# |
Title |
Pgs |
Photo |
Type |
File |
1 |
NTSB PIPELINE INVESTIGATION REPORT PIR-22/01 |
6 |
0 |
Text/Image |
View
|
2 |
NTSB PRELIMINARY REPORT |
2 |
0 |
Text/Image |
View
|
3 |
PARTY SUBMISSION - ENBRIDGE |
339 |
0 |
Text/Image |
View
|
4 |
1 - IIC - ACCIDENT SUMMARY |
2 |
0 |
Text/Image |
View
|
5 |
1 - IIC - SUMMARY OF POST-TECHNICAL REVIEW CHANGES |
2 |
0 |
Text/Image |
View
|
6 |
2 - OPS/IM - PIPELINE OPERATIONS AND INTEGRITY MANAGEMENT GROUP CHAIRMAN'S FACTUAL REPORT |
44 |
0 |
Text/Image |
View
|
7 |
2 - OPS/IM - LINE 10 ALIGNMENT SHEETS |
4 |
0 |
Text/Image |
View
|
8 |
2 - OPS/IM - GEOTECHNICAL CAUSATION REPORT BY BGC ENGINEERING USA INC. |
261 |
0 |
Text/Image |
View
|
9 |
2 - OPS/IM - EXCERPT - ENBRIDGE STANFORD AREA EMERGENCY RESPONSE PLAN |
14 |
0 |
Text/Image |
View
|
10 |
2 - OPS/IM - BASIC SYSTEM AND INCIDENT INFORMATION - ENBRIDGE RESPONSES TO PHMSA INFORMATION REQUESTS |
3 |
0 |
Text/Image |
View
|
11 |
2 - OPS/IM - FABRICATION RECORDS |
15 |
0 |
Text/Image |
View
|
12 |
2 - OPS/IM - CATHODIC PROTECTION TEST STATION ANNUAL READINGS - 3 YEARS |
1 |
0 |
Text/Image |
View
|
13 |
2 - OPS/IM - ORIGINAL DEPTH OF COVER |
1 |
0 |
Text/Image |
View
|
14 |
2 - OPS/IM - 2018 CLOSE INTERVAL SURVEYS |
27 |
0 |
Text/Image |
View
|
15 |
2 - OPS/IM - HYDROSTATIC TEST RECORDS |
23 |
0 |
Text/Image |
View
|
16 |
2 - OPS/IM - PRESSURE DATA FOR LINES 10, 15, 25 |
3 |
0 |
Text/Image |
View
|
17 |
2 - OPS/IM - ENBRIDGE'S EXPLANATION OF MONOTONIC PRESSURE DECREASE |
2 |
0 |
Text/Image |
View
|
18 |
2 - OPS/IM - PHMSA INCIDENT REPORTS |
27 |
0 |
Text/Image |
View
|
19 |
2 - OPS/IM - AIR PATROL RECORDS - JAN 2016 TO MAY 2020 - OWINGSVILLE SEGMENT |
4 |
0 |
Text/Image |
View
|
20 |
2 - OPS/IM - ENBRIDGE PROVIDED LISTING OF OPERATIONS, MAINTENANCE, AND INTEGRITY MANAGEMENT PROJECTS (5 YEARS PRIOR TO ACCIDENT) |
1 |
0 |
Text/Image |
View
|
21 |
2 - OPS/IM - LINE 10 STRAIN REPORTS DEVELOPED BY BAKER HUGHES FOR ENBRIDGE |
13 |
0 |
Text/Image |
View
|
22 |
2 - OPS/IM - BAKER HUGHES STRAIN ACCEPTABILITY LIMITS PROVIDED TO ENBRIDGE WITH STRAIN REPORTS |
6 |
0 |
Text/Image |
View
|
23 |
2 - OPS/IM - ENBRIDGE'S SUMMARY OF ITS PRE-ACCIDENT GEOHAZARD MANAGEMENT PROGRAM, SITE ASSESSMENT, AND MULTIDISCIPLINARY REVIEW |
51 |
0 |
Text/Image |
View
|
24 |
2 - OPS/IM - LINE 10 IN-LINE INSPECTION RESULTS SINCE 2007 EXCERPT |
5 |
0 |
Text/Image |
View
|
25 |
2 - OPS/IM - ENBRIDGE PROCEDURES IN EFFECT PRIOR TO ACCIDENT (EXCERPTS) |
16 |
0 |
Text/Image |
View
|
26 |
2 - OPS/IM - SUMMARY OF ENBRIDGE'S FINDINGS FOLLOWING ITS INVESTIGATION OF THE SUMMERFIELD OHIO INCIDENT |
5 |
0 |
Text/Image |
View
|
27 |
2 - OPS/IM - ENBRIDGE POST-ACCIDENT SAFETY IMPROVEMENTS |
6 |
0 |
Text/Image |
View
|
28 |
3 - MATLS - MATERIALS LABORATORY FACTUAL REPORT 21-085 |
3 |
0 |
Text/Image |
View
|
29 |
3 - MATLS - METALLURGICAL ANALYSIS OF FAILURE OF GIRTH WELD BY DNV GL USA, INC. AND SES, INC. |
278 |
0 |
Text/Image |
View
|
30 |
4 - MET - METEOROLOGY SPECIALIST'S FACTUAL REPORT |
6 |
0 |
Text/Image |
View
|
31 |
4 - MET - ATTACHMENT 1 TO THE METEOROLOGY SPECIALIST'S FACTUAL REPORT |
120 |
0 |
Text/Image |
View
|
32 |
4 - MET - ATTACHMENT 2 TO THE METEOROLOGY SPECIALIST'S FACTUAL REPORT |
98 |
0 |
Text/Image |
View
|
33 |
4 - MET - ATTACHMENT 3 TO THE METEOROLOGY SPECIALIST'S FACTUAL REPORT |
7 |
0 |
Text/Image |
View
|
34 |
5 - INTERVIEW - ENBRIDGE DIRECTOR OF GAS CONTROL 05.13.20 WITH ERRATA |
52 |
0 |
Text/Image |
View
|
35 |
5 - INTERVIEW - ENBRIDGE GAS CONTROLLER 'A' 05.15.20 WITH ERRATA |
40 |
0 |
Text/Image |
View
|
36 |
5 - INTERVIEW - ENBRIDGE AREA SUPERVISOR 05.11.20 WITH ERRATA |
83 |
0 |
Text/Image |
View
|
37 |
5 - INTERVIEW - ENBRIDGE STATION OPERATOR 05.11.20 WITH ERRATA |
28 |
0 |
Text/Image |
View
|
38 |
5 - INTERVIEW - ENBRIDGE ELECTRICAL CONTROL TECHNICIAN 05.11.20 WITH ERRATA |
37 |
0 |
Text/Image |
View
|
39 |
5 - INTERVIEW - ENBRIDGE LIGHT EQUIPMENT OPERATOR 05.11.20 WITH ERRATA |
24 |
0 |
Text/Image |
View
|
40 |
5 - INTERVIEW - ENBRIDGE PIPELINER 'A' 05.11.20 WITH ERRATA |
24 |
0 |
Text/Image |
View
|
41 |
5 - INTERVIEW - ENBRIDGE PIPELINER 'B' 05.11.20 WITH ERRATA |
17 |
0 |
Text/Image |
View
|
42 |
5 - INTERVIEW - ENBRIDGE MECHANIC 05.11.20 WITH ERRATA |
16 |
0 |
Text/Image |
View
|