1-NTSB PIPELINE INVESTIGATIVE REPORT PIR-26-02 |
10 |
0 |
Text/Image |
View
|
| 2 |
IIC-PRELIMINARY REPORT |
3 |
0 |
Text/Image |
View
|
| 3 |
1-IIC-ACCIDENT SUMMARY |
2 |
0 |
Text/Image |
View
|
| 4 |
1-IIC-PARTY SUBMISSION-ENBRIDGE GAS UTAH PARTY SUBMISSION FOR PLD25FR001 SOUTH JORDAN, UT |
18 |
0 |
Text/Image |
View
|
| 5 |
2-PIPELINE OPERATIONS-GROUP CHAIR'S FACTUAL REPORT |
17 |
0 |
Text/Image |
View
|
| 6 |
2-PIPELINE OPERATIONS-ENBRIDGE LEAK INVESTIGATION PROCEDURE BAR HOLE LOCATIONS |
1 |
0 |
Text/Image |
View
|
| 7 |
2-PIPELINE OPERATIONS-ENBRIDGE GAS UTAH STANDARD PRACTICE 2-33-07 |
1 |
0 |
Text/Image |
View
|
| 8 |
2-PIPELINE OPERATIONS-ENBRIDGE GAS UTAH STANDARD PRACTICE 2-17-02 EXCAVATION AND BACKFILLING, BACKFILLING INSTRUCTION |
1 |
0 |
Text/Image |
View
|
| 9 |
2-PIPELINE OPERATIONS-ODORIZATION REPORT PROVIDED BY ENBRIDGE GAS UTAH |
3 |
0 |
Text/Image |
View
|
| 10 |
2-PIPELINE OPERATIONS-IHP SYSTEM PRESSURE IN REVIEW PROVIDED BY ENBRIDGE GAS UTAH |
1 |
0 |
Text/Image |
View
|
| 11 |
2-PIPELINE OPERATIONS-HOUSE PLANS-INVERTED |
8 |
0 |
Text/Image |
View
|
| 12 |
2-PIPELINE OPERATIONS-GAS LOSS CALCULATION PROVIDED BY ENBRIDGE GAS UTAH |
1 |
0 |
Text/Image |
View
|
| 13 |
2-PIPELINE OPERATIONS-PRINT LINE FROM LEAKING 4-INCH ALDYL A PIPELINE-IMAGE PROVIDED BY ENBRIDGE GAS UTAH |
1 |
0 |
Text/Image |
View
|
| 14 |
2-PIPELINE OPERATIONS-PERMISSION TO REMOVE CONFIDENTIAL MARKINGS FROM BAR HOLE SHEETS |
1 |
0 |
Text/Image |
View
|
| 15 |
2-PIPELINE OPERATIONS - POST ACCIDENT BAR HOLE GAS READINGS 11.6.24 THROUGH 11.8.24 |
10 |
0 |
Text/Image |
View
|
| 16 |
2-PIPELINE OPERATIONS - STATE OF UTAH DEPARTMENT OF PUBLIC SAFETY CASE FILE# 132024-112 FIRE MARSHAL REPORT OF INVESTIGATION 10593 SOUTH JORDAN, UT |
47 |
0 |
Text/Image |
View
|
| 17 |
3-EMERGENCY RESPONSE- EMERGENCY RESPONSE GROUP FACTUAL REPORT |
25 |
0 |
Text/Image |
View
|
| 18 |
3-EMERGENCY RESPONSE- UTAH STATE REGULATORY STATUTE |
3 |
0 |
Text/Image |
View
|
| 19 |
3-EMERGENCY RESPONSE- SLVECC DISPATCH RECORDS |
50 |
0 |
Text/Image |
View
|
| 20 |
3-EMERGENCY RESPONSE- SJFD EMERGENCY RESPONSE POLICY |
2 |
0 |
Text/Image |
View
|
| 21 |
3-EMERGENCY RESPONSE- SJFD FIREGROUND ACCOUNTABILITY POLICY |
2 |
0 |
Text/Image |
View
|
| 22 |
3-EMERGENCY RESPONSE- SJFD HAZARDOUS MATERIALS RESPONSE POLICY |
3 |
0 |
Text/Image |
View
|
| 23 |
4-MATERIALS LABORATORY FACTUAL REPORT 25-026 |
17 |
15 |
Text/Image |
View
|
| 24 |
4-MATERIALS LABORATORY - DUPONT ALDYL A TECHNICAL BULLETIN 200 FROM 1975 |
6 |
0 |
Text/Image |
View
|
| 25 |
5-INTEGRITY MANAGEMENT- GROUP CHAIR'S FACTUAL REPORT |
18 |
0 |
Text/Image |
View
|
| 26 |
5-INTEGRITY MANAGEMENT-2023 DISTRIBUTION INTEGRITY MANAGMENT (DIM) REPORT |
1 |
0 |
Text/Image |
View
|
| 27 |
5-INTEGRITY MANAGEMENT-ENBRIDGE GAS UTAH DIMP SECTION 7.3 |
2 |
0 |
Text/Image |
View
|
| 28 |
5-INTEGRITY MANAGEMENT-RISK FACTOR SUMMARY PROVIDED BY ENBRIDGE GAS UTAH |
4 |
0 |
Text/Image |
View
|
| 29 |
5-INTEGRITY MANAGEMENT-ENBRIDGE GAS UTAH-DIMP ELEMENTS |
1 |
0 |
Text/Image |
View
|
| 30 |
5-INTEGRITY MANAGEMENT-AS CONSTRUCTED FIELD NOTES PROVIDED BY ENBRIDGE GAS UTAH |
1 |
0 |
Text/Image |
View
|
| 31 |
5-INTEGRITY MANAGEMENT-ALDYL A MAIN FOOTAGE BY YEAR OF INSTALL PROVIDED BY ENBRIDGE GAS UTAH |
2 |
0 |
Text/Image |
View
|
| 32 |
5-INTEGRITY MANAGEMENT-DIMP ACCELERATION ACTIONS (ALDYL A) PROVIDED BY ENBRIDGE GAS UTAH |
1 |
0 |
Text/Image |
View
|
| 33 |
5-INTEGRITY MANAGEMENT-2023 DISTRIBUTION INTEGRITY MANAGEMENT REPORT 2023 PROVIDED BY ENBRIDGE GAS UTAH |
1 |
0 |
Text/Image |
View
|
| 34 |
5 - INTEGRITY MANAGEMENT-UTAH DIVISION OF PUBLIC UTILITIES 11.5.2018 INSPECTION CORRESPONDENCE |
2 |
0 |
Text/Image |
View
|
| 35 |
5-INTEGRITY MANAGEMENT-UTAH DIVISION OF PUBLIC UTILITIES INSPECTION CORRESPONDENCE 12.13.2021 |
2 |
0 |
Text/Image |
View
|
| 36 |
5-INTEGRITY MANAGEMENT-UTAH DIVISION OF PUBLIC UTILITIES CORRESPONDENCE 3.27.2019 |
2 |
0 |
Text/Image |
View
|
| 37 |
5-INTEGRITY MANAGEMENT-HAZARD ANALYSIS & MITIGATION REPORT ON ALDYL A POLYETHYLENE GAS PIPELINES IN CALIFORNIA |
36 |
0 |
Text/Image |
View
|
| 38 |
6-EMERGENCY RESPONSE- INTERVIEW TRANSCRIPT SJFD CAPTAIN, STATION 62 |
27 |
0 |
Text/Image |
View
|
| 39 |
6-EMERGENCY RESPONSE- INTERVIEW ERRATA SHEET SJFD CAPTAIN, STATION 62 |
1 |
0 |
Text/Image |
View
|
| 40 |
6-EMERGENCY RESPONSE- INTERVIEW TRANSCRIPT SJFD BATTALION CHIEF |
36 |
0 |
Text/Image |
View
|
| 41 |
6-EMERGENCY RESPONSE- INTERVIEW TRANSCRIPT ENBRIDGE GAS OPERATIONS SUPERVISOR |
30 |
0 |
Text/Image |
View
|
| 42 |
6-EMERGENCY RESPONSE- INTERVIEW TRANSCRIPT ENBRIDGE GAS OPERATIONS REPRESENTATIVE III |
49 |
0 |
Text/Image |
View
|
| 43 |
6-EMERGENCY RESPONSE- INTERVIEW TRANSCRIPT ENBRIDGE GAS OPERATIONS FOREMAN |
46 |
0 |
Text/Image |
View
|
| 44 |
5-INTEGRITY MANAGEMENT- HISTORY OF ALDYL A PIPING SYSTEM BY DR. GENE PALERMO |
44 |
0 |
Text/Image |
View
|