# |
Title |
Pgs |
Photo |
Type |
File |
1 |
PRELIMINARY REPORT |
3 |
0 |
Text/Image |
View
|
2 |
1 - IIC - ACCIDENT SUMMARY |
2 |
0 |
Text/Image |
View
|
3 |
1 - IIC - NTSB SLIDES FROM REPRESENTATIVE THOMPSON COMMUNITY MEETING |
24 |
0 |
Text/Image |
View
|
4 |
2 - PIPELINE OPERATIONS - PIPELINE OPERATIONS FACTUAL REPORT |
79 |
0 |
Text/Image |
View
|
5 |
2 - PIPELINE OPERATIONS - ATMOS MISSISSIPPI DIVISION ORGANIZATION CHART |
17 |
0 |
Text/Image |
View
|
6 |
2 - PIPELINE OPERATIONS - MERGER DOCUMENTS-ATMOS AND MVG |
13 |
0 |
Text/Image |
View
|
7 |
2 - PIPELINE OPERATIONS - ATMOS SUMMARY OF PSMS |
1 |
0 |
Text/Image |
View
|
8 |
2 - PIPELINE OPERATIONS - MAP OF KNOWN LEAKS 1.24.2024 IN 5-MILE RADIUS |
1 |
0 |
Text/Image |
View
|
9 |
2 - PIPELINE OPERATIONS - MAP OF OPEN GRADE 2 AND 3 BELOWGROUND LEAKS |
1 |
0 |
Text/Image |
View
|
10 |
2 - PIPELINE OPERATIONS - ATMOS MISSISSIPPI AMLD LEAK SURVEYS IN OCT-DEC 2023 |
1 |
0 |
Text/Image |
View
|
11 |
2 - PIPELINE OPERATIONS - 2022 REVIEW OF PUBLIC AWARENESS PROGRAM |
25 |
0 |
Text/Image |
View
|
12 |
2 - PIPELINE OPERATIONS - BAR HOLE SKETCH - LOCATION 1-1.24.2024 AT 1242 PM |
1 |
0 |
Text/Image |
View
|
13 |
2 - PIPELINE OPERATIONS - BAR HOLE SKETCH AT LOCATION 1-1.24.2024 AT 547 PM |
1 |
0 |
Text/Image |
View
|
14 |
2 - PIPELINE OPERATIONS - BAR HOLE SKETCH AT LOCATION 2-1.27.2024 AT 940 AM |
2 |
0 |
Text/Image |
View
|
15 |
2 - PIPELINE OPERATIONS - BAR HOLE SKETCH AT LOCATION 2-1.27.2024 AT 530 AM |
1 |
0 |
Text/Image |
View
|
16 |
2 - PIPELINE OPERATIONS - TIMELINE AT LOCATION 1 AS OF 1.30.2024 |
1 |
0 |
Text/Image |
View
|
17 |
2 - PIPELINE OPERATIONS - EMC SURVEY AT LOCATION 1 |
1 |
0 |
Text/Image |
View
|
18 |
2 - PIPELINE OPERATIONS - LEL READINGS AT LOCATION 1 |
83 |
0 |
Text/Image |
View
|
19 |
2 - PIPELINE OPERATIONS - LOCATION 1 TEST PROTOCOL AND RESULTS 2.8.2024 |
5 |
0 |
Text/Image |
View
|
20 |
2 - PIPELINE OPERATIONS - OVERNIGHT SURVEYS AT LOCATION 1 FROM 1.24.2024 TO 1.26.2024 |
13 |
0 |
Text/Image |
View
|
21 |
2 - PIPELINE OPERATIONS - ODOR CALLS AT 185 BRISTOL BOULEVARD - 5 YEARS |
2 |
0 |
Text/Image |
View
|
22 |
2 - PIPELINE OPERATIONS - EXCERPTS OF SERVICE ORDERS FOR 175, 185, & 190 BRISTOL BOULEVARD 2018-2024 |
14 |
0 |
Text/Image |
View
|
23 |
2 - PIPELINE OPERATIONS - TIMELINE AT LOCATION 2 AS OF 2.1.2024 |
1 |
0 |
Text/Image |
View
|
24 |
2 - PIPELINE OPERATIONS - EMC SURVEY AT LOCATION 2 |
1 |
0 |
Text/Image |
View
|
25 |
2 - PIPELINE OPERATIONS - LEL READINGS AT LOCATION 2 |
31 |
0 |
Text/Image |
View
|
26 |
2 - PIPELINE OPERATIONS - LOCATION 2 TEST PROTOCOL AND RESULTS 2.8.2024 |
5 |
0 |
Text/Image |
View
|
27 |
2 - PIPELINE OPERATIONS - LEAK RECORDS AT 1138 SHALIMAR 12.1.2023 |
2 |
0 |
Text/Image |
View
|
28 |
2 - PIPELINE OPERATIONS - EXCERPTS OF SERVICE ORDERS FOR 1138, 1139, 1146, & 1147 SHALIMAR DRIVE 2021-2024 |
27 |
0 |
Text/Image |
View
|
29 |
2 - PIPELINE OPERATIONS - CONSTRUCTION RECORDS AT LOCATION 2 |
4 |
0 |
Text/Image |
View
|
30 |
2 - PIPELINE OPERATIONS - SYSTEM PRESSURE READINGS FOR LOCATIONS 1&2 |
7 |
0 |
Text/Image |
View
|
31 |
2 - PIPELINE OPERATIONS - PROJECT SUMMARY SHEET-BRISTOL MAIN |
3 |
0 |
Text/Image |
View
|
32 |
2 - PIPELINE OPERATIONS - COMPLETION DRAWINGS-BRISTOL MAIN |
1 |
0 |
Text/Image |
View
|
33 |
2 - PIPELINE OPERATIONS - COMBINED LEAK COMPLIANCE RECORDS BRISTOL MAIN 10.16.2018 & 11.17.2023 |
4 |
0 |
Text/Image |
View
|
34 |
2 - PIPELINE OPERATIONS - EXCERPT OF SERVICE PROCEDURE MANUAL CH.2 |
16 |
0 |
Text/Image |
View
|
35 |
2 - PIPELINE OPERATIONS - EXCERPT OF O&M-CONSTRUCTION MANUAL CH. 4 SQUEEZE METHOD |
3 |
0 |
Text/Image |
View
|
36 |
2 - PIPELINE OPERATIONS - EXCERPT OF O&M-CH.8 VALVE MAINTENANCE |
3 |
0 |
Text/Image |
View
|
37 |
2 - PIPELINE OPERATIONS - EXCERPT OF O&M-CH.9 GAS LEAK SURVEYS |
21 |
0 |
Text/Image |
View
|
38 |
2 - PIPELINE OPERATIONS - EXCERPT OF O&M-CH.10 PIPELINE PATROLLING |
4 |
0 |
Text/Image |
View
|
39 |
2 - PIPELINE OPERATIONS - EXCERPT OF PIPELINE SAFETY PUBLIC AWARENESS PROGRAM |
22 |
0 |
Text/Image |
View
|
40 |
2 - PIPELINE OPERATIONS - EXCERPTS - PUBLIC EDUCATION |
5 |
0 |
Text/Image |
View
|
41 |
2 - PIPELINE OPERATIONS - TABLE OF PERSONNEL AND OQS |
14 |
0 |
Text/Image |
View
|
42 |
2 - PIPELINE OPERATIONS - EXCERPT OF OPERATOR QUALIFICATION PLAN |
9 |
0 |
Text/Image |
View
|
43 |
2 - PIPELINE OPERATIONS - EXCERPT OF OPERATOR QUALIFICATION PLAN-CONTRACTOR PROVISIONS |
4 |
0 |
Text/Image |
View
|
44 |
2 - PIPELINE OPERATIONS - PSMS API RP 1173 IMPLEMENTATION GUIDANCE |
4 |
0 |
Text/Image |
View
|
45 |
2 - PIPELINE OPERATIONS - MS PSC DIRECTOR OF PIPELINE SAFETY INCIDENT NOTES 4.12.2024 |
2 |
0 |
Text/Image |
View
|
46 |
2 - PIPELINE OPERATIONS - EMAIL FROM MS PSC DIRECTOR OF PIPELINE SAFETY TO NTSB ON 6.18.2024 |
2 |
0 |
Text/Image |
View
|
47 |
2 - PIPELINE OPERATIONS - EMAIL FROM ATMOS VICE PRESIDENT-PIPELINE SAFETY TO NTSB ON 7.5.2024 |
2 |
0 |
Text/Image |
View
|
48 |
2 - PIPELINE OPERATIONS - EMAIL FROM ATMOS VICE PRESIDENT-PIPELINE SAFETY TO NTSB ON 7.3.2024 |
2 |
0 |
Text/Image |
View
|
49 |
2 - PIPELINE OPERATIONS - EMAIL FROM ATMOS VICE PRESIDENT-PIPELINE SAFETY TO NTSB ON 7.26.2024 |
4 |
0 |
Text/Image |
View
|
50 |
2 - PIPELINE OPERATIONS - EMAIL FROM ATMOS VICE PRESIDENT-PIPELINE SAFETY TO NTSB ON 11.21.2024 |
2 |
0 |
Text/Image |
View
|
51 |
2 - PIPELINE OPERATIONS - EMAIL FROM NTSB METEOROLOGY SPECIALIST TO IIC ON 9.5.2024 |
1 |
0 |
Text/Image |
View
|
52 |
2 - PIPELINE OPERATIONS - EMAIL FROM HAYNES TO NTSB ON 4.17.2024 |
3 |
0 |
Text/Image |
View
|
53 |
2 - PIPELINE OPERATIONS - EMAIL FROM ATMOS VICE PRESIDENTA��PIPELINE SAFETY TO NTSB ON 4.19.2024 |
4 |
0 |
Text/Image |
View
|
54 |
2 - PIPELINE OPERATIONS - EMAIL FROM ATMOS VICE PRESIDENTA��PIPELINE SAFETY TO NTSB ON 3.27.2024 |
1 |
0 |
Text/Image |
View
|
55 |
2 - PIPELINE OPERATIONS - EMAIL FROM ATMOS VICE PRESIDENTA��PIPELINE SAFETY TO NTSB ON 3.15.2024 |
1 |
0 |
Text/Image |
View
|
56 |
2 - PIPELINE OPERATIONS - EMAIL FROM ATMOS VICE PRESIDENTA��PIPELINE SAFETY TO NTSB ON 3.11.2024 |
2 |
0 |
Text/Image |
View
|
57 |
2 - PIPELINE OPERATIONS - EMAIL FROM AGA DIRECTOR, ENERGY STANDARDS TO NTSB ON 9.24.2024 |
6 |
0 |
Text/Image |
View
|
58 |
3 - MATERIALS - 24-023 MATERIALS LABORATORY FACTUAL REPORT (PLD24FR003) (MAIN AND TEE ASSEMBLIES) |
33 |
28 |
Text/Image |
View
|
59 |
4 A�� INTEGRITY MANAGEMENT - INTEGRITY MANAGEMENT FACTUAL REPORT |
36 |
0 |
Other |
View
|
60 |
4 A�� INTEGRITY MANAGEMENT A�� ATMOS ENERGYA��S RESPONSES TO DATA REQUESTS (PROVIDED MAY 2, 2024) |
2 |
0 |
Other |
View
|
61 |
4 A�� INTEGRITY MANAGEMENT - ADDITIONAL DATA ON KNOWN COUPLINGS ON 1-30-24 (2 MILE RADIUS) |
9 |
0 |
Text/Image |
View
|
62 |
4 A�� INTEGRITY MANAGEMENT - EMAIL POST MEETING IN JACKSON (GIS DATA) |
3 |
0 |
Text/Image |
View
|
63 |
4 A�� INTEGRITY MANAGEMENT - SYSTEM MAP SHALIMAR |
1 |
0 |
Other |
View
|
64 |
4 A�� INTEGRITY MANAGEMENT - SYSTEM MAP BRISTOL |
1 |
0 |
Other |
View
|
65 |
4 A�� INTEGRITY MANAGEMENT A�� CONTINUOUS IMPROVEMENT SAFETY INITIATIVES REPORTED BY ATMOS |
5 |
0 |
Other |
View
|
66 |
4 A�� INTEGRITY MANAGEMENT - LEAK REPAIR DATA FOR MS (2014-2023) |
592 |
0 |
Other |
View
|
67 |
4 A�� INTEGRITY MANAGEMENT A�� BRISTOL AND SHALIMAR ATMOSPHERIC CORROSION REPORTS |
1 |
0 |
Text/Image |
View
|
68 |
4 A�� INTEGRITY MANAGEMENT A�� EXCERPT OF DIM PROGRAM INTRODUCTION PPT FOR NTSB MTG (DNV DRAM MODEL) |
1 |
0 |
Other |
View
|
69 |
4 A�� INTEGRITY MANAGEMENT A�� NUMBER OF KNOWN LEAKS AT YEAR-END IN MISSISSIPPI (2014-2023) |
1 |
0 |
Other |
View
|
70 |
4 A�� INTEGRITY MANAGEMENT A�� LIST OF 10 YEAR HISTORY OF MFF (MECHANICAL FITTING FAILURES) |
3 |
0 |
Text/Image |
View
|
71 |
4 A�� INTEGRITY MANAGEMENT A�� MS PSC ACTIONS TAKEN EMAIL- JACKSON, MS (PLD24FR003) |
2 |
0 |
Text/Image |
View
|
72 |
4 A�� INTEGRITY MANAGEMENT A�� BRISTOL & SHALIMAR JACKSON 811 CALLS SINCE 2019 |
3 |
0 |
Other |
View
|
73 |
4 A�� INTEGRITY MANAGEMENT A�� 10 YEAR MFF (MECHANICAL FITTING FAILURES) LEAK REPAIR DATA (SOUTH JACKSON) |
3 |
0 |
Other |
View
|
74 |
4 A�� INTEGRITY MANAGEMENT A�� EXCERPT OF DIM PLAN - RISK ANALYSIS FACTOR LIST |
2 |
0 |
Other |
View
|
75 |
4 A�� INTEGRITY MANAGEMENT A�� EXCERPT OF DIM PLAN - LEAK MANAGEMENT PROGRAM |
2 |
0 |
Other |
View
|
76 |
4 A�� INTEGRITY MANAGEMENT A�� EARTH FACTOR RISK MODEL METHODOLOGY |
4 |
0 |
Other |
View
|
77 |
4 A�� INTEGRITY MANAGEMENT A�� EXCERPT OF DIM PLAN - APPENDIX D2 LEAK MANAGEMENT PROGRAM |
1 |
0 |
Other |
View
|
78 |
4 A�� INTEGRITY MANAGEMENT A�� MAP OF DIM GRIDS FOR SOUTH JACKSON AREA |
1 |
0 |
Other |
View
|
79 |
4 A�� INTEGRITY MANAGEMENT A�� DIM HRR GRID2KS CY2023 (MISSISSIPPI) |
2 |
0 |
Other |
View
|
80 |
4 A�� INTEGRITY MANAGEMENT A�� MAIN AND SERVICE GRID2K RESULTS - 185 BRISTOL AND 1146 SHALIMAR GRIDS |
1 |
0 |
Other |
View
|
81 |
4 A�� INTEGRITY MANAGEMENT A�� EXCERPT OF DIM PLAN - POTENTIAL ADDITIONAL AND ACCELERATED ACTIONS |
1 |
0 |
Other |
View
|
82 |
4 A�� INTEGRITY MANAGEMENT A�� EXCERPT OF DIM PLAN - RISK ASSESSMENT METHODOLOGY |
2 |
0 |
Other |
View
|
83 |
4 A�� INTEGRITY MANAGEMENT A�� EXCERPT OF DIM PROGRAM INTRODUCTION PPT FOR NTSB MTG (RISK CALCULATION) |
1 |
0 |
Other |
View
|
84 |
4 A�� INTEGRITY MANAGEMENT A�� EXCERPT OF DIM PLAN - TABLE OF CONTENTS |
2 |
0 |
Other |
View
|
85 |
4 A�� INTEGRITY MANAGEMENT A�� MAP OF DIM GRIDS IN 5-MILE RADIUS |
1 |
0 |
Other |
View
|
86 |
4 A�� INTEGRITY MANAGEMENT A�� CONTEXT FOR USAGE OF DRAM FACTORS FROM ATMOS, EMAIL |
2 |
0 |
Other |
View
|
87 |
4 A�� INTEGRITY MANAGEMENT A�� LIST OF OPEN GRADE 2 AND 3 BELOWGROUND LEAKS |
4 |
0 |
Text/Image |
View
|
88 |
4 A�� INTEGRITY MANAGEMENT A�� NUMBER OF REPAIRED LEAKS IN MS THAT WERE RE-GRADED |
1 |
0 |
Other |
View
|
89 |
4 A�� INTEGRITY MANAGEMENT - EXCERPT OF DIM PLAN - IMP FLOW DIAGRAM |
1 |
0 |
Other |
View
|
90 |
4 A�� INTEGRITY MANAGEMENT - DIM SME LIST AND EXPERIENCE |
1 |
0 |
Other |
View
|
91 |
4 A�� INTEGRITY MANAGEMENT - ATMOS DIM ORGANIZATION STRUCTURE |
1 |
0 |
Other |
View
|
92 |
4 A�� INTEGRITY MANAGEMENT - EXCERPT OF DIM PROGRAM INTRODUCTION PPT FOR NTSB MTG (DIM OVERVIEW) |
1 |
0 |
Other |
View
|
93 |
5- EMERGENCY RESPONSE FACTUAL REPORT |
32 |
0 |
Text/Image |
View
|
94 |
5- EXCERPT FROM SERVICE PROCEDURE MANUAL- ATMOS EMERGENCY RESPONSE PROCEDURES |
16 |
0 |
Text/Image |
View
|
95 |
5- FIRE DEPARTMENT PIPELINE RESPONSE, EMERGENCY PLANNING, AND PREPAREDNESS- TOOL KIT |
12 |
0 |
Text/Image |
View
|
96 |
5- JACKSON FIRE DEPARTMENT- EOG 13- HAZARDOUS MATERIALS AND LARGE-SCALE INCIDENTS |
3 |
0 |
Text/Image |
View
|
97 |
5- BRISTOL BOULEVARD- FIRE DEPARTMENT COMPUTER AIDED DISPATCH REPORT |
4 |
0 |
Text/Image |
View
|
98 |
5- BRISTOL BOULEVARD- FIRE DEPARTMENT INCIDENT REPORT |
24 |
0 |
Text/Image |
View
|
99 |
5- SHALIMAR DRIVE- FIRE DEPARTMENT COMPUTER AIDED DISPATCH REPORT |
6 |
0 |
Text/Image |
View
|
100 |
5- SHALIMAR DRIVE- FIRE DEPARTMENT INCIDENT REPORT |
16 |
0 |
Text/Image |
View
|
101 |
6-FIRE AND EXPLOSION-FIRE DEPARTMENT REPORT (FIRE INVESTIGATOR REPORT-BRISTOL BLVD) |
2 |
0 |
Text/Image |
View
|
102 |
6-FIRE AND EXPLOSION-FIRE DEPARTMENT REPORT (FIRE INVESTIGATOR REPORT-SHALIMAR DRIVE) |
2 |
0 |
Text/Image |
View
|
103 |
6-FIRE AND EXPLOSION-24-073 MATERIALS LABORATORY FACTUAL REPORT (FIRE AND EXPLOSION INVESTIGATION) |
13 |
9 |
Text/Image |
View
|
104 |
7 - METEOROLOGY - FACTUAL REPORT |
15 |
0 |
Text/Image |
View
|
105 |
INTERVIEW WITH CREW LEADER, LOCATION 1 - ATMOS |
34 |
0 |
Text/Image |
View
|
106 |
7 - METEOROLOGY ATTACHMENT 1 - JACKSON, MS CLIMATOLOGICAL DATA |
7 |
0 |
Text/Image |
View
|
107 |
INTERVIEW WITH OPERATIONS SUPERVISOR - ATMOS |
33 |
0 |
Text/Image |
View
|
108 |
INTERVIEW WITH SURVEY TECH 2, LOCATION 1 - HEATH CONSULTANTS |
25 |
0 |
Text/Image |
View
|
109 |
INTERVIEW WITH CREW LEADER, LOCATION 2 - ATMOS |
26 |
0 |
Text/Image |
View
|
110 |
INTERVIEW WITH SERVICE TECH - ATMOS |
63 |
0 |
Text/Image |
View
|
111 |
INTERVIEW WITH SR. FIELD CONSTRUCTION COORDINATOR - ATMOS |
40 |
0 |
Text/Image |
View
|
112 |
INTERVIEW WITH SR. SERVICE TECH - ATMOS2 |
38 |
0 |
Text/Image |
View
|
113 |
INTERVIEW WITH LEAK SURVEY TECH, LOCATION 2 - HEATH CONSULTANTS |
30 |
0 |
Text/Image |
View
|
114 |
INTERVIEW WITH SENIOR UTILITY TECH - ATMOS |
65 |
0 |
Text/Image |
View
|
115 |
INTERVIEW WITH OPERATIONS MANAGER - ATMOS |
42 |
0 |
Text/Image |
View
|
116 |
INTERVIEW WITH AMERICAN MEDICAL RESPONSE SUPERVISORY PARAMEDIC |
22 |
0 |
Text/Image |
View
|
117 |
INTERVIEW WITH AMERICA MEDICAL RESPONSE PARAMEDIC |
29 |
0 |
Text/Image |
View
|
118 |
INTERVIEW WITH AMERICAN MEDICAL RESPONSE EMT |
19 |
0 |
Text/Image |
View
|
119 |
INTERVIEW WITH RESPONDING DISTRICT FIRE CHIEF - INCIDENT COMMANDER |
41 |
0 |
Text/Image |
View
|
120 |
INTERVIEW WITH JACKSON FIRE DEPARTMENT DISTRICT CHIEF AND FIRE INVESTIGATOR |
71 |
0 |
Text/Image |
View
|
121 |
INTERVIEW WITH CAPTAIN - RESCUE 14 - JACKSON FIRE DEPARTMENT |
60 |
0 |
Text/Image |
View
|
122 |
INTERVIEW OF RESIDENT OF 175 BRISTOL BLVD. |
4 |
0 |
Text/Image |
View
|
123 |
INTERVIEW OF THE RESIDENT OF 190 BRISTOL BLVD ON FEBRUARY 23, 2024 |
3 |
0 |
Text/Image |
View
|
124 |
INTERVIEW OF RESIDENTS OF 185 BRISTOL AND 190 BRISTOL |
26 |
0 |
Text/Image |
View
|
125 |
MS PSC INTERVIEW WITH TREE TRIMMER AT LOCATION 1 |
1 |
0 |
Text/Image |
View
|
126 |
MS PSC INTERVIEW WITH RESIDENT OF 175 BRISTOL BLVD. |
1 |
0 |
Text/Image |
View
|
127 |
MS PSC INTERVIEW WITH RESIDENT OF 1131 SHALIMAR DR. |
1 |
0 |
Text/Image |
View
|
128 |
MS PSC INTERVIEW WITH FORMER RESIDENT OF 1146 SHALIMAR DR. AND CAPTAIN - RESCUE 14 - JACKSON FIRE DEPARTMENT |
2 |
0 |
Text/Image |
View
|