# |
Title |
Pgs |
Photo |
Type |
File |
1 |
GRANITE CANYON- ACCIDENT SUMMARY |
1 |
0 |
Text/Image |
View
|
2 |
RAIL SAFETY RECOMMENDATION REPORT 1902- GRANITE CANYON- TRAIN EMERGENCY BRAKE COMMUNICATION |
6 |
0 |
Text/Image |
View
|
3 |
FORCE AND MOTION STUDY |
40 |
0 |
Text/Image |
View
|
4 |
LOCOMOTIVE EVENT RECORDER - SPECIALISTA��S FACTUAL REPORT |
11 |
0 |
Text/Image |
View
|
5 |
LOCOMOTIVE EVENT RECORDER - ATTACHMENT 1 |
0 |
0 |
Other |
View
|
6 |
GRANITE CANYON OPERATIONS GROUP FACTUAL REPORT |
16 |
0 |
Text/Image |
View
|
7 |
POST ACCIDENT UPRR OPERATIONAL GRADE AUDIT |
1 |
0 |
Text/Image |
View
|
8 |
UPRR OPERATIONAL GRADE AUDIT FORM |
1 |
0 |
Text/Image |
View
|
9 |
ENGINEER WORK HISTORY |
5 |
0 |
Text/Image |
View
|
10 |
ENGINEER WORK/REST |
1 |
0 |
Text/Image |
View
|
11 |
ENGINEER OPERATIONAL TESTING RECORDS |
1 |
0 |
Text/Image |
View
|
12 |
CONDUCTOR WORK HISTORY |
3 |
0 |
Text/Image |
View
|
13 |
CONDUCTOR EMPLOYEE RECORDS |
8 |
0 |
Text/Image |
View
|
14 |
CONDUCTOR WORK/REST |
1 |
0 |
Text/Image |
View
|
15 |
ENGINEER AND CONDUCTOR GRIP INVENTORIES |
3 |
0 |
Text/Image |
View
|
16 |
DISPATCHING RADIO TRANSCRIPTS |
4 |
0 |
Text/Image |
View
|
17 |
TRAIN DISPATCHER EMERGENCY RESPONSE GUIDELINES |
2 |
0 |
Text/Image |
View
|
18 |
TRAIN DISPATCHER EMERGENCY NOTIFICATION PROCEDURES |
2 |
0 |
Text/Image |
View
|
19 |
TRAIN DISPATCHER INTERVIEW TRANSCRIPT |
28 |
0 |
Text/Image |
View
|
20 |
ENGINEER STANDING TRAIN INTERVIEW TRANSCRIPT |
26 |
0 |
Text/Image |
View
|
21 |
CONDUCTOR STANDING TRAIN INTERVIEW TRANSCRIPT |
22 |
0 |
Text/Image |
View
|
22 |
PHONE INTERVIEW ENGINEER GREEN RIVER TO RAWLINGS SUMMARY |
1 |
0 |
Text/Image |
View
|
23 |
LOCAL ENGINEER SUPERVISOR INTERVIEW TRANSCRIPT |
30 |
0 |
Text/Image |
View
|
24 |
SUPERVISOR OBSERVED AIR TEST INTERVIEW TRANSCRIPT |
20 |
0 |
Text/Image |
View
|
25 |
ACCIDENT TRAIN CONSIST MGRCY 04 |
26 |
0 |
Text/Image |
View
|
26 |
TRAIN CONSIST MPCNP 03 |
35 |
0 |
Text/Image |
View
|
27 |
EXCERPTS UPRR GENERAL CODE OF OPERATING RULES |
91 |
0 |
Text/Image |
View
|
28 |
EXCERPTS UPRR AIR BRAKE AND TRAIN HANDLING RULES |
133 |
0 |
Text/Image |
View
|
29 |
EXCERPTS UPRR SAFETY RULES |
5 |
0 |
Text/Image |
View
|
30 |
EXCERPTS UPRR SPECIAL INSTRUCTIONS |
46 |
0 |
Text/Image |
View
|
31 |
UPRR TIMETALBE LARAMIE SUBDIVISION |
8 |
0 |
Text/Image |
View
|
32 |
UPRR LARAMIE SUBDIVISION GENERAL ORDER NO. 3 |
11 |
0 |
Text/Image |
View
|
33 |
UPRR TRACK WARRANTS - MGRCY 04 |
9 |
0 |
Text/Image |
View
|
34 |
UPRR SUPERINTENDENT BULLETIN - TRAIN HANDLING INSTRUCTIONS |
6 |
0 |
Text/Image |
View
|
35 |
UPRR LARAMIE YARD TRACK DESIGNATION AND DIAGRAMS |
3 |
0 |
Text/Image |
View
|
36 |
UPRR FRA ACCIDENT REPORTS |
8 |
0 |
Text/Image |
View
|
37 |
OVERHEAD ACCIDENT DIAGRAM |
2 |
0 |
Text/Image |
View
|
38 |
EMERGENCY RESPONDERS CHRONOLOGY OF EVENTS |
47 |
0 |
Text/Image |
View
|
39 |
SUMMARY OF INTERVIEW WITH INCIDENT COMMANDER |
3 |
0 |
Text/Image |
View
|
40 |
LARAMIE COUNTY EMERGENCY MANAGEMENT AFTER ACTION MEETING AGENDA/MINUTES |
3 |
0 |
Text/Image |
View
|
41 |
CALL DETAIL RECORDS SPECIALIST'S FACTUAL REPORT |
4 |
0 |
Text/Image |
View
|
42 |
MEDICAL FACTUAL |
16 |
0 |
Text/Image |
View
|
43 |
GRANITE CANYON- BROTHERHOOD OF LOCOMOTIVE ENGINEERS AND TRAINMEN PARTY SUBMISSION |
36 |
0 |
Text/Image |
View
|
44 |
TRAIN TELEMETRY GROUP FACTUAL |
8 |
0 |
Text/Image |
View
|
45 |
HEAD-END-DEVICE TESTING (WABTEC 10-17-18) |
3 |
0 |
Text/Image |
View
|
46 |
UP, EOT COMMUNICATION LOSS DATA |
8 |
0 |
Text/Image |
View
|
47 |
UP, END-OF-TRAIN DEVICE 65471, DATA LOG |
0 |
0 |
Other |
View
|
48 |
NTSB, PHOTOS OF HEAD-OF-TRAIN AND END-OF-TRAIN DEVICES |
6 |
0 |
Text/Image |
View
|
49 |
TRACK & ENGINEERING AND SIGNAL AND TRAIN CONTROL GROUP FACTUAL REPORT |
7 |
0 |
Text/Image |
View
|
50 |
W534 - HOT BEARING DETECTOR REPORT FOR TRAIN MGRCY04 |
7 |
0 |
Text/Image |
View
|
51 |
W559 - HOT BEARING DETECTOR REPORT FOR TRAIN MGRCY04 |
13 |
0 |
Text/Image |
View
|
52 |
W945 - HOT BEARING DETECTOR REPORT FOR TRAIN MGRCY04 |
7 |
0 |
Text/Image |
View
|
53 |
UP DISPATCHER CENTER - CAD DEVICE DESGNATIONS FOR CP W530 - CP W528 |
1 |
0 |
Text/Image |
View
|
54 |
UP DISPATCHER CENTER, CAD LOG FOR CP W528 (18 00 45 TO 20 20 23) |
2 |
0 |
Text/Image |
View
|
55 |
UP DISPATCHER CENTER, CAD LOG FOR CP W530 (18 03 20 TO 20 20 17) |
1 |
0 |
Text/Image |
View
|
56 |
UP, PTC LOG - CONTROL POINT W528 |
0 |
0 |
Other |
View
|
57 |
UP, PTC LOG - CONTROL POINT W530 |
0 |
0 |
Other |
View
|
58 |
UP, VHLC LOG - CONTROL POINT W528 |
0 |
0 |
Other |
View
|
59 |
UP, HLC LOG FOR CP W530 |
77 |
0 |
Text/Image |
View
|
60 |
UP, PTC LOG - MP 526.8 |
0 |
0 |
Other |
View
|
61 |
UP, PTC LOG - MP 532 |
0 |
0 |
Other |
View
|
62 |
UP, SIGNAL DATA LOG - MP 526.8 |
0 |
0 |
Other |
View
|
63 |
UP, SIGNAL DATA LOG - MP 532 |
0 |
0 |
Other |
View
|
64 |
NTSB, SIGNAL PHOTOS |
6 |
0 |
Text/Image |
View
|
65 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 1, 2018) |
1 |
0 |
Text/Image |
View
|
66 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 3, 2018) |
1 |
0 |
Text/Image |
View
|
67 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 5, 2018) |
1 |
0 |
Text/Image |
View
|
68 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 7, 2018) |
2 |
0 |
Text/Image |
View
|
69 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 9, 2018) |
2 |
0 |
Text/Image |
View
|
70 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 11, 2018) |
1 |
0 |
Text/Image |
View
|
71 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 13, 2018) |
1 |
0 |
Text/Image |
View
|
72 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 15, 2018) |
2 |
0 |
Text/Image |
View
|
73 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 17, 2018) |
1 |
0 |
Text/Image |
View
|
74 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 19, 2018) |
2 |
0 |
Text/Image |
View
|
75 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 21, 2018) |
2 |
0 |
Text/Image |
View
|
76 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 23, 2018) |
2 |
0 |
Text/Image |
View
|
77 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 25, 2018) |
2 |
0 |
Text/Image |
View
|
78 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 27, 2018) |
2 |
0 |
Text/Image |
View
|
79 |
UP TRACK INSPECTION & DEFECT REPORT (SEPTEMBER 29, 2018) |
2 |
0 |
Text/Image |
View
|
80 |
FRA, TRACK GEOMETRY INSPECTION REPORT (MP 609 TO CHEYENNE, WY) |
37 |
0 |
Text/Image |
View
|
81 |
FRA, TRACK GEOMETRY INSPECTION REPORT (RAWLINS, WY TO CHEYENNE, WY) |
28 |
0 |
Text/Image |
View
|
82 |
UP TRACK INSPECTION & DEFECT REPORT (OCTOBER 1, 2018) |
2 |
0 |
Text/Image |
View
|
83 |
UP TRACK INSPECTION & DEFECT REPORT (OCTOBER 3, 2018) |
2 |
0 |
Text/Image |
View
|
84 |
FRA POST-ACCIDENT ACTION RESPONSE |
1 |
0 |
Text/Image |
View
|
85 |
UP POST-ACCIDENT ACTION- EOT REPEATER LIST |
1 |
0 |
Text/Image |
View
|
86 |
AAR EARLY WARNING-5331- REPAIR OF TRAINLINE ARRANGEMENT |
5 |
0 |
Text/Image |
View
|
87 |
MECHANICAL FACTUAL REPORT |
22 |
0 |
Text/Image |
View
|
88 |
BLUE CARD UP 5003 |
3 |
0 |
Text/Image |
View
|
89 |
BLUE CARD UP 5412 |
2 |
0 |
Text/Image |
View
|
90 |
BLUE CARD UP 5842 |
2 |
0 |
Text/Image |
View
|
91 |
COLD WHEEL DETECTOR REPORT MGRCY 04 |
16 |
0 |
Text/Image |
View
|
92 |
HOSE TEST NDT |
10 |
0 |
Text/Image |
View
|
93 |
HOSE TEST VACUUM |
6 |
0 |
Text/Image |
View
|
94 |
BLET UNION PARTY SUBMISSION |
36 |
0 |
Text/Image |
View
|
95 |
SMART UNION PARTY SUBMISSION |
3 |
0 |
Text/Image |
View
|
96 |
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION REQUEST FOR COMMENT- FEDERAL REGISTER- DATED 10/16/2017 |
2 |
0 |
Text/Image |
View
|
97 |
ASSOCIATION OF AMERICAN RAILROADS LETTER OPPOSING ECP BRAKES- DATED 06/12/2015 |
9 |
0 |
Text/Image |
View
|
98 |
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION RESCINDS ECP BRAKE MANDATE RELEASE- DATED 09/24/2018 |
2 |
0 |
Text/Image |
View
|
99 |
FRA 10 MINUTES VS 10 SECONDS CLARIFICATION |
7 |
0 |
Text/Image |
View
|
100 |
FINAL RULE 1997-01-02 TWO-WAY END-OF-TRAIN TELEMETRY |
17 |
0 |
Text/Image |
View
|
101 |
NTSB TRAIN BRAKING STUDY-2015 |
32 |
0 |
Text/Image |
View
|
102 |
ECP FLEET STATUS PROVIDED BY FRA_12-16-2020 |
1 |
0 |
Text/Image |
View
|
103 |
ADOPTED NTSB REPORT- GRANITE CANYON, WY |
58 |
0 |
Text/Image |
View
|