Project Summary: Rail Investigation - 83 Docket Items - DCA17MR007

Description: Train derailment

Mode: Rail

NTSB Number: DCA17MR007

Date of Accident: 03/10/2017

City: Graettinger

State/Region: IA

Country: United States

Project Type: Investigation


Docket Information

Creation Date: 12/12/2017

Last Modified: 10/24/2018 7:10 AM

Public Release Date & Time: 12/14/2017 11:00 AM


Docket Table of Contents

Docket Items: 83
#
Title
Pgs
Photo
Type
File
1 NTSB Chairman Letter to Union Pacific Railroad Chairman, President, and CEO 17 0 Adobe PDF file View
2 Accident Summary 3 1 Adobe PDF file View
3 Onboard Image Recorder - Specialist's Factual Report 4 2 Adobe PDF file View
4 Weather Study Report 31 0 Adobe PDF file View
5 Track and Engineering Factual Report 27 7 Adobe PDF file View
6 Track and Engineering Factual Addendum- FRA Post Accident Inspections 3 0 Adobe PDF file View
7 FRA Post-Accident Track Inspection Records Dated May 2017 6 0 Adobe PDF file View
8 Estherville Subdivision Track Profile 30 0 Adobe PDF file View
9 Bridge-Spanning Jack Creek- Data 6 0 Adobe PDF file View
10 UP Estherville Subdivision Track Inspection Records 256 0 Adobe PDF file View
11 UP Estherville Subdivision Rail Cut-In, Cut-Out Report 1 0 Adobe PDF file View
12 UP Track Inspection Playbook for Accident Location 26 0 Adobe PDF file View
13 UP Continuous Welded Rail Procedures 17 0 Adobe PDF file View
14 UP Ultrasonic Rail Test Report- Dated May, 2016 6 0 Adobe PDF file View
15 UP Ultrasonic Rail Test Report- Dated July, 2015 5 0 Adobe PDF file View
16 UP Geometry Survey Report- Dated May, 2015 11 0 Adobe PDF file View
17 UP Geometry Survey Report- Dated August, 2016 8 0 Adobe PDF file View
18 Drawing of 90 LB. Rail Section 1 0 Adobe PDF file View
19 FRA Inspection Report No. 28- Dated March, 2015 2 0 Adobe PDF file View
20 FRA Inspection Report No.55 & 76 - 2015 4 0 Adobe PDF file View
21 FRA Inspection Report No. 58- Dated June, 2016 1 0 Adobe PDF file View
22 FRA Inspection Report No. 67- Dated August, 2016 3 0 Adobe PDF file View
23 FRA Inspection Report No. 109 & 110- 2016 2 0 Adobe PDF file View
24 FRA Inspection Report No. 29 - Dated March 10, 2017 1 0 Adobe PDF file View
25 FRA Inspection Report No. 30- Dated March 11, 2017 3 0 Adobe PDF file View
26 Interview of UP Track Inspector 52 0 Adobe PDF file View
27 Interview of UP Section Foreman 18 0 Adobe PDF file View
28 Interview of UP Bridge Inspector 34 0 Adobe PDF file View
29 Interview of UP Manager of Track Maintenance 30 0 Adobe PDF file View
30 Interview of FRA Regional Administrator- Region 6 45 0 Adobe PDF file View
31 FRA Compliance Agreement Response 2 0 Adobe PDF file View
32 FRA Post Accident Track Inspection Records- Dated May 2017 18 0 Adobe PDF file View
33 Railroad Track Miles by FRA Region 2 0 Adobe PDF file View
34 UP Post-Accident Action Letter 2 0 Adobe PDF file View
35 Aerial Imagery Report 7 8 Adobe PDF file View
36 Aerial Imagery Att1 - Orthomosaic Map of Site 0 0 kmz View
37 Aerial Imagery Att2 - 3Dpdf 1 0 Adobe PDF file View
38 Aerial Imagery Att3 - 3D model fly through video (Shelf Item) 1 0 Adobe PDF file View
39 Hazardous Materials Group Factual Report 37 22 Adobe PDF file View
40 Hazardous Materials Attachment 1 - Green Plains Superior, IA - Denatured vs. Undenatured Ethanol Shipments 2 0 Adobe PDF file View
41 Hazardous Materials Attachment 2 - Green Plains Superior Transfer Record and Inventory 5 0 Adobe PDF file View
42 Hazardous Materials Attachment 3 - Train Consist UEGKOT 09 29 0 Adobe PDF file View
43 Hazardous Materials Attachment 4 - AEI Report for Train UEGKOT 09 6 0 Adobe PDF file View
44 Hazardous Materials Attachment 6 - Bills of Lading for Accident Tank Cars 17 0 Adobe PDF file View
45 Hazardous Materials Attachment 7 - Safety Data Sheet Undenatured Fuel Ethanol 10 0 Adobe PDF file View
46 Hazardous Materials Attachment 8 - Green Plains Electronic Data Interchange EDI 404 Summary Record 1 0 Adobe PDF file View
47 Hazardous Materials Attachment 9 - Original EDI 404 Record, March 9, 2017 6 0 Adobe PDF file View
48 Hazardous Materials Attachment 10 - Attempted Correction to EDI 404, March 10, 2017 5 0 Adobe PDF file View
49 Hazardous Materials Attachment 12 - Outage Calculations for Derailed Tank Cars 1 0 Adobe PDF file View
50 Hazardous Materials Attachment 13 - Tank Car Loading and Pretransport Checklists 80 0 Adobe PDF file View
51 Hazardous Materials Attachment 14 - Safety Data Sheet Denatured Fuel Ethanol 10 0 Adobe PDF file View
52 Hazardous Materials Attachment 15 - Train Crew Radio Transmission Transcript, March 10, 2017 1247 a.m. 5 0 Adobe PDF file View
53 Hazardous Materials Attachment 16 - CTEH Air Monitoring Summary 16 0 Adobe PDF file View
54 Hazardous Materials Attachment 17 - Arcadis Emergency Response Activity Report to Iowa DNR, April 10, 2017 14 0 Adobe PDF file View
55 Hazardous Materials Attachment 18 - AAR Flammable Liquids Tank Car Fleet Statistics, March 31, 2017 13 0 Adobe PDF file View
56 Hazardous Materials Attachment 19 - Tank Car Damage Report 20 0 Adobe PDF file View
57 Hazardous Materials Attachment 20 - Tank Car Damage Assessment Summariies 3 0 Adobe PDF file View
58 Hazardous Materials Attachment-FRA Arcadia OH Report 9 0 Adobe PDF file View
59 Operations Factual 10 0 Adobe PDF file View
60 Addendum to Operations Factual Report; Toxicology results 2 0 Adobe PDF file View
61 Operations - Interview Engr on UEGKOT09 26 0 Adobe PDF file View
62 Operations - Interview of Condr. UEGKOT09 21 0 Adobe PDF file View
63 Operations - Interview previous train crew member (1) 12 0 Adobe PDF file View
64 Operations - Interview crew member previous train (2) 11 0 Adobe PDF file View
65 Operations - Interview of Train Dispatcher 24 0 Adobe PDF file View
66 Mechanical - In-Service Tank Car Net Braking Ratio Testing 56 0 Adobe PDF file View
67 Materials Laboratory Factual Report 57 0 Adobe PDF file View
68 Locomotive Event Recorder - Specialist’s Factual Report 6 0 Adobe PDF file View
69 Locomotive Event Recorder - Attachment 1 (Tabular data) 0 0 Comma-delimited data file View
70 Mechanical Factual Report 11 6 Adobe PDF file View
71 Mechanical-Class I Brake Test Record 1 0 Adobe PDF file View
72 Mechanical-Blue Card Records 8 0 Adobe PDF file View
73 Mechanical-Daily Inspection Records 6 0 Adobe PDF file View
74 Emergency Response Factual Report 4 1 Adobe PDF file View
75 Party Submission-BLET 19 0 Adobe PDF file View
76 Party Submission-BMWED 7 0 Adobe PDF file View
77 Finite Element Modeling Study Report 15 0 Adobe PDF file View
78 Locomotive Event Recorder - Ancillary Data Factual Report 6 0 Adobe PDF file View
79 Locomotive Event Recorder Ancillary Data Factual Report - Attachment 1 (UP8376 Tabular Data) 0 0 Comma-delimited data file View
80 Locomotive Event Recorder Ancillary Data Factual Report - Attachment 2 (UP8037 Tabular Data) 0 0 Comma-delimited data file View
81 Conductor Toxicology Results 2 0 Adobe PDF file View
82 Engineer Toxicology Results 2 0 Adobe PDF file View
83 Adopted NTSB Report 85 0 Adobe PDF file View