HANDLING INSTRUCTIONS 6 0 Text/Image View
35 UPRR LARAMIE YARD TRACK DESIGNATION AND DIAGRAMS 3 0 Text/Image View
36 UPRR FRA ACCIDENT REPORTS 8 0 Text/Image View
37 OVERHEAD ACCIDENT DIAGRAM 2 0 Text/Image View
38 EMERGENCY RESPONDERS CHRONOLOGY OF EVENTS 47 0 Text/Image View
39 SUMMARY OF INTERVIEW WITH INCIDENT COMMANDER 3 0 Text/Image View
40 LARAMIE COUNTY EMERGENCY MANAGEMENT AFTER ACTION MEETING AGENDA/MINUTES 3 0 Text/Image View
41 CALL DETAIL RECORDS SPECIALIST'S FACTUAL REPORT 4 0 Text/Image View
42 MEDICAL FACTUAL 16 0 Text/Image View
43 GRANITE CANYON- BROTHERHOOD OF LOCOMOTIVE ENGINEERS AND TRAINMEN PARTY SUBMISSION 36 0 Text/Image View
44 TRAIN TELEMETRY GROUP FACTUAL 8 0 Text/Image View
45 HEAD-END-DEVICE TESTING (WABTEC 10-17-18) 3 0 Text/Image View
46 UP, EOT COMMUNICATION LOSS DATA 8 0 Text/Image View
47 UP, END-OF-TRAIN DEVICE 65471, DATA LOG 0 0 Other View
48 NTSB, PHOTOS OF HEAD-OF-TRAIN AND END-OF-TRAIN DEVICES 6 0 Text/Image View
49 TRACK & ENGINEERING AND SIGNAL AND TRAIN CONTROL GROUP FACTUAL REPORT 7 0 Text/Image View
50 W534 - HOT BEARING DETECTOR REPORT FOR TRAIN MGRCY04 7 0 Text/Image View
51 W559 - HOT BEARING DETECTOR REPORT FOR TRAIN MGRCY04 13 0 Text/Image View
52 W945 - HOT BEARING DETECTOR REPORT FOR TRAIN MGRCY04 7 0 Text/Image View
53 UP DISPATCHER CENTER - CAD DEVICE DESGNATIONS FOR CP W530 - CP W528 1 0 Text/Image View
54 UP DISPATCHER CENTER, CAD LOG FOR CP W528 (18 00 45 TO 20 20 23) 2 0 Text/Image View
55 UP DISPATCHER CENTER, CAD LOG FOR CP W530 (18 03 20 TO 20 20 17) 1 0 Text/Image View
56 UP, PTC LOG - CONTROL POINT W528 0 0 Other View
57 UP, PTC LOG - CONTROL POINT W530 0 0 Other View
58 UP, VHLC LOG - CONTROL POINT W528 0 0 Other View
59 UP, HLC LOG FOR CP W530 77 0 Text/Image View
60 UP, PTC LOG - MP 526.8 0 0 Other View
61 UP, PTC LOG - MP 532 0 0 Other View
62 UP, SIGNAL DATA LOG - MP 526.8 0 0 Other View
63 UP, SIGNAL DATA LOG - MP 532 0 0 Other View
64 NTSB, SIGNAL PHOTOS 6 0 Text/Image View
65 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 1, 2018) 1 0 Text/Image View
66 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 3, 2018) 1 0 Text/Image View
67 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 5, 2018) 1 0 Text/Image View
68 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 7, 2018) 2 0 Text/Image View
69 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 9, 2018) 2 0 Text/Image View
70 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 11, 2018) 1 0 Text/Image View
71 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 13, 2018) 1 0 Text/Image View
72 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 15, 2018) 2 0 Text/Image View
73 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 17, 2018) 1 0 Text/Image View
74 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 19, 2018) 2 0 Text/Image View
75 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 21, 2018) 2 0 Text/Image View
76 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 23, 2018) 2 0 Text/Image View
77 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 25, 2018) 2 0 Text/Image View
78 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 27, 2018) 2 0 Text/Image View
79 UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 29, 2018) 2 0 Text/Image View
80 FRA, TRACK GEOMETRY INSPECTION REPORT (MP 609 TO CHEYENNE, WY) 37 0 Text/Image View
81 FRA, TRACK GEOMETRY INSPECTION REPORT (RAWLINS, WY TO CHEYENNE, WY) 28 0 Text/Image View
82 UP TRACK INSPECTION & DEFECT REPORT (OCTOBER 1, 2018) 2 0 Text/Image View
83 UP TRACK INSPECTION & DEFECT REPORT (OCTOBER 3, 2018) 2 0 Text/Image View
84 FRA POST-ACCIDENT ACTION RESPONSE 1 0 Text/Image View
85 UP POST-ACCIDENT ACTION- EOT REPEATER LIST 1 0 Text/Image View
86 AAR EARLY WARNING-5331- REPAIR OF TRAINLINE ARRANGEMENT 5 0 Text/Image View
87 MECHANICAL FACTUAL REPORT 22 0 Text/Image View
88 BLUE CARD UP 5003 3 0 Text/Image View
89 BLUE CARD UP 5412 2 0 Text/Image View
90 BLUE CARD UP 5842 2 0 Text/Image View
91 COLD WHEEL DETECTOR REPORT MGRCY 04 16 0 Text/Image View
92 HOSE TEST NDT 10 0 Text/Image View
93 HOSE TEST VACUUM 6 0 Text/Image View
94 BLET UNION PARTY SUBMISSION 36 0 Text/Image View
95 SMART UNION PARTY SUBMISSION 3 0 Text/Image View
96 PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION REQUEST FOR COMMENT- FEDERAL REGISTER- DATED 10/16/2017 2 0 Text/Image View
97 ASSOCIATION OF AMERICAN RAILROADS LETTER OPPOSING ECP BRAKES- DATED 06/12/2015 9 0 Text/Image View
98 PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION RESCINDS ECP BRAKE MANDATE RELEASE- DATED 09/24/2018 2 0 Text/Image View
99 FRA 10 MINUTES VS 10 SECONDS CLARIFICATION 7 0 Text/Image View
100 FINAL RULE 1997-01-02 TWO-WAY END-OF-TRAIN TELEMETRY 17 0 Text/Image View
101 NTSB TRAIN BRAKING STUDY-2015 32 0 Text/Image View
102 ECP FLEET STATUS PROVIDED BY FRA_12-16-2020 1 0 Text/Image View
103 ADOPTED NTSB REPORT- GRANITE CANYON, WY 58 0 Text/Image View